GoldMining Files Technical Report for its Almaden Gold Project, Idaho, USA

Resource Estimates Technical Reports (NI 43-101)

GoldMining Files Technical Report for its Almaden Gold

Project, Idaho, USA

VANCOUVER, BC

,

July 15, 2020

/CNW/ -

GoldMining Inc. (the "

Company

" or "

GoldMining

")

(TSX: GOLD) (OTCQX: GLDLF) is

pleased to announce that further to its press release dated

June 3, 2020

, the Company has filed a National Instrument 43-101 (NI

43-101) technical report (the "Technical Report") for its Almaden Gold Project (the "Project" or "Almaden") located in

Idaho, USA

.

The Technical Report, dated effective

April 1, 2020

, is titled "Technical Report: Almaden Gold Property,

Washington County,

Idaho

, USA". The Technical Report was authored by

Greg Z. Mosher

, M.Sc., P.Geo., of Global Mineral Resource Services, who

is a qualified person within the meaning of NI 43-101, is independent of the Company and has reviewed and approved the

disclosure regarding the resource estimate for Almaden disclosed herein.

The Almaden Project covers approximately 1,724 Ha and is located 140 km by road north of

Boise

and 24 km east of

Weiser

in

Washington County

, Idaho. Almaden is host to low-sulphidation epithermal mineralization that was the subject of an updated

mineral resource estimate using a cut-off grade of 0.3 g/t gold for pit constrained resources as documented in the Technical

Report (Table 1).

Table 1: Mineral resource statement

1

using a 0.3 g/t gold cut-off for the Almaden Gold Project,

Idaho

.

Classification

Tonnes

Gold Grade

Gold Ounces

g/t

oz

Indicated

43,470,000

0.65

910,000

Inferred

9,150,000

0.56

160,000

Table 1 Notes:

1.

Mineral resources are not mineral reserves and do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources will be converted into mineral reserves

.

The estimate of mineral

resources may be materially affected by environmental permitting, legal, title, taxation, sociopolitical, marketing or other relevant issues.

2.

All quantities are rounded to the appropriate number of significant figures; consequently, sums may not add up due to rounding.

3.

Pit constrained resources with reasonable prospects of eventual economic extraction stated above a 0.30 g/t Au cut-off.

4.

Pit optimization is based on an assumed gold price of US$1,500/oz, mining cost of US$2.25/t, processing cost of US$10.00/t and pit slope of 45°.

Readers should refer to the Technical Report, a copy of which is available under the Company's profile at

www.SEDAR.com

, for

further information regarding the resource estimate contained herein and the Project.

Qualified Persons

Paulo Pereira

, President of GoldMining Inc. has reviewed and approved the technical information contained in this news release.

Mr. Pereira holds a Bachelors degree in Geology from Universidade do Amazonas in

Brazil

, is a Qualified Person as defined in NI

43-101 and is a member of the Association of Professional Geoscientists of

Ontario

.

About GoldMining Inc.

GoldMining Inc. is a public mineral exploration company focused on the acquisition and development of gold assets in the

Americas. Through its disciplined acquisition strategy, GoldMining now controls a diversified portfolio of resource-stage gold and

gold-copper projects and royalties in

Canada

,

U.S.A.

,

Brazil

,

Colombia

and Peru. Additionally, GoldMining owns a 75% interest in

the Rea Uranium Project, located in the

Western Athabasca

Basin of

Alberta, Canada

.

Forward-looking Statements

This document contains certain forward-looking statements that reflect the current views and/or expectations of GoldMining with

respect to its business and future events, including statements with respect to the details of the mineral resource estimate.

Forward-looking statements are based on the then-current expectations, beliefs, assumptions, estimates and forecasts about the

business and the markets in which GoldMining operates. Investors are cautioned that all forward-looking statements involve

risks and uncertainties, including: the inherent risks involved in the exploration and development of mineral properties, the

uncertainties involved in interpreting drill results and other exploration data, the geology, grade and continuity of mineral

deposits, the possibility that future exploration, development or mining results will not be consistent with GoldMiningꞌs

expectations, title and permitting matters, fluctuating metal prices and uncertainties relating to the availability and costs of

financing needed in the future. These risks, as well as others, including those set forth in GoldMiningꞌs Annual Information Form

for the year ended

November 30, 2019

and other filings with Canadian securities regulators, could cause actual results and

events to vary significantly. Accordingly, readers should not place undue reliance on forward-looking statements and

information. There can be no assurance that forward-looking information, or the material factors or assumptions used to

develop such forward looking information, will prove to be accurate. GoldMining does not undertake any obligations to release

publicly any revisions for updating any voluntary forward-looking statements, except as required by applicable securities law.

View original content:

http://www.prnewswire.com/news-releases/goldmining-files-technical-report-for-its-almaden-gold-project-idaho-usa-301093528.html

SOURCE

GoldMining Inc.

View original content:

http://www.newswire.ca/en/releases/archive/July2020/15/c7938.html

%SEDAR: 00031036E

For further information:

GoldMining Inc., Amir Adnani, Chairman; Garnet Dawson, CEO, Telephone: (855) 630-1001, Email: