Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GOLD.TO ·

GoldMining Drilling Intercepts Gold Mineralization at Depth, São Jorge Project Pará State, Brazil

Drill Results

GoldMining Drilling Intercepts Gold Mineralization at Depth, São Jorge

Project Pará State, Brazil

VANCOUVER, BC

,

Jan. 26, 2026

/CNW/ - GoldMining Inc. (the "

Company

" or "

GoldMining

") (TSX: GOLD) (NYSE American: GLDG) is pleased to

report additional assay results from the 2025 drilling program at its 100% owned São

Jorge Project ("

São

Jorge

" or the "

Project

") in the Tapajós gold

district ("

Tapajós

"), Pará State,

Brazil

. The results are from the previously announced diamond core drilling program consisting of 3,862

metres

(m)

drilling designed to test below and along trend of the existing São Jorge mineral resource estimate area (the "

Deposit

"), and to further support the initial

reverse circulation ("

RC

") drilling results that previously identified exploration discoveries at four new gold prospects, including at the William South,

William North

, Ivonette and Dragon West prospects within a two kilometre ("

km

") radius of the existing Deposit (see news release October

20, 2025;

January

6, 2026).

Highlights:

São Jorge Diamond Core Drilling Results:

19 m

at 1.00 grams per tonne (g/t) gold (Au) from

425 m

depth (SJD-136-25).

Within a broader zone of

73 m

at 0.54 g/t Au from

422 m

depth.

SJD-136-25 was drilled beneath the existing mineral resource estimate constraining pit shell and represents one of the deepest drill

intercepts at the project to date.

3 m

at 1.10 g/t Au

from

10 m

depth and

1 m

at 1.15 g/t Au from

45 m

depth (SJD-133-25) at São Jorge Deposit

'Northwest' Extension

prospect.

Processing of Induced Polarisation

("IP")

data collected in 2025 confirms a broad

chargeability high anomaly at William South

similar in scale to

the known IP signature of the São Jorge Deposit.

The IP anomaly extends more than 1km and is located approximately 2 km from the Deposit.

Drilling over the highest chargeability core of the IP anomaly is planned in 2026.

The Company has recently remobilized the geophysical survey team to continue expanding the IP survey to the east of the existing grid.

Exploration results received to date support the broader potential for future extensions of the presently delineated São Jorge deposit through

additional exploration work and delineation of potential new discoveries of gold mineralization across the 46,000 hectare 100% owned São Jorge

Project.

Alastair Still

, Chief Executive Officer of GoldMining, commented:

"GoldMining is pleased with the results of the 2025 diamond core drilling program

which has identified mineralization that may extend the known depth of the São Jorge gold deposit. We're encouraged by the potential for additional

systematic drilling to potentially extend the mineral resource deeper. Drilling also provided additional indications of a potential continuation of

mineralization along strike of the Deposit to the northwest. Furthermore, the 2025 IP survey expansion over targets that contain some of the largest,

highest tenor and most continuous gold-in-soil anomalies on the property, has discovered the William South IP Anomaly, a large, high tenor chargeability

feature with scale similar to the IP signature of the Deposit itself. The systematic approach by the technical team to building up multiple lines of evidence

points towards an exciting emerging target area at William South which has yet to be tested systematically by drilling. We look forward to announcing

2026 exploration plans in due course. The excellent infrastructure at the Project helps facilitate our exploration activities to potentially deliver significant

growth on a highly prospective regional-scale property in the rapidly emerging Tapajós gold district."

Project Overview

The São Jorge Gold Project is located in the Tapajós gold district (see

Figure

1

) in the south-central portion of the Amazon Craton. The São Jorge gold

deposit is a granite-hosted, intrusion-related gold mineral system which is a similar style to the Tocantinzinho gold mine located approximately 80 km

northwest of São Jorge. Exploration activities at the Project carried out by the Company over the past two years have successfully delineated several

new exploration targets comprising gold ± copper ± molybdenum ± silver soil geochemical anomalies, which cumulatively outline a large mineral system

(see news releases dated

March 18

and

April 14, 2025

). The São Jorge mineral system is defined by a comprehensive exploration data set which the

Company has developed over previous systematic exploration campaigns. Surrounding the currently delineated São Jorge deposit, which has a defined

1.4 km strike length, the broader mineral system comprises a zone of contiguous surface geochemical anomalies over an area of 12

km

x 7

km, which

the Company interprets to be the surface expression of a broad intrusion related gold system.

