Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GLO.TO ·

Global Atomic Clarifies Niger’s Suspension of New Mining Permits

Mine Development & Operations Permits & Approvals

1

NEWS RELEASE

Global Atomic Clarifies Niger’s Suspension of New Mining Permits

Toronto, ON, January 25, 202 4: Global Atomic Corporation (“Global Atomic” or the “Company”) (TSX: GLO,

OTCQX: GLATF, FRANKFURT: G12) is issuing this clarification notice to ease concerns raised by some of its

shareholders about a recent announcement by the Mines Ministry in the Republic of Niger to suspend grants of

new permits.

The original notification by the Mines Ministry addresses concerns, that not all the gold mined by the large number

of small-scale artisanal miners in the country, is being legally declared to the government.

This announcement neither affects Global Atomic’s SOMIDA su bsidiary, which operates the Dasa Mine, nor any

other mines or development projects in the nation’s uranium mining sector. As previously reported the Dasa

Mine mining permit was granted at the end of 2020 in accordance with Niger’s Mining Code and is not under

review.

The following statement was subsequently issued in French by the country’s ruling party, the CNSP:

“The Niger government suspends the granting of new mining rights until further notice.

This decision follows the recent seizure at Addis Ababa airport of undeclared gold bullion worth tens of billions of

CFA francs that was to be exported to Dubai.

In recent years, Niger has embarked on an ambitious policy of granting mining licenses, with 116 exploration

licenses awarded between 2015 and 2020, representing 124 billion FCFA in potential investment.

This temporary suspension of new permits is intended to take stock of mining rights already granted, and to combat

illegal trafficking of the country's mineral resources.

This decision comes at a time when Niger is seeking to maximize the benefits of its mineral wealth for national

development.”

Renewal of Exploration Permits

In separate news, Global Atomic has received verbal confirmation of the renewal of exploration permits for the

Adrar Emoles 3 (“AE3”) and Adrar Emoles 4 areas. The Dasa Mine operates in the AE3 property. The exploration

permit renewals for the Tin Negoran areas are expected soon, pending the receipt of formal notice from the Mines

Ministry.

Acceleration of Warrants

The Company also announced the accelerated expiry provisions of the common share purchase warrants issued

in connection with the December 2023 Private Placement have been activated. The warrants are exercisable at

$3.00 per common share and now expire February 26, 2024, instead of December 22, 2024.

2

About Global Atomic

Global Atomic Corporation is a publicly listed company that provides a unique combination of high-grade uranium

mine development and cash -flowing zinc concentrate production. Go to www.globalatomiccorp.com for the

latest photos and videos from Management’s January 2024 site visit.

The Company’s Uranium Division includes four deposits with the flagship project being the large, high-grade Dasa

Project, discovered in 2010 by Global Atomic geologists through grassroots field exploration. With the issuance of

the Dasa Mining Permit and an Environmental Compliance Certificate by the Republic of Niger, the Dasa Project

is fully permitted for commercial production. The Phase 1 Feasibility Study for Dasa was filed in December 2021

and estimates yellowcake delivery to utilities to commence in 2026. Mine excavation began in Q1 2022.

Global Atomic’s Base Metals Division holds a 49% interest in the Befesa Silvermet Turkey, S.L. (BST) Joint Venture,

which operates a modern zinc production plant, located in Iskenderun, Türkiye. The plant recovers zinc from

Electric Arc Furnace Dust (EAFD) to produce a high -grade zinc oxide concentrate which is sold to zinc smelters

around the world. The Company's joint venture partner, Befesa Zinc S.A.U. (Befesa) holds a 51% interest in and is

the operator of the BST Joint Venture. Befesa is a market leader in EAFD recycling, with approximately 50% of the

European EAFD market and facilities located throughout Europe, Asia and the United States of America.

Key contacts:

Stephen G. Roman

Chairman, President and CEO

Tel: +1 (416) 368-3949

Email: [email protected]

Bob Tait

VP Investor Relations

Tel: +1 (416) 558-3858

Email: [email protected]

The information in this release may contain forward-looking information under applicable securities laws. Forward-looking information includes, but is not limited to: statements with respect to completion of

any proposed financings; Global Atomics’ develo pment potential and timetable of its operations, development and exploration assets; Global Atomics’ ability to raise additio nal funds on satisfactory terms to

the Company; the future price of uranium; the estimation of mineral reserves and resources; the completion and timing of the MRE; conclusions of economic evaluation; the realization of mineral reserve

estimates; the timing and amount of estimated future production, development and exploration; impacts of third-parties and Government policies on the Company’s operations; cost of future activities; capital

and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; governme nt regulation of mining operations; and environmental and permitting

risks. Generally, forward-looking statements can be identified by the use of forward- looking terminology such as “plans”, “is expected”, “estimates”, variations of such words and phrases or statements that

certain actions, events or results “could”, “would”, “might”, “will be taken”, “will begin”, “will include”, “are expected”, “occur” or “be achieved”. All information contained in this news release, other than

statements of current or historical fact, is forward-looking information. Statements of forward-looking information are subject to known and unknown risks, uncertainties and other factors that may cause the

actual results, level of activity, performance or achievements of Global Atomic to be materially different from those express ed or implied by such forward-looking statements, including but not limited to those

risks described in the annual information form of Global Atomic and in its public documents filed on SEDAR from time to time.

Forward-looking statements are based on the opinions and estimates of management at the date such statements are made. Although management of Global Atomic has attempted to identify important

factors that could cause actual results to be materially different from those forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can

be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance upon forward-looking statements. Global Atomic does not undertake to update any forward- looking statements, except in accordance with applica ble securities law. Readers should also review the

risks and uncertainties sections of Global Atomics’ annual and interim MD&As.

The Toronto Stock Exchange has not reviewed and does not accept responsibility for the adequacy and accuracy of this news release.