G Mining Ventures Extends High-Grade Mineralization at Gurupi and Confirms Continuity at Depth at TZ

Drill Results

Page | - 1 -

G Mining Ventures Extends High-Grade Mineralization at

Gurupi and Confirms Continuity at Depth at TZ

BROSSARD, QC, September 16 , 2026 – G Mining Ventures Corp . (“GMIN” or the

“Corporation”) (TSX:GMIN | OTCQX:GMINF) today provides an update on its exploration drilling

activities completed at its wholly owned Gurupi Project (“Gurupi” or the “Project”) in Maranhão

state, Brazil and Tocantinzinho mine (“TZ”) in Pará State, Brazil. At Gurupi, drilling continues to

demonstrate extensions to known mineralization at the Blanket (“Blanket”) and Mandiocal

(“Mandiocal”) deposits and while maiden drilling at the Grodiocal target (“ Grodiocal”) has

confirmed a new near-surface gold discovery. At TZ, drilling below the current pit design confirms

the continuity of mineralization at depth, while regional exploration is identifying additional

opportunities across a broader mineralized corridor.

Intercepts are indicated in metres (“m”) and grade in grams per tonne of gold (“g/t Au”).

New highlights include:

Gurupi

• Blanket: Broad intercepts extend mineralization approximately 250 m etres beyond the

2025 Mineral Resource Estimate (“MRE”), with results including 79.6 m at 1.78 g/t Au and

63.5 m at 1.28 g/t Au

• Mandiocal: Mineralization extended up to 125 m below the 2025 MRE pit shell, including

48.4 m at 1.32 g/t Au and 35.0 m at 1.37 g/t Au

• Grodiocal: Maiden drilling confirmed a new, near-surface gold discovery, highlighted by

23.0 m at 1.97 g/t Au, including 9.0 m at 4.24 g/t Au and 10.0 m at 3.42 g/t Au

• An updated MRE is expected to be complete before year-end, which will form the basis of

a Preliminary Economic Assessment (“PEA”) targeted to be completed by the end of 2026

TZ

• Drilling up to 150 m etres below the current pit design confirms continuity of

mineralization at depth

• Results include 78.1 m at 1.81 g/t Au, including 16.0 m at 4.34 g/t Au and 51.0 m at

1.31 g/t Au, including 7.80 m at 6.42 g/t Au

• Regional exploration has defined a 15 km by 3 km mineralized corridor hosting the

Tocantinzinho deposit and multiple satellite targets.

Page | - 2 -

Julie-Anaïs Debreil, Vice-President Geology & Resources, commented: “The results from our

2026 exploration programs continue to validate the significant potential we see across both Gurupi

and Tocantinzinho. At Gurupi, drilling has successfully extended mineralization at Blanket and

Mandiocal while confirming a new gold di scovery at Grodiocal, further demonstrating the district -

scale potential of the Project. At TZ, drilling below the current pit design continues to confirm the

continuity of m ineralization at depth, while regional exploration is identifying additional

opportunities across a broader mineralized corridor. As we advance an updated MRE and PEA at

Gurupi, these programs continue to strengthen our pipeline of organic growth opportunities in

Brazil.”

Gurupi Demonstrates District-Scale Growth Potential

Gurupi hosts approximately 43.5 million tonnes (“ Mt”) grading 1.31 g/t Au, which contain

1.8 million ounces (“Moz”) of Indicated Resources and 18.5 Mt grading 1.29 g/t Au containing 0.8

Moz of Inferred Resources as estimated in the 2025 MRE, distributed across the Blanket, Contact,

Chega Tudo and Mandiocal deposits (Figure 1). Since exploration drilling resumed in November

2025, the Corporation has completed 32,610 m in 186 holes across Blanket, Mandiocal and

Grodiocal. The program is testing extensions to existing mineralized systems and evaluating the

newly discovered Grodiocal target along the prospective Chega Tudo-Mandiocal corridor.

Page | - 3 -

Figure 1 - Gurupi Deposits

Page | - 4 -

Blanket Drilling Intersects Mineralization Beyond Current Resource Limits

At Blanket, drilling continues to test the potential for further extensions of mineralization beyond

the current MRE. Nineteen diamond drill holes for 6,323 m have been completed with assay results

received for seven holes and results pending for 12 holes (Table 1). Recent drilling has intersected

mineralization approximately 250 m beyond the current MRE, supporting the interpretation of

down-plunge continuity and indicating that the deposit remains open for follow-up drilling

(Figure 2a - Section through Blanket Deposit a, 2b and 2c). Structural analysis indicates that

multiple folding events have enhanced both the thickness and grade distribution of

mineralization, creating broad zones that remain only partially tested. Results from the ongoing

program support continued evaluation of the deposit along plunge and at depth.