The 2025 São Jorge exploration program comprised a total of

9,533 m

of drilling, which exceeded the total planned meterage of

9,000 m

while remaining

on–budget, including 3,862

m diamond core, 3,528

m

RC and 2,143

m auger drilling.

Figure 1

Tapajós Gold District and location of the São Jorge Project. (CNW Group/GoldMining Inc.)

2025 São Jorge Diamond Core Drilling Program

The objective of the 2025 diamond core drilling program was to test several target areas within 1-2 kilometres of the Deposit, including immediate

wingspan extensions along strike and to depth, and an emerging target area at the William South Prospect, which is located 1.5

km north of the Deposit;

see

Figure

2

.

Figure 2

São Jorge Project drill results, as of January 26, 2026. (CNW Group/GoldMining Inc.)

Figure 3

São Jorge Deposit diamond core drill results, as of January 26, 2026. (CNW Group/GoldMining Inc.)

Deposit Wingspan Expansion Drilling

Five diamond core holes were drilled on 2 x 200 metre step-out drill sections along trend to the southeast of the São Jorge Deposit. Drilling targeted the

projected strike continuation of the Deposit and extended southwards across strike to test a broad deep IP chargeability anomaly. Drilling intersected

intercalated syenogranite and volcanics in contact with monzogranite intrusives, with rare thin quartz veins and broad zones of 0.5 – 2% pyrite

mineralization which is likely the source of the IP chargeability anomalism in bedrock. Assays indicated this zone of chargeability is weakly mineralized

with respect to gold, with a best intercept of

1 m

at 0.90g/t Au from

2m

depth in colluvial cover, and

1 m

at 0.24 g/t Au from

45 m

depth in bedrock.

Three diamond core holes were drilled along trend to the northwest of the Deposit, located approximately 1 kilometre from the western limit of the

currently delineated Deposit, to follow-up on 2024 core intercepts which returned

10 m

at 0.66 g/t Au from

93 m

depth (news release

September 9,

2025

). The 2025 diamond core drilling successfully intersected the monzogranite (host rock) - syenogranite contact, which is the focus of structural

deformation and mineralization at the Deposit. The drilling returned encouraging intercepts of

3 m

at 1.10 g/t Au from

10 m

depth and

1 m

at 1.15 g/t Au

from

45 m

depth (SJD-133-25). Additional drilling is warranted over the 1

kilometre of strike between the NW Extension and the Deposit, as well as

further northwest along strike.

Two deep diamond core drill holes were drilled below the Deposit, testing the potential down-dip extension of mineralization below the depth of the

current mineral resource estimate constraining pit shell (see

Figure

3

). Both holes were targeted to test pierce points on the plane of mineralization

projected down plunge of discontinuous high-grade shoots evident in long section view.

SJD-136-25 drilled below a high grade zone of mineralization at the western end of the proposed pit shell, intersecting

19 m

at 1.00 g/t Au from

425 m

depth, within a broader zone of

73 m

at 0.54

g/t

Au from

422 m

depth. Mineralization occurred within the expected down-dip projection of the mineralized

plane, comprising quartz veins and sulphide mineralization within sheared and fractured monzogranite.

SJD-138-25 returned a best intercept of

1 m

at 1.25 g/t Au from

175 m

depth, which was above the targeted pierce point and hosted in syenogranite;

whereas in the projected target zone deeper within the monzogranite host rock, drilling intersected quartz veining and sulphides with only low grade gold

values. Gold grade distribution within the Deposit is interpreted to be a function of the intersection of cross-structures with the main WNW-ESE striking

mineralized trend. Mineralization remains broadly open at depth below the currently delineated Deposit and therefore additional drilling is warranted to

test for potential additional extensions of the mineral resource.

William South Prospect

The emerging William South target area was initially identified by gold-in-soil geochemistry sampling which returned high tenor results over a broad 2 km

x 2 km area located approximately 2

kilometres north of the Deposit, with soil assays peaking at 2,163 ppb Au (2.163 g/t Au). Shallow auger drilling

completed in 2024 returned encouraging intercepts including

1 m

at 17.14g/t Au from

12 m

depth,

1 m

at 10.2 g/t Au from

14 m

depth,

5 m

at 2.78 g/t Au

from

10 m

depth and

3 m

at 1.05 g/t Au from

12 m

depth (news release

November 11, 2024

). The gold-in-auger intercepts were initially interpreted to be

at the top of the saprolitic (weathered bedrock) horizon, but they could represent a colluvial layer at the base of the transported overburden as it is

difficult to distinguish transported clay from

in situ

weathered bedrock clay within the saprolitic weathering profile that is typical in the district.

