Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GLDR.CN ·

Golden Rapture Mining Announces Bonanza-Grade GOLD Results

Drill Results

GOLDEN RAPTURE MINING ANNOUNCES BONANZA-GRADE GOLD RESULTS

Edmonton, Alberta, July 02, 2025—Golden Rapture Mining CorporaƟon [CSE- GLDR] is pleased

to announce high-grade gold results from its recent surface sampling program at its 10,000-

acre Phillips Township Property, Rainy River District, NW Ontario.

This sampling program was designed to test certain surface areas where strong anomalies were

recently idenƟfied in our low-alƟtude, high-resoluƟon drone magneƟc survey. The survey

results idenƟfied new high-priority targets, confirming that the survey area is dominated by

strong linear anomalies throughout the project area, with the strongest occurring in the

northeast corner (Young’s Bay area), where intense deformaƟon and folding are present.

Richard Rivet said:

“To our surprise, most of the samples recently taken in the northeast corner of our property,

called the Young’s Bay area, have also revealed our best high-grade gold results to date.”

Highlights of the sampling program included:

GRAB SAMPLE NUMBER AREA OF THE PROPERTY ASSAY RESULT

291145 YOUNG’S BAY 200.80 g/t Au or 7.08 oz/t gold

291152 YOUNG’S BAY 144.02 g/t Au or 5.00 oz/t gold

291155 YOUNG’S BAY 134.19 g/t Au or 4.73 oz/t gold

291160 YOUNG’S BAY 107.17 g/t Au or 3.78 oz/t gold

291108 COMBINED MINE 107.02 g/t Au or 3.77 oz/t gold

291159 YOUNG’S BAY 100.50 g/t Au or 3.54 oz/t gold

291166 YOUNG’S BAY 83.88 g/t Au or 2.95 oz/t gold

291105 COMBINED MINE 78.25 g/t Au or 2.76 oz/t gold

291157 YOUNG’S BAY 71.28 g/t Au or 2.51 oz/t gold

291161 YOUNG’S BAY 64.26 g/t Au or 2.26 oz/t gold

291151 YOUNG’S BAY 50.22 g/t Au or 1.77 oz/t gold

291148 YOUNG’S BAY 43.60 g/t Au or 1.53 oz/t gold

291147 YOUNG’S BAY 32.36 g/t Au or 1.14 oz/t gold

291112 COMBINED MINE 30.09 g/t Au or 1.06 oz/t gold

Full results can be seen later in this news release

Source of all Survey Data Phillips Project Survey Processing Report: Authored by:

Skyler Mallozzi, M.Sc, P .Geo, Senior Geophysicist, Rosor ExploraƟon, April 24, 2025

Full sample results and description

Sample

No.

Sample Description GPS Location

Easting

Representative grab sample area Assay

g/ton Au

291101

Sugary, smoky to blue qtz. carb.

vng. w. diss. Py(1-2%) plus

linear wisps chlorite

15U0426891 Combined

MP #1

2.000

291102

Sheard. rusty siliceous (QFP?)

altered Fe carb.-rich intrusive-

w.diss. Py (3-5%)

15U0426891 Combined

MP #1

1.414

291103

Sugary Smoky Qtz vng.w. bands

chl. Schist; diss. py 1-2% (ser.

sch., rusty on contact)

15U0426891 Combined

MP #1

0.054

291104

Brecc. Crystalline qtz-carb vng

w. blebs/clots chlorite; 2-3 %

diss. Py and Fe-Carb.(ankeritic)

15U0426892 Combined

MP #1

0.056

291105

Qtz.carb vng w. diss. py;

xstalline/blk. Fe carb/lots biot.

Clots and linear banding + diss.

Py 2-3%

15U0426892 Combined

MP #1

78.250

291106

Wht. qtz. vn. with bands /clots

blk. chl. schist on contact with

mvf- poorly mineralized (<1%

Py)

15U0426892

Combined

MP #1

0.047

291107

Sugary white qtz. vng; a lot.dk.

chl. blebs/clots w. diss. Py 2-3%

15U0426898

Combined

MP #2; left side(N)

0.616

291108

Qtz, carb. vng; sugary/xstalline +

biot./mica clots/ linear bands w.

