Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGM.V ·

Granada Gold Mine Completes Metallurgical & Environmental Test Work for Potential Custom Milling

Metallurgy & Processing

2875 Ave Granada

Rouyn Noranda, Québec J9Y 1Y1

Tel : 819-797-4144 / Fax: 819-792-2306

Granada Gold Mine Completes Metallurgical & Environmental Test

Work for Potential Custom Milling

Rouyn Noranda, Q.C., March 5, 2024 - Granada Gold Mine Inc. (TSXV: GGM) (OTC: GBBFF) (Frankfurt: B6D)

(the “Company” or “Granada”) announces the completion of metallurgical and environmental test work

at SGS Lakefield.

Test Work Highlights:

- Mineralized gold and silver grades of open-pit bulk sample:

Gold 3.0 to 5.5 grams per tonne

Silver 0.5 to 1.5 grams per tonne

- A total of 50 samples of ten kilograms each were subjected to the test work.

- Test work indicated that Granada mineralized material can be co -mingled with owner ’s

mineralized material for processing or , with the addition of 35 kilograms of calcite material to

Granada mineralized material, would permit custom processing at any mill in Ontario or Quebec.

Granada Gold Mine Inc. remains confident in the potential of processing the mineralized material

economically. With mining permits still in place, the Company has begun an internal study for potential

milling of the mineralized open-pit material off-site at a custom mill or the potential for on-site

processing.

Qualified person

The technical information in this news release has been reviewed and approved by Claude Duplessis,

P.Eng., GoldMinds Geoservices Inc., a member of the Québec Order of Engineers and a qualified person

in accordance with the National Instrument 43-101 standards.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. continues to develop and explore its 100% owned Granada Gold Property near

Rouyn-Noranda, Quebec, which is adjacent to the prolific Cadillac Break. The Company owns 14.73 square

kilometers of land in a combination of mining leases and claims. The Company is undergoing a large drill

program with 30,000m out of 120,000m complete. The drills are currently paused to provide the technical

team with the necessary time to evaluate and assimilate existing data.

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well

as from current and historical drilling, up to twenty -two mineralized structures trending east -west over

five and a half kilometers. Three of these structures were mined historically from four shafts and three

open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236

m and 498 m with open-pit grades from 3.5 to 5 grams per tonne gold.

Mineral Resource Estimate

On August 20, 2022 the Company released an updated NI 43-101 technical report supporting the resource

estimate update for the Granada Gold project (Please see July 6, 2022 news release) reporting that the

Granada deposit contains an updated mineral resource, at a base case cut-off grade of 0.55 g/t Au for pit

constrained mineral resources within a conceptual pit shell and at a base case cut-off grade of 2.5 g/t for

underground mineral resources within reasonably mineable volumes, of 543,000 ounces of gold

(8,220,000 tonnes at an average grade of 2.05 g/t Au) in the Measured and Indicated category, and

456,000 ounces of gold (3,010,000 tonnes at an average grade of 4.71 g/t Au) in the Inferred category.

Please see Table 1 below for full details. Report reference: Granada Gold Project Mineral Resource

Estimate Update, Rouyn -Noranda, Quebec, Canada authored by Yann Camus, P.Eng. and Maxime

Dupéré, B.Sc, P.Geo., SGS Canada Inc. dated August 20th, 2022 and wi th an effective date of June 23rd,

2022.

Table 1: Mineral Resource Estimate Showing Tonnes, Average Grade, and Gold Ounces

Cut-Off

(g/t Au) Classification Type Tonnes Au (g/t) Gold Ounces

0.55 / 2.5 Measured1 InPit+UG 4,900,000 1.70 269,000

Indicated InPit+UG 3,320,000 2.57 274,000

Measured & Indicated InPit+UG 8,220,000 2.05 543,000

Inferred InPit+UG 3,010,000 4.71 456,000

(1) The 1930-1935 production was removed from these numbers (164,816 tonnes at 9.7 g/t Au / 51,400

ounces Au).

(2) The Independent QP for this resources statement is Yann Camus, P.Eng., SGS Canada Inc.

(3) The effective date is June 23rd, 2022.

(4) CIM (2014) definitions were followed for Mineral Resources.

(5) Mineral resources which are not mineral reserves do not have demonstrated economic viability. An

Inferred Mineral Resource has a lower level of confidence than that applying to a Measured and Indicated

Mineral Resource and must not be converted to a Minera l Reserve. It is reasonably expected that the

majority of Inferred Mineral Resources could be upgraded to Indicated Mineral Resources with continued

exploration.

(6) No economic evaluation of the resources has been produced.

(7) All figures are rounded to reflect the relative accuracy of the estimate. Totals may not add due to

rounding

(8) Composites have been capped where appropriate. The 2.5 m composites were capped at 21 g/t Au in the

thin rich veins and at 7 g/t Au in the low-grade volumes.

(9) Cut-off grades are based on a gold price of US$1,700 per ounce, a foreign exchange rate of US$0.78 for

CA$1, a processing gold recovery of 93%.

(10) Pit constrained mineral resources are reported at a cut-off grade of 0.55 g/t Au within a conceptual pit

shell

(11) Underground mineral resources are reported at a cut -off grade of 2.5 g/t Au within reasonably

mineable volumes.

(12) A fixed specific gravity value of 2.78 g/cm3 was used to estimate the tonnage from block model volumes

(13) There are no mineral reserves on the Property.

(14) The deepest resources reported are at a depth of 990 m.

(15) SGS is not aware of any known environmental, permitting, legal, title -related, taxation, socio -political,

marketing or other relevant issues that could materially affect the mineral resource estimate.

(16) The results from the pit optimization are used solely for the purpose of testing the “reasonable prospects

for economic extraction” by an open pit and do not represent an attempt to estimate mineral reserves. There

are no mineral reserves on the Property. The results are used as a guide to assist in the preparation of a

mineral resource statement and to select an appropriate resource reporting cut-off grade.

The property includes the former Granada Gold underground mine which produced more than 50,000

ounces of gold at 10 grams per tonne gold in the 1930’s from two shafts before a fire destroyed the surface

buildings. In the 1990s, Granada Resources extracted a bulk sample (Pit #1) of 87,311 tonnes grading 5.17

g/t Au. They also extracted a bulk sample (Pit # 2) of 22,095 tonnes grading 3.46 g/t Au.

“Frank J. Basa”

Frank J. Basa, P. Eng., Ontario

Chief Executive Officer

For further information, Contact:

Frank J. Basa, P.Eng., Ontario

Chief Executive Officer

P: 416-625-2342

Or:

Wayne Cheveldayoff,

Corporate Communications

P: 416-710-2410

E: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release

may contain forward -looking s tatements which include, but are not limited to, comments that involve future

events and conditions, which are subject to various risks and uncertainties. Except for statements of historical

facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and

security of mineral property titles, availability of funds, and others are forward -looking. Forward -looking

statements are not guarantees of future performance and actual results may vary materially from thos e

statements. General business conditions are factors that could cause actual results to vary materially from

forward-looking statements.