Greenheart Gold Confirms Gold Mineralization at Majorodam and Provides an Exploration and Project Update Diamond drilling at Majorodam, Suriname confirms the presence of a mineralized zone at least 800 m long at Heuvel Main in addition to a second zone at Heuvel East.

Exploration Programs

Greenheart Gold Confirms Gold Mineralization

at Majorodam and Provides an Exploration and

Project Update

Diamond drilling at Majorodam, Suriname confirms the presence of a mineralized zone at

least 800 m long at Heuvel Main in addition to a second zone at Heuvel East.

Greenheart Gold has entered into an option to acquire a 100% interest in the Gold Hill

project in Guyana, and drops options on its Tamakay and Abuya projects.

A 3,000 m trenching program has commenced on the Tosso Creek project in Suriname.

Longueuil, Québec--(Newsfile Corp. - November 10, 2025) - Greenheart Gold Inc. (TSXV: GHRT)

(OTCQX: GHRTF) (the "Company" or "Greenheart Gold") is pleased to provide an update on the

inaugural diamond drill program at its Majorodam project in Suriname, an update on exploration at its

Tosso Creek project in Suriname, and updates on its exploration portfolio in Guyana. At Majorodam,

which lies only 8 kilometers (km) south of Zijin's Saramacca mine, a satellite mine to Zijin's active

Rosebel gold mine and mill, Greenheart Gold recently completed an 11-hole diamond drill program

which totalled 2,335.6 meters (m). The program was designed to follow up and provide important

additional geological and structural information on the four encouraging intercepts from Greenheart

Gold's initial reverse circulation (RC) drilling completed in Q1 2025 and follow up on previously

announced trench results. Two or three holes were drilled around each of these targets and results

confirmed the presence of a North-South trending gold mineralized system at Heuvel that extends for at

least 800 m as well as a second mineralized zone approximately 500 m east of the Heuvel Main zone

called Heuvel East.

Highlight results from the program can be seen in Figure 1 and Table 1, along with the previously

released results from the RC hole and trench results. Hole MAJD25-011 was drilled approximately at the

mid-point of the Heuvel Main Zone and intersected approximately 50 m below the previously reported

trench MAJT25-029 that had intersected 18.0 m @ 6.39 grams per tonne of gold (g/t Au). MAJD25-011

intersected 11.5 m grading 1.34 g/t Au, including 5.0 m grading 2.77 g/t Au.

Hole MAJD25-002 was drilled at the southern end of Heuvel Main at an oblique angle to hole MAJR25-

010 and intersected 12.3 m grading 0.82 g/t Au, including 5.5 m grading 1.58 g/t Au. Hole MAJD25-005

was drilled at the north end of Heuvel Main, twinning hole MAJR25-003, and intersected 5.0 m grading

1.77 g/t Au.

Hole MAJD25-006, drilled as a twin hole to the previously reported RC hole MAJR25-015 intersected

13.0 m grading 1.29 g/t Au, including 5.5 m grading 2.3 g/t Au. This area, Heuvel East, lies 900 m east

of the main zone and is associated with a gold in soil anomaly that extends approximately 500 m in

length.

While gold mineralization in drill core was confirmed by at least one hole in each of the four target areas,

the grade and tenor of some of the diamond drill intercepts did not match that of the targeted RC and

trench results. The Company believes that the indicators of a mineralized system are present at

Majorodam, although the structural controls on gold mineralization are more complex than the initial

interpretation had suggested. Greenheart Gold's analysis of results, combined with structural

measurements from drill core and detailed mapping (supported by high-resolution drone magnetics)

indicate that gold mineralization may be controlled by shallow plunging fold hinges deformed within a

north-south shear at the Heuvel Main zone. This interpretation is similar to those presented by others

exploring the same greenstone belt in Suriname where drill orientations have played a crucial role in

defining volumes of gold mineralization. The diamond drill rig remains at Majorodam and the Company

intends to re-commence drilling to test the updated geologic model before the end of November.

