Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GLD.V ·

GoldON Mobilizes Diamond Drill and Outlines Exploration Plan for West Madsen Gold Project in the Heart of the Red Lake Camp Property adjoins Canada's next gold mine - the Pure Gold Red Lake Mine project where the first gold pour is scheduled before year's end

Production Results Mine Development & Operations Exploration Programs

GoldON Resources Ltd. | 108 - 800 Kelly Road, Suite 416, Victoria, BC V9B 6J9 | Tel.: (250) 474-7999

FOR IMMEDIATE RELEASE

GoldON Mobilizes Diamond Drill and Outlines

Exploration Plan for West Madsen Gold Project in the

Heart of the Red Lake Camp

Property adjoins Canada's next gold mine - the Pure Gold Red Lake Mine project

where the first gold pour is scheduled before year's end

VICTORIA, BC November 16, 2020 – GoldON Resources Ltd. (TSX-V: GLD) (“GoldON” or

the “Company”) is pleased to report that a diamond drill and crew have begun mobilization at the

West Madsen Gold Project to initiate Phase II drilling.

Figure 1: Phase II Drill Plan for West Madsen Project

GoldON Resources Ltd. | 108 - 800 Kelly Road, Suite 416, Victoria, BC V9B 6J9 | Tel.: (250) 474-7999

The West Madsen Project covers over 4,700 hectares and is comprised of the West Madsen (Block

A and B) claims, where GoldON has the right to earn a 100% interest through an option agreement

with Great Bear Resources (see news release of May 28, 2019 ); and the Flat Lake and Madsen-

Medicine Stone claim groups that adjoin Block A, where GoldON c an acquire a 100% interest

through an option agreement with Bounty Gold (see news release of July 29, 2020, and the Red

Lake regional map Figure 2).

The focus of the Phase II drilling program will be on the expan ded West Madsen - Block A (see

Figure 1 above) and the area of the bl ack ellipse that is contiguous wi th the Pure Gold Red Lake

Mine property where the first gold pour is scheduled for late 2 020 (Pure Gold’s news release of

October 27, 2020). Pure Gold’s reserves and resources include the Madsen deposit (FS status) and

the Fork, Russet South, and Wedge deposits (PEA status) that are hosted in a seven-kilometre-long

gold system that follows the major crustal break or contact between the Balmer and Confederation

assemblages. This same Balmer-Confederation contact has been exposed in outcrop 1.6 kilometres

(km) west of the Pure Gold property boundary and is interpreted to continue for ~8 km across

GoldON’s property.

The Phase II program is budgeted for up to 7,000 metres of diam ond drilling to aggressively test

the strike-extension of both the known gold mineralization to the east and to follow-up on the gold

mineralization discovered during GoldON’s Phase I drilling that returned 14.4 g/t gold over 0.5

metres (see news release of July 22, 2020 ). The black ellipse in Figure 1 depicts the area of the

interpreted east-west trending Ba lmer-Confederation contact and the systematically planned drill

holes that will test the extension of the stratigraphy within the structurally controlled corridor.

“GoldON has a unique opportunity to test for gold mineralizatio n along the prospective Balmer-

Confederation contact of the Red Lake Greenstone Belt,” said Mi ke Romanik, President of

GoldON. “Exploration drilling is all about discovery and with the addition of the recently acquired

claims we now control an eight kilometre interpreted extension of known gold-bearing stratigraphy

in the heart of the Red Lake Camp.”

Figure 3: Looking NE from West Madsen – Block A toward the Pure Gold Red Lake Mine Project

GoldON Resources Ltd. | 108 - 800 Kelly Road, Suite 416, Victoria, BC V9B 6J9 | Tel.: (250) 474-7999

Ian Russell, P. Geo., an independent qualified person as define d in National Instrument 43-101,

has reviewed and approved the technical contents of this news release on behalf of the Company.

About GoldON Resources Ltd.

GoldON is an exploration compan y focused on discovery-stage pro perties located in the prolific

gold mining belts of northwestern Ontario, Canada. Our current project portfolio includes four

properties in the Red Lake Mining Division (West Madsen, Pipestone Bay, McDonough and Bruce

Lake) and a fifth property in the Patricia Mining Division (Slate Falls).

For additional information: please visit our website at goldonresources.com, you can download

our latest investor presentation by clicking here and you can follow us on Twitter at

https://twitter.com/GoldONResources.

ON BEHALF OF THE BOARD

Signed “Michael Romanik”

Michael Romanik, President

Direct line: (204) 724-0613

Email: [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.