Diamond core drilling intersected monzogranite with rare thin quartz veins and minor sulphide mineralization, returning a best result of

1 m

at 0.75 g/t Au

from

87 m

(SJD-130-25). The drilling was completed prior to completion of the 2025 IP survey which extended the geophysical data set northward from

the Deposit over the William South and North prospect areas. IP image processing is now completed which has revealed that the 2025 diamond core

drilling at William South tested an area of moderate-high but discontinuous IP chargeability, which is located on the southern flank of a larger, higher tenor

and more continuous IP chargeability anomaly – the 'William South IP Anomaly' (see Figure 2) - which is similar in scale to the chargeability signature

associated with the Deposit. Recently released RC drill results (

January 6, 2026

) for 2025 drilling also located on the southern flank of the main IP

chargeability anomaly returned encouraging drill intercepts including

12 m

at 2.38 g/t Au from

13 m

depth,

4 m

at 1.11 g/t Au from

46 m

depth and

1 m

at

1.23

g/t

Au from

16 m

depth. The core of the main William South IP anomaly has not yet been drill tested and remains a high priority for 2026 exploration

programs.

Table 1 São Jorge

2025 DDH

results at William South prospect (as of

January 26

, 2026).

Prospect Name

Drill Hole

Number

Interval

From (m)

Interval

To (m)

Sample

Length (m)

Au Grade

(g/t)

Ag Grade

(g/t)

Cu Grade

(ppm)

