Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGM.V ·

Granada Gold Outlines 2020 High-Grade Exploration Program Mr. Frank Basa reports:

Exploration Programs

Granada Gold Outlines 2020 High-Grade

Exploration Program

Mr.

Frank Basa

reports:

ROUYN-NORANDA, QC

,

June 2, 2020

/CNW/ - Granada Gold Mine (TSXV: GGM) ("Granada

Gold" or the "Company") is pleased to provide an update of its 2020 plans and activities aimed at

exploration and bulk sampling.

Highlights

:

Diamond drilling aims to focus on the high-grade Vein No. 1 structure. To date, the structure has

been traced for 500 metres on surface

Completion of bulk sample of high-grade Vein No. 1, targeting 30-50 tonnes mineralized

material. The bulk sample will be processed at Temiskaming Testing Laboratory (TTL) in

Cobalt, Ontario

Historical Recap

:

Historic underground production between 1930 and 1935, from 2 shafts had an average grade

of 9.7 grams/tonne gold and 1.5 grams/tonne silver from 164,816 tonnes of mineralized material

(51,476 ounces gold in 181,744 tons at 0.28 oz/ton) primarily from Vein No.2 underground *

A 1994 bulk sample extracted 87,311 tonnes grading 5.17 g/t gold from Pit No.1 (on Vein No. 1)

*

A later, 1996 bulk sample extracted a bulk sample of 22,095 tonnes from surface grading 3.46

g/t gold from Vein 2

*The above disclosure of the bulk sample size and grade is extracted from the 43-101 Technical

Report dated

February 13, 2019

on the Granada Gold Project Mineral Resource Estimate,

Rouyn-

Noranda, Quebec

authored by the Qualified persons,

Allan Armitage

, Ph. D., P.

Geo and Maxime

Dupere

, B.SC., Geo both of SGS Canada Inc. The Company has no reason to doubt its reliability.

Frank J. Basa

, P.Eng., Granada Gold's President and CEO, comments: "Continuing on our

successful drill programs of 2019, we will now use new and recent results to help our re-

interpretation of historical drill data with the focus on high-grade, near-surface mineralization

models".

Drill programs in 2019 focussed on testing the gold grade continuity and variability within mineralized

structures.

GR-19-A intersected 11.45 g/t gold from 0 to 33 metres core length. The horizontal width, based on

outcrop, is about 9 meters and true width is estimated at 6.3 meters. The core length reported is

estimated to have intersected only 15-20% of the entire thickness of the zone. However, it is a real

known extent in that direction down dip of gold mineralization within the intersected length. Assays

are uncut except where indicated (refer to

January 9, 2020

, news release).

GR-19-C intersected a high-grade zone with 7.67 g/t gold over fifteen meters of core length from

near surface at downhole depth of 18.5 to 33.5 metres on the extended LONG Bars zone (refer to

Nov 6, 2019

, news release). Assays are uncut except where indicated. True length is not known at

present time.

Coarse, native gold was observed in the drill core of hole GR-19-E which intersected a high-grade

zone with 12.32 g/t Au over 2 metres core length at a depth of 35.5 metres on the extended LONG

Bars zone (refer to

Oct 15, 2019

, news release). The core length reported is estimated to have

intersected 85-90% of true thickness of the zone. Assays are uncut except where indicated.

It is important to note that the current NI 43-101 resource calculation by SGS does not include the

above mineralized zone as it was recently uncovered by stripping for a water sump.

The current resource at the Company's Granada Gold project in

Rouyn-Noranda, Quebec

is detailed

in the report filed on Sedar, a technical report compliant with National Instrument 43-101 titled,

"Granada Gold Project Mineral Resource Estimate

Rouyn-Noranda, Quebec, Canada

." The report,

written by Independent Qualified Persons Allan Armitage, PhD, P.Geo, and

Maxime Dupere, BSc

,

P.Geo, of SGS Canada Inc., provides support for the following resource estimate:

Current Resources: 2019 Pit-Constrained Resource Estimate

1

Category

Tonnes

Grade (g/t Au)

Contained Gold (oz.)

Measured

12,637,000

1.02

413,000

Indicated

9,630,000

1.13

349,000

M&I Total

22,267,000

1.06

762,000

Inferred

6,930,000

2.04

455,000

1

Cutoff 0.4 g/t Au; see Press Release of February 13, 2019 for detailed notes.

Qualified Persons

For the purposes of this announcement,

Claude Duplessis

, P. Eng., of Goldminds Geoservices Inc.,

a geological, environmental and mining consultant and qualified person in accordance with National

Instrument 43-101, has reviewed and approved the contents of this news release.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. is continuing to develop the Granada Gold Property near

Rouyn-Noranda,

Quebec

. The property includes the former

Granada

gold mine which produced more than 50,000

ounces of gold at 10 grams per tonne gold in the 1930's before a fire destroyed the surface

buildings. Approximately 120,000 meters of drilling has been completed to date on the property,

focused mainly on the extended LONG Bars zone which trends 2 kilometers east west over a

potential 5.5 kilometers mineralized structure. The highly prolific

Cadillac Trend

, the source of 50

million plus ounces of gold production in the past century, cuts right through the north part of the

Granada

property on a line running from

Val-d'Or

to

Rouyn-Noranda Quebec

.

The Company is in possession of all permits required to commence the initial mining phase known as

the "Rolling Start", which allows the company to mine up to 550 tonnes per day, capable of

producing up to 675,000 tonnes of ore over a 3-year period of time. Additional information is

available at

www.granadagoldmine.com

.

"Frank J. Basa"

Frank J. Basa P. Eng

.

Chief Executive Officer and Chairman

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. This news release may contain forward-looking statements including but not limited to

comments regarding the timing and content of upcoming work programs, geological interpretations,

receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements

address future events and conditions and therefore, involve inherent risks and uncertainties. Actual

results may differ materially from those currently anticipated in such statements.

SOURCE

Granada Gold Mine Inc.

View original content:

http://www.newswire.ca/en/releases/archive/June2020/02/c6944.html

%SEDAR: 00004087E

For further information:

Wayne Cheveldayoff, Corporate Communications, at 416-710-2410 or

[email protected]

CO: Granada Gold Mine Inc.

CNW 07:30e 02-JUN-20