Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGM.V ·

Granada Gold Plans 2019 Activities, Makes Management Changes

Management Changes

Granada Gold Plans 2019 Activities, Makes

Management Changes

ROUYN-NORANDA, QC

,

Feb. 12, 2019

/CNW/ - Granada Gold Mine (TSX.V: GGM) ("Granada

Gold" or the "Company") is pleased to announce the appointment of

Eric Owens

as Company

President.

Frank J. Basa

will remain as CEO and Chairman of Granada Gold.

Dr. Owens, PGeo, brings 25-plus years in the mining exploration industry, principally in

North

America

and

Latin America

, with, amongst others, Newmont Mining, BHP Minerals, and Echo Bay

Exploration. His experience has been focused on the discovery and development of gold and base

metal deposits. Most recently, he had been the President and CEO of Alexandria Minerals

Corporation, where he built gold resources in

Val d'Or, Quebec

, and other areas in the Canadian

Shield. He holds a PhD in geology from

Western University

.

Frank J. Basa

, CEO of Granada Gold, stated: "We are pleased to have Eric on board with us as we

move down our dual path of growth and development. He brings strong geological, management and

Abitibi experience, and will be a great addition to our team by helping us guide and run our

activities."

In other matters, the Company is advancing on plans for its 2019 activities, which will include both

exploration and development work. On the development front, the Company intends to further

evaluate the economic and engineering viability of the 2014 "Rolling Start" NI 43-101 Pre-Feasibility

Study, and is currently working through proposals for such studies.

Exploration activities will follow-up on work completed in 2018. Encouraging results from new gold

zones to the north of, east of, and below the recently announced resource estimate (see Press

Release

December 7, 2018

). Recent drill results from the area north of the Current Resources

include the following intersections (Press Release

January 8, 2019

):

8.39 g/t Au over 6 meters in hole GR-18-03;

Including 12.41 g/t Au over 4.0 meters.

Including 45.7 g/t Au over 1.0 meter.

5.45 g/t Au over 4 meters in hole GR-18-04;

Including 13.7 g/t Au over 1.5 meters.

Including 37.3 g/t Au over 0.5 meter.

8.15 g/t Au over 3 meters in hole GR-18-01

Including 23.3 g/t Au over 1.0 meter.

Also in 2018, positive results came from an airborne magnetic survey over the eastern claim group,

as well as from a trenching program near the Aukeko shaft, located 2 km east of the Current

Resources, which intersected up to 8.49 g/t gold over

0.5 m

(Press Release,

August 23, 2018

).

In 2019, exploration activities are aimed at following-up on these results: building on the Current

Resources by testing areas in close proximity to the Current Resources (below and along strike), as

well as follow-up drilling of recent exploration results from new targets. Activities will include

geophysical work and drilling, with focus on shallow to medium depth targets.

Qualified Persons

Merouane Rachidi P. Geo

., Ph.D., a geological, environmental and mining consultant and

Claude

Duplessis

, P. Eng., of GoldMinds Geoservices Inc., are qualified persons in accordance with

National Instrument 43-101. Both have both reviewed and approved the contents of this news

release.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. is continuing to develop the Granada Gold Property near

Rouyn-Noranda,

Quebec

. The property includes the former

Granada

gold mine which produced more than 50,000

ounces of gold at 10 grams per tonne gold in the 1930's before a fire destroyed the surface

buildings. Approximately 120,000 meters of drilling has been completed to date on the property,

focused mainly on the extended LONGBARS zone which trends 2 kilometers east west over a

potential 5.5 kilometers mineralized structure. The highly prolific

Cadillac Trend

, the source of 50

million plus ounces of gold production in the past century, cuts right through the north part of the

Granada

property on a line running from

Val-d'Or

to

Rouyn-Noranda Quebec

.

The Company is in possession of all permits required to commence the initial mining phase known as

the "Rolling Start", which allows the company to mine up to 550 tonnes per day, capable of

producing up to 675,000 tonnes of ore over a 3-year period of time. Additional information is

available at

www.granadagoldmine.com

.

"Frank J. Basa"

Frank J. Basa P. Eng

.

Chief Executive Officer and Chairman

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements including but not limited to

comments regarding the timing and content of upcoming work programs, geological interpretations,

receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements

address future events and conditions and therefore, involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements.

SOURCE

Granada Gold Mine Inc.

View original content:

http://www.newswire.ca/en/releases/archive/February2019/12/c6468.html

%SEDAR: 00004087E

For further information:

Eric Owens, PGeo, President, at 1-416-509-5385 or Wayne

Cheveldayoff, Corporate Communications, at 416-710-2410, or [email protected]

CO: Granada Gold Mine Inc.

CNW 07:30e 12-FEB-19