SE Extension

SJD-125-25

28

29

1

0.14

0.11

81

178

179

1

0.16

0.09

45

244

247

3

0.10

0.22

130

272

273

1

0.10

0.48

269

William South

SJD-126-25

2

9

7

0.20

1.22

30

including

8

9

1

0.83

2.58

30

13

14

1

0.37

5.20

49

54

55

1

0.10

0.03

32

SJD-126B-25

8

9

1

0.17

0.83

18

William South

20

21

1

0.20

0.63

18

73

77

4

0.14

0.04

3

including

76

77

1

0.41

0.06

5

85

86

1

0.20

0.07

25

SE Extension

SJD-127-25

NSR

William South

SJD-128-25

134

138

4

0.10

0.04

8

including

134

135

1

0.25

0.06

10

146

151

5

0.11

0.05

6

including

146

147

1

0.32

0.07

5

194

195

1

0.11

0.16

34

196

197

1

0.10

0.02

3

200

201

1

0.11

0.04

5

SE Extension

SJD-129-25

2

3

1

0.90

0.85

11

7

8

1

0.15

3.64

66

45

46

1

0.24

0.13

99

William South

SJD-130-25

49

50

1

0.34

0.04

2

62

65

3

0.18

0.08

142

including

62

63

1

0.39

0.20

294

87

88

1

0.75

0.35

11

163

164

1

0.24

0.39

733

169

171

2

0.11

0.19

226

William South

SJD-131-25

189

190

1

0.11

0.04

10

SE Extension

SJD-132-25

NSR

NW Extension

SJD-133-25

0

1

1

0.22

0.25

36

3

4

1

0.11

0.06

33

10

13

3

1.10

0.11

34

including

10

11

1

2.20

0.14

29

35

36

1

0.63

0.22

26

45

46

1

1.15

0.18

26

54

55

1

0.83

0.17

14

101

102

1

0.15

1.43

289

SE Extension

SJD-134-25

13

14

1

0.16

2.56

30

NW Extension

SJD-135-25

NSR

Deposit Deeps

SJD-136-25

53

54

1

0.21

---

76

74

75

1

0.28

---

530

164

165

1

0.14

0.17

10

167

168

1

0.22

0.25

4

173

174

1

0.11

0.07

53

246

255

9

0.12

0.07

66

including

253

254

1

0.52

0.15

56

271

273

2

0.17

0.15

24

292

295

3

0.36

0.60

196

306

307

1

0.13

0.29

682

323

324

1

0.15

9.63

3,466

328

329

1

0.12

0.29

292

342

343

1

0.14

0.15

15

344

345

1

0.12

0.29

6

346

347

1

0.14

0.15

7

377

379

2

0.45

0.16

139

including

377

378

1

0.81

0.22

83

390

412

22

0.36

0.21

36

including

394

397

3

0.99

0.24

2

422

495

73

0.54

0.18

57

including

425

444

19

1.00

0.22

1

including

435

436

1

4.11

0.29

1

and

454

455

1

2.26

0.13

1

and

481

482

1

4.96

0.35

9

and

492

493

1

0.22

0.57

2,330

NW Extension

SJD-137-25

203

204

1

0.44

0.17

11

248

249

1

0.13

0.10

30

Deposit Deeps

SJD-138-25

4

6

2

0.12

5.23

52

74

75

1

0.12

0.08

2

87

91

4

0.36

0.09

28

including

88

89

1

0.97

0.17

32

103

107

4

0.80

0.35

222

120

121

1

0.15

0.06

14

132

137

5

0.17

0.17

179

including

136

137

1

0.51

0.42

666

150

151

1

0.64

0.45

31

158

163

5

0.14

0.51

637

172

176

4

0.41

0.34

15

including

175

176

1

1.25

0.51

13

240

241

1

0.16

0.07

27

251

252

1

0.38

0.25

240

264

265

1

0.13

0.28

5

268

269

1

0.27

0.20

6

278

282

4

0.16

0.23

2

304

305

1

0.10

0.26

103

306

307

1

0.12

0.23

305

390

392

2

0.23

0.30

4

411

412

1

0.18

0.12

7

420

422

2

0.19

0.12

14

437

443

6

0.19

0.15

9

including

439

440

1

0.43

0.06

2

Notes: NSR: 'No Significant Result'. True width of mineralization is estimated to be approximately two-thirds of downhole length, assuming primarily steeply dipping vein-hosted mineralization intersected by inclined (-60° dip) drill holes. Assays >1 g/t Au in bold; drill holes

highlighted in this release are shaded.

Table 2 São Jorge 2025 DDH drill hole collar location coordinates (as of

January 26, 2026

).

Hole Number

Easting

Metres

(UTM Zone

21S)

Northing

Metres

(UTM Zone

21S)

Elevation

(m above

sea level)

Dip

(°)

Azimuth

(°)

Depth (m)

Status

SJD-125-25

658134

9282526

211.43

60

180

399.63

Reached Target Depth

SJD-126-25

656604

9284453

213.87

50

360

65.93

Hole failed - Collapsing

SJD-126B-25

656605

9284456

213.85

50

360

167.67

Reached Target Depth

SJD-127-25

658161

9282596

216.74

60

180

220.66

Reached Target Depth

SJD-128-25

656601

9284550

211.60

50

360

201.23

Reached Target Depth

SJD-129-25

658116

9282427

210.84

60

180

364.49

Reached Target Depth

SJD-130-25

656584

9284596

210.50

50

010

201.05

Reached Target Depth

SJD-131-25

656793

9284403

213.45

50

360

200.22

Reached Target Depth

SJD-132-25

658352

9282153

226.46

60

360

204.29

Reached Target Depth

SJD-133-25

655904

9283712

216.72

50

360

200.13

Reached Target Depth

SJD-134-25

658345

9282247

221.63

60

360

201.69

Reached Target Depth

SJD-135-25

656053

9283657

222.89

50

360

200.57

Reached Target Depth

SJD-136-25

657128

9282624

255.31

60

360

511.79

Reached Target Depth

SJD-137-25

655911

9283578

227.63

50

360

270.29

Reached Target Depth

SJD-138-25

657365

9282632

226.90

70

360

449.81

Reached Target Depth

Data Verification

For drill core sampling, samples were taken from the NQ/HQ core by sawing the drill core in half, with one-half sent to SGS Geosol Laboratórios Ltda.

("

SGS

") in

Brazil

for assaying, and the other half of the core retained at the site for future reference. Sample lengths downhole were uniformly

1.0 m

. For

the auger drilling program, samples were collected at

1 m

sample intervals, with the material being dried, homogenized and split in the field to obtain a 1

kg representative sample which was sent to SGS for analysis. The remaining auger sample material is stored until the lab results are received, and a 1

kg sample duplicate is maintained in the archive. For the RC drilling program, samples were collected at

1 m

sample intervals, generating approximately

25 kg samples, with the material being dried, homogenized and split in the field to obtain a 1 kg representative sample which was sent to SGS for

analysis. The remaining RC sample material is stored until the lab results are received, and approximately 20 kg of the original samples are maintained in

the archive.