2-3 % diss. Py

15U0426899

Combined

MP #2: left side

107.027

291109

Brecc. Qtz carb vng w. shrd. chl.

contacts; diss. Py 1-3% on

contacts; rusty

15U0426900 Combined

MP #2; left side

0.007

291110

Rusty qtz, carb vng. in sil. volcs.

brecc. lenses/clots/ contacts w.

chlorite (maf.Volcs.); 3-5% py

15U0426904

Combined

MP #2: Right side(S)

3.574

291111

Massive grey qtz. carb vng. w.

diss. Py on slips/along shrd.

contacts

15U0426904 Combined

MP #2: right side

2.126

291112

Massive grey-wht. qtz. vn. with

blebs/wisps/ clots black chlorite-

poorly min.(<1%)

15U0426904 Combined

MP #3: right side

30.009

291113

Brecc. Qtz. carb vng. ; white,

massive with bands blk. chlorite

+diss. Py (3-5%)

15U0426904 Combined

MP #3; Right side

0.039

291114

Rusty, qtz. carb. Vng. with shrd.,

mafic contacts of chlorite schist

+ diss. Py in clots/blebs (3-5%)

15U0426937 Combined

MP #4: right side

3.544

291115

Xstalline qtz. vn.(massive wht..

to smoky ; dk, blk. chlorite clots

along contacts (py <1%)

15U0426938 Combined

MP #4: right side

0.015

291116

White. cryst, qtz. vn. with

laminar bands blk. chlorite-gen.

poorly min. (<1% Py)

15U0426939 Combined

Muck Pile #4:right side

0.087

291117

White qtz. veining, massive with

bands/clots chlorite+fine Linear

blk, chlorite lenses +bands Py (2-

5%)

15U0426940 Combined

Muck Pile #4: right side

1.482

291118

Crystalline qtz. carb.vng. w. clots

blk. chl. sch.+ diss. Py (<1%)

15U0426940 Combined

Muck Pile #4

0.686

291119

Sil. qtz, dior.? (intrusive) w. diss.

cubic py + shrd. chl. schist along

contacts(1-2 % py)

15U0426941 Muck Pile #4

Combined

0.328

291120

Wht. qtz. carb vng. w. chl.

slips/clots.; poorly min.(<`1%

Py)

15U0426893 Combined

Muck Pile #1

38.901

291121

Wht.rusty qtz. vn. w. fine

laminar chlor. clots+odd diss. Py

(1-2%)

15U0426828 T-4 Trench (to south of shaft)

1.601

291131

Rusty shrd. mvf/chl. schist (blk.

Chlorite); odd diss. Py (1-2%)w.

Fe-Carb. rich contacts

15U0426892 Combined

Muck Pile #2

13.881

291132

Brecc. rusty shrd. mvf + milky

qtz. vng. + diss. Py (2%)

15U0426215 Trojan shaft #1

Muck Pile #1

0.133

291133

White. to milky qtz. vng.,

brecc./contact w. mvf + diss. Py

(2-5%)

15U0426215 Trojan shaft #1

Muck Pile #1

0.058

291134

Rusty sheared mvf with black

chlorite + diss. Py (2-5%)

15U0426215 Trojan shaft #1

Muck Pile #1

0.136

291135

Wht. Qtz. vn. w. clots/wisps blk.

chlorite + diss. f.g. Py(2-3%)

15U0426215 Trojan shaft #1

Muck Pile #1

0.047

291136

White. rusty Qtz. vng.

+clots/bands blk. chlorite+ diss.

