Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGM.V ·

Granada Gold Mine Announces Dividend Dates

Corporate Actions

Granada Gold Mine Announces Dividend Dates

ROUYN NORANDA, QC

,

Feb. 20, 2018

/CNW/ - Granada Gold Mine Inc. (TSX-V: GGM) (OTCPK: GBBFF) (Frankfurt: B6D) (the

"Company" or "Granada") announces that further to its news release dated

February 9, 2018

, the Company will be distributing its third annual

dividend of 2,500,000 Castle Silver Resources Inc. ("Castle") units on

February 27, 2018

, to its shareholders on a pro rata basis with a record

date of

February 22, 2018

, subject to TSX Venture Exchange approval.

Each unit is comprised of one common share in the capital of Castle and one common share purchase warrant, with each warrant entitling the

holder to acquire one common share of Castle on or before

September 15, 2018

at an exercise price of

$0.10

per common share.

The distribution of the Castle units to the Company's shareholders of record will be distributed on a pro rata basis in accordance with the following

terms:

The 2,500,000 Castle units will be distributed on

February 27, 2018

.

The ex-dividend date will be

February 21, 2018

- from this date and forward, new shareholders will not receive the dividend.

The holder-of-record date will be

February 22, 2018

– the date on which the shareholders who are to receive the dividend are recognized.

For the fourth stock distribution to occur on a subsequent distribution date in 2019, separate ex-dividend and holder-of-record dates will be

established in 2019.

About Granada Gold Mine Inc.

Granada Gold Mine Inc. is developing the Granada Gold Property near

Rouyn-Noranda, Quebec

. The property includes the former

Granada

gold

mine which produced more than 50,000 ounces of gold in the 1930s before a fire destroyed the surface buildings. The highly prolific

Cadillac

Trend

, which has been the source of more than 50 million ounces of gold produced in the past century on a line running from

Val-d'Or

to

Rouyn-

Noranda

, cuts through the north part of the property.

An updated Mineral Resource Estimate and revised Block Model dated

June 30, 2017

, with effective date of

May 16, 2017

, includes the first

material estimate of high-grade gold resources discovered in zones at depth immediately north of the LONG Bars Zone open-pit deposit.

An initial Inferred underground resource of

10,386,500

tonnes grading

4.56

g/t Au at a cut-off grade of

1.5

g/t (

1.5

million oz. Au) has been

outlined along

600

meters of strike, north of the original near-surface discovery at

Granada

. Open-pit-constrained resources have

625,000

ounces

Measured at

1.14

g/t Au and

182,700

ounces Indicated at

1.26

g/t Au with a cut-off grade of 0.39 g/t Au (

807,700

ounces M&I at

1.16

g/t Au)

representing a major increase in Block Model estimates for Granada vs. 2012 Block Model.

The Company has obtained all necessary permits for the initial mining phase known as the "Rolling Start" for which stripping has already begun,

and has been conducting exploration drilling in order to expand the reported mineral resource for the property. Additional information is available

at

www.granadagoldmine.com

.

"Frank J. Basa"

Frank J. Basa P. Eng

.

President and Chief Executive Officer

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not

limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential

mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and

uncertainties. Actual results may differ materially from those currently anticipated in such statements.

SOURCE

Granada Gold Mine Inc.

View original content: http://www.newswire.ca/en/releases/archive/February2018/20/c5846.html

%SEDAR: 00004087E

For further information:

Frank J. Basa, P. Eng., President and CEO at 1-819-797-4144 or Wayne Cheveldayoff, Investor Relations, at 416-

710-2410 or [email protected]

CO: Granada Gold Mine Inc.

CNW 15:00e 20-FEB-18