SGS is a certified commercial laboratory located in Vespasiano, Minas Gerais,

Brazil

, and is independent of GoldMining. GoldMining has implemented a

quality assurance and quality control program for the sampling and analysis of drill core and auger samples, including duplicates, mineralized standards

and blank samples for each batch of 100 samples. The gold analyses are completed by FAA505 method (fire-assay with an atomic absorption finish on

50 grams of material).

Qualified Person

Paulo Pereira

, P. Geo., Country Manager,

Brazil

of GoldMining, has supervised the preparation of, verified and approved all scientific and technical

information herein this news release. Mr. Pereira is also a qualified person as defined in National Instrument 43-101 – Standards of Disclosure for

Mineral Projects ("

NI 43-101

").

Visit

www.goldmining.com

for more information, including high-resolution figures, and to review the Technical Report titled "NI 43-101 Technical Report,

São Jorge Project, Pará State,

Brazil

," with an effective date of

January 28, 2025

.

About GoldMining Inc.

GoldMining Inc. is a public mineral exploration company focused on acquiring and developing gold assets in the Americas. Through its disciplined

acquisition strategy, GoldMining now controls a diversified portfolio of resource-stage gold and gold-copper projects in

Canada

, the

U.S.A.

,

Brazil

,

Colombia

, and

Peru

. The Company also owns approximately 21.5 million shares of Gold Royalty Corp. (NYSE American: GROY), 9.9 million shares of

U.S. GoldMining Inc. (Nasdaq: USGO) and 19.1 million shares of NevGold Corp. (TSXV: NAU). See

www.goldmining.com

for additional information.

Notice to Readers

Technical disclosure regarding

São Jorge

has been prepared by the Company in accordance with NI 43-101. NI 43-101 is a rule of the Canadian

Securities Administrators which establishes standards for all public disclosure an issuer makes of scientific and technical information concerning

mineral projects. These standards differ from the requirements of the U.S. Securities and Exchange Commission ("SEC") and the scientific and

technical information contained in this news release may not be comparable to similar information disclosed by domestic

United States

companies

subject to the SEC's reporting and disclosure requirements.

Cautionary Statement on Forward-looking Statements

Certain of the information contained in this news release constitutes "forward-looking information" and "forward-looking statements" within the meaning

of applicable Canadian and U.S. securities laws ("forward-looking statements"), which involve known and unknown risks, uncertainties and other

factors that may cause the Company's actual results, performance and achievements to be materially different from the results, performance or

achievements expressed or implied therein. Forward-looking statements, which are all statements other than statements of historical fact, include, but

are not limited to, statements respecting the Company's expectations regarding the Project, ongoing exploration programs and other expected future

work programs thereat, and often contain words such as "anticipate", "intend", "plan", "will", "would", estimate", "expect", "believe", "potential" and

variations of such terms. Such forward-looking statements are based on the then-current expectations, beliefs, assumptions, estimates and forecasts

about the business and the markets in which GoldMining operates, which may prove to be incorrect. Investors are cautioned that forward-looking

statements involve risks and uncertainties, including, without limitation: the inherent risks involved in the exploration and development of mineral

properties, fluctuating metal prices, unanticipated costs and expenses, risks related to government and environmental regulation, social, permitting

and licensing matters, any inability to complete work programs as expected, the Company's plans with respect to the Project may change as a result of

further planning or otherwise, and uncertainties relating to the availability and costs of financing needed in the future. These risks, as well as others,

including those set forth in GoldMiningꞌs most recent Annual Information Form and other filings with Canadian securities regulators and the SEC, could

cause actual results and events to vary significantly. Accordingly, readers should not place undue reliance on forward-looking statements. There can

be no assurance that forward-looking statements, or the material factors or assumptions used to develop such forward-looking statements, will prove

to be accurate. The Company does not undertake to update any forward-looking statements, except in accordance with applicable securities law.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/goldmining-drilling-intercepts-gold-mineralization-at-depth-sao-jorge-project-para-state-brazil-302669755.html

SOURCE

GoldMining Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2026/26/c3096.html

%SEDAR: 00031036E

For further information:

For additional information, please contact: GoldMining Inc., Amir Adnani, Co-Chairman; David Garofalo, Co-Chairman; Alastair

Still, President and CEO; Telephone: (855) 630-1001, Email: [email protected]

CO: GoldMining Inc.

CNW 06:30e 26-JAN-26