Py in bands (2-3% Py)

15U0426215 Trojan Shaft #2

Muck Pile #2

0.061

291137

White-grey smoky qtz. vn.,

massive, crystalline, with

clots/blebs blk. chlorite+bands

cubic Py (3-5%)

15U0426215 Trojan shaft #2

Muck Pile #2

0.017

291138

Wht. milky qtz. carb.vns. + Fe

ank. + blk. chl. schist + diss. Py

(2-3%)

15U0426215 Trojan shaft #2

Muck Pile #2

0.090

291139

Brecc, wht.-grey smoky qtz, vn.

w. clots/blebs/wisps blk.

chlorite/Py ( diss. 1-3%)

15U0426215 Trojan shaft #2

Muck Pile #2

0.090

291140

Wht.rusty qtz. vng. with blk.

chlorite wisps/clots ; Fe-carb rich

with diss. Py 2-3%

15U0426215 Trojan shaft #2

Muck Pile #2

0.099

291141

Massive wht. qtz. vn. +

frags/blebs rusty mvf (biotite

schist): diss. py 2-3%

15U0426237 Trojan pit #4

Muck Pile #4

0.423

291142

Qtz. vn. w. fine chlorite schist

along contacts-diss. Py 2-3%;

rusty Fe carb.

15U0426237 Trojan pit #4

Muck Pile #4

Qtz. Pit

5.542

291143

Wht. Qtz. vn. w. blk. chl.

schist(clots/bands) – mineralized

Pyrite banding along contacts

(Bld. on ridge)

15U0426237 Trojan pit #4

Muck Pile #4

0.041

291144

Sil. volcanics along contacgts

with qtz vng./alt./chloritic +

bands Py (5-10%)

15U0426237 Trojan Pity #4

Muck Pile #4

0.457

291145

Small smoky qtz. vn./sugary in

rusty bands blk. chlorite; poorly

min.

15U0428199 Young’s Bay

Muck Pile #1

200.800

291146

Blk. chlorite in sugary white qtz.

veining w. odd diss. py (>1%)

15U0428199 Young’s Bay

Muck Pile #1

at end Tr.#1

12.296

291147

Rusty qtz. carb. vng. (brecc.) w.

lots rusty chlor. Clots/bands; <

1% diss. py

15U0428199 Youngs Bay

Muck Pile #1

32.363

291148

Sugary Qtz. carb vng. + (cubic

Py 2-3%) + chl. clots/slips

ankeritic

15U0428200 Youngs Bay

Muck Pile #1

43.606

291149

Shrd. blk. biot. Schist; very rusty

w. small silvery, sil. banding (2-

3% Py)

15U0428200 Youngs Bay

Muck Pile #1 -S. end Tr.#1

10.264

291150

Rusty smoky qtz vng. w.

clots/slips blk. chl.+ Py rich

silicified (2-5% Py)

15U0428199 Young’s Bay

Muck Pile #1 – South end Tr.#1

4.918

291151

White, rusty, qtz. vn.(crystalline)

w. blk. chlorite wisps/slips +

diss. Py(1-3%)

15U0428200 Young’s Bay

Muck Pile #1 – South end Tr.#1

50.229

291152

Qtz. carb. vein w. slips/blebs blk.

biot. Schist;(1% Py)

15U0428200 Young’s Bay

SW. corner Tr.#1

144.029

291153

Brecc. wht. Qtz. vng w. clots blk.

Chl.(m.v.f.?) poorly min.

brecc/lineated bands

15U0428200 Young’s Bay

SW corner Tr.#1

9.182

291154

Wt. qtz. vn. w. clots/slips blk.

chlorite, rusty (1-2% Py)

15U0428200 Young’s Bay

SW corner Tr.#1

11.601

291155

Orange, rusty qtz. vng. nd chl

schist (mvf), sericitic w. 2-3%

diss Py in contact with wall rx.

15U0428201 Young’s Bay

SW corner Tr.#1

134.191

291156

Smoky grey qtz, vng. brecc. with

chl. clots/frags(1-2% diss py);

shrd sil. volcs.?