Tosso Creek Update

Exploration at Greenheart Gold's Tosso Creek project in Suriname continues to advance with infill soil

sampling at a 400 m by 50 m sample spacing. Results from the soil program to date are shown in Figure

2, and continue to define several large gold anomalies, the largest extending over 5 km in length with

widths of up to 500 m. This extensive soil anomaly aligns with the orientation of the volcano-sedimentary

units located in the west and northwest of the project area, in addition to anomalies found along the

granite contact that runs strikes northeast in the south. An excavator has been mobilized to the project

and has commenced a 3,000 m trenching program over the strongest soil anomalies. In addition, a Lidar

survey has been completed, and a high-resolution drone magnetics survey is anticipated to be

completed by year end. Based on successful results, the Company would expect to commence drill

testing in the first half of 2026.

Gold Hill, Guyana

The Company recently entered into an option agreement with arms' length third parties to acquire a

100% interest in the Gold Hill project in Guyana. The project is located approximately 13.5 km east of

Aris Mining Corporation's Toroparu project, on which a Preliminary Economic Assessment was

released in October 2025 outlining a gold deposit containing 5.3 million ounces (Moz) of gold (Au) in

measured and indicated resources and 1.2 Moz Au of inferred resources. The Gold Hill project consists

of mineral rights covering an area of approximately 40 square kilometers in the Mazaruni mining district

in north-western Guyana. The project area is deformed around a dolerite intrusion and appears to have

been subjected to multiple deformation events and exhibits similar open folding to that observed at the

nearby Toroparu deposit. The presence of multiple gold bearing vein systems on the property suggests

a strong likelihood of hydrothermal alteration related to mineralizing fluids. The presence of artisanal

saprolite and alluvial mining at the project area provides further evidence of the gold mineralization in the

area.

Termination of the Tamakay and Abuya Option Agreements

At the Tamakay project in Guyana, the programs carried out by the Company included detailed mapping,

276 grab samples and 7,794 soil samples. In addition, 7,606 m of trenching was completed in areas of

interest uncovered by the initial programs. These activities were also supported by 85 line-km of ground

based magnetic surveys and 50 line-km of gradient array Induced Polarization survey (IP). Following this

activity, the Company completed a 1,473 m diamond drilling program to test several known occurrences

of high-grade quartz veins, which have been the subject of historic artisanal mining activity. The drill

program confirmed the high-grade nature and continuity of some of these veins; however, the intercepts

in general were relatively narrow and showed little evidence of gold mineralization in the wall rock or the

presence of more extensive sheeted type of vein system. The Company believes that the density of

veining and the extent of gold mineralization are insufficient to suggest potential for an economic deposit

of the size and scale required to justify development in such a remote area and has therefore elected to

terminate its option with the various property owners.

At Abuya, after approximately 12 months of exploration work, the Company completed detailed mapping

along with collecting 2,798 soil samples and 295 grab samples over the project area. Areas of interest

arising out of these programs were followed up by 3,263 m of trenching and channel sampling with no

meaningful results being reported. After completing these programs, the Company did not feel that the

targets warranted follow-up drilling and has therefore also decided to drop its option on the project.

The acquisition of Gold Hill and the dropping of Tamakay and Abuya are consistent with Greenheart

Gold's strategy to quickly assess projects and to be in a position to drill prospective targets in a 10 to

12-month timeframe or alternatively move on from projects that don't meet expectations and replace

these with new opportunities. The Company feels that this strategy will continue to provide the highest

possible chance of exploration success.

Sample Collection, Assaying and Data Management

Significant intervals in this press release have been calculated using a grade cut-off of 0.3 g/t Au, a

minimum length of 5 m, and a maximum length of 5 m of consecutive internal waste. Included significant

intervals have been calculated using a grade cut-off of 1.0 g/t Au, a minimum length of 3 m, and a

maximum length of 2 m of consecutive internal waste. Gold grades are uncapped and mineralized

intersection lengths are not necessarily true widths. RC drill samples are collected every meter and

weighed in their entirety at the rig side to ensure consistent sample collection, then split, bagged, and

tagged. Diamond drill core samples consist of half of either HQ or NQ core taken continuously at regular

intervals averaging 1.4 m, bagged, and labelled at the site core shed. Samples are submitted to either