Table 1: Significant Blanket Drilling Highlights

Hole ID From

(m)

To

(m)

Au

(g/t Au)

Length*

(m) Composite

GUD-26-019 202.0 234.0 0.67 32.0 32.0 m at 0.67 g/t Au

GUD-26-021 254.0 284.0 1.38 30.0 30.0 m at 1.38 g/t Au

Incl. 254.0 263.1 2.21 9.1 9.1 m at 2.21 g/t Au

And 265.0 269.0 2.64 4.0 4.0 m at 2.64 g/t Au

GUD-26-023 170.0 233.5 1.28 63.5 63.5 m at 1.28 g/t Au

Incl. 197.0 210.5 3.21 13.5 13.5 m at 3.21 g/t Au

GUD-26-026 240.0 272.5 2.28 32.5 32.5 m at 2.28 g/t Au

Incl. 240.0 247.0 6.78 7.0 7.0 m at 6.78 g/t Au

GUD-26-029 145.5 225.1 1.78 79.6 79.6 m at 1.78 g/t Au

Incl. 215.3 225.1 3.49 9.8 9.8 m at 3.49 g/t Au

And 180.7 185.7 3.17 5.0 5.0 m at 3.17 g/t Au

*True width estimated at 95% of the length

Page | - 5 -

Figure 2a - Section through Blanket Deposit

Figure 2b - Section through Blanket Deposit

Page | - 6 -

Figure 2c - Section through Blanket Deposit

Mandiocal Drilling Confirms Down-Plunge Continuity

At Mandiocal, gold mineralization is hosted within a dacitic volcanic unit. Twenty-four diamond

drill holes for 6,787 m have been completed, with assay results received for 13 holes and results

pending for 11 holes (Table 2). The objective was to evaluate the lateral and depth extensions of

the deposit. Drilling has intersected mineralization up to 125 m below the 2025 MRE pit shell while

demonstrating increased thickness of the mineralized system at depth (Figure ). These results

support the interpretation of southeast down-plunge continuity and indicate that mineralization

remains open beyond the limits of the current resource model.

Page | - 7 -

Table 2: Significant Mandiocal Drilling Highlights

Hole ID From

(m)

To

(m)

Au

(g/t Au)

Length*

(m) Composite

GUD-26-027 222.5 257.5 1.37 35.0 35.0 m at 1.37 g/t Au

Incl. 239.5 245.5 3.60 6.0 6.0 m at 3.60 g/t Au

GUD-26-028 276.5 324.9 1.32 48.4 48.4 m at 1.32 g/t Au

Incl. 293.0 302.8 2.83 9.8 9.8 m at 2.83 g/t Au

Incl. 308.8 313.8 3.55 5.0 5.0 m at 3.55 g/t Au

GUD-26-030 251.5 284.0 0.82 32.5 32.5 m at 0.82 g/t Au

Incl. 261.5 270.5 1.24 9.0 9.0 m at 1.24 g/t Au

GUD-26-031 216.5 251.0 0.77 34.5 34.5 m at 0.77 g/t Au

GUD-26-033 183.0 228.0 0.55 45.0 45.0 m at 0.55 g/t Au

GUD-26-034 170.2 197.0 0.72 26.8 26.8 m at 0.72 g/t Au

GUD-26-035 210.8 234.3 0.64 23.5 23.5 m at 0.64 g/t Au

*True width estimated at 85% of the length

Figure 3 - Section of Mandiocal deposit

Page | - 8 -

Maiden Drilling Confirms the Grodiocal Gold Discovery

Grodiocal is a newly identified discovery located northwest of Mandiocal along the prospective

Chega Tudo trend, where no historical drilling had pre viously been completed. The maiden

program comprised 17,667 m in 127 holes, including 22 diamond drill holes and 105 Reverse

Circulation holes, and identified multiple zones of near -surface gold mineralization within a

corridor extending approximately 5 km in strike length and up to 1 km in width (Table 3) .

Mineralization is hosted within deformed sedimentary rocks of the Chega Tudo Formation. The

results establish Grodiocal as a priority target for follow-up drilling to better define the geometry,

continuity, and extent of the mineralized zones (Figure 4).

Table 3: Significant Grodiocal Drilling Highlights

Hole ID From

(m)

To

(m)

Au

(g/t Au)

Length*

(m) Composite

GUD-26-007 19.6 33.0 1.02 13.4 13.4 m at 1.02 g/t Au

55.5 63.0 3.48 7.5 7.5 m at 3.48 g/t Au

GUD-26-010 139.5 147.3 1.59 7.8 7.8 m at 1.59 g/t Au

GUD-26-017 97.5 109.5 1.09 12.0 12.0 m at 1.09 g/t Au

GUD-26-022 92.0 95.0 4.31 3.0 3.0 m at 4.31 g/t Au

GUR-26-018 74.0 81.0 2.54 7.0 7.0 m at 2.54 g/t Au

GUR-26-024 40.0 47.0 1.62 7.0 7.0 m at 1.62 g/t Au

GUR-26-039 63.0 75.0 1.26 12.0 12.0 m at 1.26 g/t Au

Incl. 65.0 68.0 3.85 3.0 3.0 m at 3.85 g/t Au

GUR-26-057 61.0 70.0 1.40 9.0 9.0 m at 1.40 g/t Au

Incl. 61.0 64.0 3.54 3.0 3.0 m at 3.54 g/t Au

GUR-26-059 2.0 26.0 0.60 24.0 24.0 m at 0.60 g/t Au

GUR-26-066 23.0 33.0 3.42 10.0 10.0 m at 3.42 g/t Au

GUR-26-068 51.0 74.0 1.97 23.0 23.0 m at 1.97 g/t Au

Incl. 55.0 64.0 4.24 9.0 9.0 m at 4.24 g/t Au

GUR-26-072 84.0 100.0 1.51 16.0 16.0 m at 1.51 g/t Au

Incl. 91.0 95.0 3.76 4.0 4.0 m at 3.76 g/t Au

GUR-26-073 80.0 85.0 2.02 5.0 5.0 m at 2.02 g/t Au

GUR-26-076 17.0 29.0 0.87 12.0 12.0 m at 0.87 g/t Au

*True width estimated at 85% of the length