15U0428209 Young’s Bay

Pit#1 Near Shoreline

0.159

291157

Rusty, orange, Qtz. vn. w. clots

blk. chlorite, poorly mineralized

15U0428209 Young’s Bay

Pit #1 near shoreline

71.288

291158

Sil.shrd. mafic volcs w. qtz.

vng.+ clots/slips blk. chlorite w.

diss. Py (3-5%)

15U0428209 Young’s Bay

Pit #1 near shoreline

13.594

291159

Brecc. wht.qtz. vn. with

clots/blebnns blk. chlorite, poorly

mineralized, crystalline qtz.

15U0428209 Young’s Bay

Pit #1 near shoreline

100.585

291160

Smoky Qtz. vng. on contact with

mvf/chlorite shrd. w. odd diss.

py; rusty

15U0428209 Young’s Bay

Pit#1 near shoreline

107.171

291161

Brecc. qtz. vng. on

contact w. blk. chl.wisps/clots +

poorly min.

15U0428209 Youngs’ Bay

Pit#1 near shoreline

64.262

291162

Brecc. white qtz, veining on

contact w. m.v.flows; smoky

wht. qtz. w. bands chl.schist +

odd diss. Py

15U0428210 Young’s Bay Pit#1 near shoreline

25.700

291163

Milky rusty qtz vn. w.

frags./clots blk. chl. (1-2% Py)

15U0428210 Young’s Bay

Pit #1 near shoreline

9.130

291164 Smoky rusty wht. qtz. vn. w.

diss. Py (3-5%) in m.v.

contact/brecc. chl. schist

15U0428210 Young’s Bay

Pit #1 near shoreline

11.313

291165

Rusty contact w. m.v.f./qtz. vng.;

blk.chl. w. diss. Py 1-2% in

mafic volcs. (blk. chloritic)

15U0428209 Young’s Bay

Pit #1 near shoreline

1.724

291166

Rusty powdery qtz, vn./smoky

grey w. blk. chloritic bands/clots

+odd diss. Py (<1%)

15U0428209 Young’s Bay

Pit #1 near shoreline

83.885

291167

Rusty Qtz. vn. w. diss. py along

contact/in slips (2-3% Py) in blk.

chlorite(mvf?)

15U0428235 Young’s Bay

Pit #3 SE of dock

0.534

291168

Brecc. smoky, rusty qtz. vn.. on

edge chl. schist/alt. m.v.f.;brecc

with odd diss. Py (1-2%)

15U0428235 Young’s Bay

Pit #3 SE of dock

0.414

291169

1 ½” qtz. vn. in shrd. chl. schist

on contact ; diss. py 1-3%; Fe

carb. in m.v.f.

15U0428235 Young’s Bay

Pit #3 SE of dock

0.698

291170

Brecc. Wht. bull qtz. vn. w. blk.

chl. frags/wisps.+ diss. Py in

smoky rusty qtz. (<1% Py)

15U0428235 Young’s Bay

Pit #3 SE of dock

0.005

291171

Broken/fract. wht. qtz. vn. +blk.

Rusty biot. Schist;

Gen.poorly mineralized

15U0428236 Young’s Bay

Pit #2 SE of dock

0.019

291172

Brecc. qtz. vng. w. blk. Chlorite

wisps/frags + odd diss. Py

15U0428236 Young’s Bay

Pit#2 SE of Dock

0.777

291173

Hard, wht. qtz. vng. w. off

clot/wisp/lineation of blk.

chlorite on contact with sil. mvf

+ diss. py bands (5-20%)

15U0426237 Trojan Occ.

Pit #4- vert. qtz.vn.@ 80 E

0.860

Richard Rivet said:

“We are also waiƟng for sample results from our newly acquired highly prospecƟve Bully Boy

Mine patented mineral claims located directly adjacent to our Phillips Township property, NW,

Ontario. Results to be announced when received.”

History of the Bully Boy Mine

The historical records of the Bully Boy Mine are limited; however, archival Ontario Ministry of

Mines files indicate that gold was first discovered in 1885 and that it was mined intermittently

from 1898 to 1906.

In 1900, the mining workforce consisted of nine individuals, including six miners.

In 1904, the Arizona Camp Bay Gold Mining Company assumed ownership of the property.