Actlabs or Filab laboratories, both located in Paramaribo, Suriname, while respecting best-practice

chain of custody procedures. Samples are dried, crushed to 80% passing 2 mm, riffle split (to either 250

g or 500 g), and pulverized to 95% passing 105 μm. Coarse blanks are inserted by the Company, and

are used between and following suspected high-grade intervals. Barren sand flushes are inserted by the

analytical laboratory after each sample is pulverized to clean the bowl. Actlabs' pulverized samples are

transported by labs to their laboratory in Georgetown, Guyana (an ISO 9001 certified laboratory), whilst

Filab pulverized samples remain in Paramaribo for analysis. In both cases, gold assay is carried out

using a 30 g or 50 g fire assay with an atomic absorption finish. Assays with overlimit results are re-

assayed with a gravimetric finish. Certified reference materials and blanks are inserted at a rate of 5%

of samples shipped to the laboratories. RC field duplicates pulp duplicates are also generated at a rate

of 5% of samples. All assay data is subject to QA/QC prior to accepting into the Company database

managed by an independent consultant.

Qualified Person

All scientific and technical information in this press release has been reviewed and approved by Justin

van der Toorn, CGeol FGS, EurGeol, President and CEO of Greenheart Gold, and a Qualified Person

under Canadian

National Instrument 43-101 – Standards of Disclosure for Mineral Project

s.

About Greenheart Gold Inc.

Greenheart Gold is an exploration company that builds on a proven legacy of discoveries within the

Guiana Shield, a highly prospective geological terrain that hosts numerous gold deposits yet remains

relatively under-explored. The Company is led by former executives and members of the exploration

group of Reunion Gold, a team that was most recently noted for the discovery and delineation of the

multimillion-ounce Oko West deposit in Guyana. Greenheart Gold intends to build on its technical

knowledge, strong contact base and previous success from exploring in the Guiana Shield to assemble,

maintain and explore a portfolio of early-stage exploration projects in Guyana and Suriname that are

prospective for orogenic gold deposits.

Additional information about the Company is available on SEDAR+ (

www.sedarplus.ca

) and the

Company's website (

www.greenheartgold.com

).

For further information, please contact:

GREENHEART GOLD INC.

Justin van der Toorn, President and CEO, or

Doug Flegg CFA, Senior Vice President Corporate Development

E:

[email protected]

E:

[email protected]

Telephone: +1 450-800-2882

Cautionary Statement on Forward-Looking Information

All statements, other than statements of historical fact, contained in this press release constitute

"forward-looking information" and "forward-looking statements" within the meaning of certain securities

laws and are based on expectations and projections as of the date of this press release. Forward-

looking statements contained in this press release include, without limitation, those related to the

Company's plans and objectives, the timing of and execution of planned exploration activities,

geological interpretation, potential favorable setting and mineralization, other statements relating to

the business prospects of Greenheart Gold and, more generally, the section entitled "About

Greenheart Gold Inc."

Forward-looking statements are based on beliefs, expectations, estimates and projections as of the

time of this press release. Forward-looking statements are necessarily based upon a number of

estimates and assumptions that, while considered reasonable by the Company as of the time of such

statements, are inherently subject to significant business, economic and competitive uncertainties

and contingencies. These estimates and assumptions may prove to be incorrect. Such assumptions

include, without limitation, those underlying the statements in the section entitled "About Greenheart

Gold Inc."

Many of these uncertainties and contingencies can directly or indirectly affect, and could cause,

actual results to differ materially from those expressed or implied in any forward-looking statements.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general

and specific in nature, including among others, those risks and uncertainties set forth in the

Company's audited consolidated financial statements and related notes for the initial period from

April 19, 2024 to December 31, 2024 and the associated management's discussion & analysis, and

other documents and reports filed by the Company with Canadian securities regulators available

under the Company's profile on SEDAR+ at

www.sedarplus.ca

, and the risk that estimates, forecasts,

projections and other forward-looking statements will not be achieved or that assumptions do not

reflect future outcomes. Forward-looking statements are provided for the purpose of providing

information about management's expectations and plans relating to the future. Readers are cautioned

not to place undue reliance on these forward-looking statements as a number of important risk factors

and future events could cause the actual outcomes to differ materially from the beliefs, plans,

objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such

forward-looking statements. The Company cautions that the list of factors set forth in the Company's

filings that may affect future results is not exhaustive, and new, unforeseeable risks may arise from

time to time. The Company disclaims any intention or obligation to update or revise any forward-

looking statements or to explain any material difference between subsequent actual events and such

forward-looking statements, except to the extent required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this press release.

