Golden Rapture Mining Commences Exploraation at its High-Grade Phillips Township Property
Golden Rapture Mining Commences ExploraƟon at its High-Grade
Phillips Township Property
Edmonton, Alberta (April 16, 2025) – Golden Rapture Mining CorporaƟon (CSE-GLDR) is pleased
to announce that a high-resoluƟon UAV airborne magneƟcs survey has commenced at its high-
grade gold Phillips Township property, Ontario.
Golden Rapture’s Phillips Township Property is located in a Tier 1 mining jurisdicƟon. It is
comprised of 225 conƟguous claim cells totaling over 10,000 acres with high-grade gold,
phenomenal infrastructure, easy access, and low cost of exploraƟon with the company having
access to its own in-house portable diamond drill.
The (UAV) airborne magneƟcs survey is being conducted by Rosor ExploraƟon of Burlington,
Ontario. The survey will be flown with a MagArrow magnetometer by Geometrics suspended
from a Matrice 300 RTK drone along 50-meter spaced lines with a total of 493 line-kilometers
covering an area of approximately 21 square kilometers.
This high-resoluƟon (UAV) airborne magneƟcs survey will cover some of the most prospecƟve
areas of our Phillips Township, where 18 mine shaŌs exist. This survey is expected to yield
criƟcal data that will enhance our targeƟng of addiƟonal gold mineralizaƟon on the property.
The survey is expected to take three to four weeks, depending on the weather and the Ɵme it
takes for the geophysicist to process and image the survey data and provide us with a report.
We are eager to review the survey results and explore the targets it idenƟfies for further
evaluaƟon and follow-up.
It is the first Ɵme that all these gold systems are part of a single property. They include the high-
grade Combined Mine, MascoƩe Mine, Trojan Mine, Boulder Mine, Terrell Occurrence, OGS
Occurrence, Kuluk Occurrence & the Young's Bay Occurrence, etc.
2024 Drilling Program
Our 2024 Combined Mine area drilling program, completed in October, included 23 shallow
holes (average depth 100 Ō) and saw results as high as 285.00 g/t Au. Highlights included
114.96 g/t Au across 2.55 meters in Hole 12, 111.16 g/t Au across 1.50 meters in Hole 17 and
11.74 g/t Au across 4.40 meters in Hole 11.
2024 Highlights of Drill Results from our Combined Mine Area:
Hole No. Dip From (m) To (m) Interval (m) Au g/t Results
GRM24-09 66° 24.00 25.00 1.00 m 1.35 g/t
GRM24-09 66° 25.50 26.00 0.50 m 8.62 g/t
GRM24-10 66° 13.50 14.50 1.00 m 8.90 g/t
Including 66° 14.00 14.50 0.50 m 14.20 g/t
GRM24-11 66° 15.50 16.00 0.50 m 5.64 g/t
GRM24-11 66° 17.00 19.00 2.00 m 4.79 g/t
Including 66° 18.00 19.00 1.00 m 7.61 g/t
GRM24-11 66° 19.00 24.00 5.00 m 1.07 g/t
GRM24-12 66° 22.75 25.30 2.55 m 114.96 g/t
Including 66° 22.75 23.25 0.50 m 285.00 g/t
GRM24-12A 45° 5.75 6.30 0.55 m 55.04 g/t
GRM24-13 45° 5.50 6.30 0.80 m 17.40 g/t
GRM24-14 45° 6.50 7.50 1.00 m 3.73 g/t
GRM24-16 45° 6.00 6.50 0.50 m 1.10 g/t
GRM24-17 45° 6.50 8.00 1.50 m 111.16 g/t
Including 45° 6.50 7.00 0.50 m 252.00 g/t
GRM24-18 45° 12.00 13.00 1.00 m 8.09 g/t
Including 45° 12.00 12.50 0.50 m 13.90 g/t
GRM24-19 55° 4.50 11.00 6.50 m 2.05 g/t
including 55° 5.50 6.00 0.50 m 5.65 g/t
including 55° 8.50 9.00 0.50 m 5.77 g/t
including 55° 10.50 11.00 0.50 m 3.68 g/t
GRM24-21 57° 18.50 19.50 1.00 m 23.20 g/t
GRM24-21 57° 21.50 22.50 1.00 m 2.93 g/t
GRM24-22 70° 18.10 22.50 4.40 m 11.74 g/t
Including 70° 19.20 19.70 0.50 m 59.99 g/t
Including 70° 19.70 20.20 0.50 m 37.99 g/t
Including 70° 22.00 22.50 0.50 m 5.27 g/t
GRM24-23 45° 14.00 15.00 1.00 m 1.25 g/t
Richard Rivet, President and CEO, commented:
“These new 23 shallow high-grade drill holes and the past 33 historical drill holes, combined
with the large piles of gold-bearing quartz material on the surface, highlight the potenƟal that
the Combined Mine area may be amenable to open-pit mining. Also of significance is the fact
that there is also over 3 kms of strike length with the Combined, Terrell, MascoƩe, and Trojan
Mine all lining up on the same fault structure, reinforcing addiƟonal potenƟal with only the
Combined Mine area having been drilled so far.”
Qualified Person
The technical disclosure in this news release has been reviewed and approved by John
Archibald, P .Geo., Qualified Person as defined by NaƟonal Instrument 43-101 of the Canadian
SecuriƟes Administrators.
About Golden Rapture Mining
Golden Rapture Mining is a newly listed, well-funded exploraƟon company engaged in the
acquisiƟon, exploraƟon and development of high-potenƟal assets. The company’s Phillips
Township Property is located in the Rainy River District of NW Ontario and is comprised of
10,000-acres of highly prospecƟve past-producing high-grade gold systems.
Golden Rapture has now been listed for 1 year with 37,469,390 shares presently issued.
On behalf of the Board
Richard Rivet,
President & CEO
Email: [email protected]
Phone: 780-729-5395
For more info please look at our website at hƩps://goldenrapturemining.com/
Forward-looking statements include predicƟons, projecƟons, and forecasts and are oŌen, but not always, idenƟfied by the use
of words such as “seek”, “anƟcipate”, “believe”, “plan”, “esƟmate”, “forecast”, “expect”, “potenƟal”, “project”, “target”,
“schedule”, “budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or be
achieved and other similar expressions and includes the negaƟves thereof. All statements other than statements of historical
fact included in this release, including, without limitaƟon, statements regarding the Company’s planned exploraƟon programs
and drill programs and potenƟal significance of results are forward-looking statements that involve various risks and
uncertainƟes. There can be no assurance that such statements will prove to be accurate and actual results and future events
could differ materially from those anƟcipated in such statements. Forward-looking statements are based on a number of
material factors and assumpƟons. Important factors that could cause actual results to differ materially from Company’s
expectaƟons include actual exploraƟon results, changes in project parameters as plans conƟnue to be refined, results of future
resource esƟmates, future metal prices, availability of capital, and financing on acceptable terms, general economic, market or
business condiƟons, uninsured risks, regulatory changes, defects in Ɵtle, availability of personnel, materials, and equipment on a
Ɵmely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanƟcipated environmental
impacts on operaƟons and costs to remedy same, and other exploraƟon or other risks detailed herein and from Ɵme to Ɵme in
the filings made by the Company with securiƟes regulators. Although the Company has aƩempted to idenƟfy important factors
that could cause actual acƟons, events, or results to differ from those described in forward-looking statements, there may be
other factors that cause such acƟons, events, or results to differ materially from those anƟcipated. There can be no assurance
that forward-looking statements will prove to be accurate, and accordingly readers are cauƟoned not to place undue reliance on
forward-looking statements.