Equipment formerly used by the neighboring Boulder Mining Company—including a hoist,

compressors, boilers, and other mining machinery—was transferred to the Bully Boy site, and

two shafts were developed on the property, reaching depths of 56 and 165 feet.

In 1905, New accommodations were constructed to house approximately 30 workers. A ten-

stamp mill, located two miles from the mine, processed up to 18 tons of ore per day.

By 1906, the main shaft was deepened by 60 feet, and lateral drifting was initiated at the 200-

foot level, and a new compressor plant was also installed. By the end of the year, the shaft had

reached 216 feet, with two 100-foot drifts extending north and south.

The ore extracted from the mine was estimated to contain gold values between $12 to $2,000

per ton, indicating very high gold grades, considering that gold was priced at $20/ounce in

1906. The last reported info about the property was that a new mill was added to supplement

the existing ten-stamp mill, but no additional mining activity or production numbers can be

found for the last 119 years.

Qualified Person

The technical disclosure in this news release has been reviewed and approved by John

Archibald, P .Geo., Qualified Person as defined by NaƟonal Instrument 43-101 of the Canadian

SecuriƟes Administrators.

AnalyƟcal Laboratory and QA/QC Procedures

All sampling completed by Golden Rapture Mining CorporaƟon within its exploraƟon programs

is subject to a Company standard of internal quality control and quality assurance (QA/QC)

programs, which include the inserƟon of cerƟfied reference materials, blank materials and a

level of duplicate analysis. Surface grab samples from the 2025 summer program were all sent

to AGAT Laboratories. AGAT Laboratories conform to the requirements of ISO/IEC Standard

17025 guidelines and meets assay requirements outlined for NI 43-101.

About Golden Rapture Mining

Golden Rapture Mining is an exploraƟon company engaged in the acquisiƟon, exploraƟon and

development of high-potenƟal assets. Golden Rapture has now been listed on the CSE for over 1

year now and 37,469,390 shares are presently issued.

On behalf of the Board

Richard Rivet,

President & Chief ExecuƟve Officer

Email: [email protected]

Phone: 780-729-5395

For more info, please look at our website at hƩps://goldenrapturemining.com

Forward-looking statements include predicƟons, projecƟons, and forecasts and are oŌen, but not always, idenƟfied by the use

of words such as “seek”, “anƟcipate”, “believe”, “plan”, “esƟmate”, “forecast”, “expect”, “potenƟal”, “project”, “target”,

“schedule”, “budget” and “intend” and statements that an event or result “may”, “will”, “should”, “could” or “might” occur or be

achieved and other similar expressions and includes the negaƟves thereof. All statements other than statements of historical

fact included in this release, including, without limitaƟon, statements regarding the Company’s planned exploraƟon programs

and drill programs and potenƟal significance of results are forward-looking statements that involve various risks and

uncertainƟes. There can be no assurance that such statements will prove to be accurate and actual results and future events

could differ materially from those anƟcipated in such statements. Forward-looking statements are based on a number of

material factors and assumpƟons. Important factors that could cause actual results to differ materially from Company’s

expectaƟons include actual exploraƟon results, changes in project parameters as plans conƟnue to be refined, results of future

resource esƟmates, future metal prices, availability of capital, and financing on acceptable terms, general economic, market or

business condiƟons, uninsured risks, regulatory changes, defects in Ɵtle, availability of personnel, materials, and equipment on a

Ɵmely basis, accidents or equipment breakdowns, delays in receiving government approvals, unanƟcipated environmental

impacts on operaƟons and costs to remedy same, and other exploraƟon or other risks detailed herein and from Ɵme to Ɵme in

the filings made by the Company with securiƟes regulators. Although the Company has aƩempted to idenƟfy important factors

that could cause actual acƟons, events, or results to differ from those described in forward-looking statements, there may be

other factors that cause such acƟons, events, or results to differ materially from those anƟcipated. There can be no assurance

that forward-looking statements will prove to be accurate, and accordingly readers are cauƟoned not to place undue reliance on

forward-looking statements.