Figure 1 - Drill results from the Heuvel prospect at the Majorodam project in Suriname (new results

shown in bold). Background shows the first vertical derivative product derived from drone magnetics

RTP data; white contours define gold in soil anomalies. See press release text for significant interval

parameters.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11642/273906_aefd75e4142c0935_002full.jpg

Table 1 - Full list of significant results from the Heuvel (Majorodam project) trench sampling, RC and

core drilling completed to date.* Significant intervals in this press release have been calculated using

a grade cut-off of 0.3 g/t Au, a minimum length of 5 m, and a maximum length of 5 m of consecutive

internal waste. Included significant intervals have been calculated using a grade cut-off of 1.0 g/t Au, a

minimum length of 3 m, and a maximum length of 2 m of consecutive internal waste.

Hole ID

From

(m)

To

(m)

Interval

(m)

Au Grade

(g/t)

Grade x Thickness

(gm/t)

Cutoff*

(g/t Au)

MAJD25-002

41.50

49.50

8.00

0.70

5.59

0.3

MAJD25-002

56.30

61.40

5.10

0.34

1.72

0.3

MAJD25-002

118.50

130.80

12.30

0.82

10.05

0.3

inc

118.50

124.00

5.50

1.58

8.71

1

MAJD25-005

129.00

134.00

5.00

1.17

5.84

0.3

MAJD25-006

39.00

52.00

13.00

1.29

16.82

0.3

inc

44.50

50.00

5.50

2.30

12.62

1

MAJD25-006

58.60

82.40

23.80

0.55

12.97

0.3

inc

88.90

92.80

3.90

1.48

5.77

1

MAJD25-009

24.00

32.00

8.00

0.45

3.59

0.3

MAJD25-011

39.70

51.20

11.50

1.34

15.46

0.3

inc

41.20

46.20

5.00

2.77

13.86

1

MAJR25-001

1.00

7.00

6.00

0.73

4.38

0.3

inc

1.00

4.00

3.00

1.17

3.51

1

MAJR25-003

53.00

66.00

13.00

4.37

56.81

0.3

inc

60.00

66.00

6.00

9.34

56.01

1

MAJR25-009

1.00

14.00

13.00

0.40

5.15

0.3

MAJR25-010

96.00

126.00

30.00

2.06

61.68

0.3

inc

96.00

104.00

8.00

3.66

29.27

1

inc

115.00

126.00

11.00

2.27

24.93

1

MAJR25-015

24.00

42.00

18.00

1.47

26.39

0.3

MAJR25-015

43.00

48.00

5.00

5.02

25.08

0.3

inc

43.00

48.00

5.00

5.02

25.08

1

MAJR25-015

49.00

64.00

15.00

0.55

8.22

0.3

MAJR25-015

83.00

90.00

7.00

0.39

2.72

0.3

MAJR25-016

16.00

30.00

14.00

0.36

5.03

0.3

MAJR25-016

37.00

42.00

5.00

1.42

7.12

0.3

MAJR25-017

2.00

7.00

5.00

0.60

3.01

0.3

MAJT25-024

40.00

46.00

6.00

1.42

8.50

0.3

MAJT25-029

44.00

62.00

18.00

6.39

115.07

0.3

inc

50.00

60.00

10.00

11.02

110.22

1

MAJT25-032

0.00

10.00

10.00

0.49

4.91

0.3

Figure 2 - Updated soil results from the Tosso Creek project in Suriname.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/11642/273906_aefd75e4142c0935_003full.jpg

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/273906