Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGM.V ·

Granada East Project Revisited in Search of Historic High-Grade 200 Grams per Tonne Gold Mineralization

Drill Results

2875 Ave Granada

Rouyn Noranda, Québec J9Y 1Y1

Tel : 819-797-4144 / Fax: 819-792-2306

Granada East Project Revisited in Search of Historic High-Grade 200 Grams

per Tonne Gold Mineralization

April 14, 2025, Rouyn Noranda, Quebec, Granada Gold Mine Inc. (TSXV: GGM) (the “Company” or

“Granada”) is pleased to announce its expanded exploration focus on the Granada East Project. The

potential strike length on the property is 5.5 kilometres, including the eastward extension 2.5

kilometres from the Granada Pit 1 to the historical Aukeko Shaft and a further 2 kilometres to the

Austin-Rouyn Shaft.

The Aukeko Shaft was sunk on the “Auk Shear” zone in conjunction with stripping and trenching

which was mapped over a one-kilometre length with an average width of 50 metres. The Auk Shear

zone was the location of the Bert Vein where three bulk samples were reported to have been taken

in 1938 from a trench approximately 50-to-150 metres east of the Aukeko Shaft . The bulk samples

averaged a grade of 7.0 ounces gold per ton (240.0 grams per tonne) (from public files with

MERN(Ministère d’Energie et Ressources Naturelles) GM52851)(News Release July 10, 2018).

The Austin Rouyn shaft, sunk to a depth of 68 metres, reported grab samples from the first level (at

36 metres) taken in 1940 and assaying up to 8.57 ounces of gold per short ton ( 291.4 grams per

tonne) (1980, Report: GM36668).

Exploration Highlights:

• Phase I - Conduct Drone Lidar survey to integrate with historic drone mag survey, property

mapping and drilling

• Phase II – Conduct Second round of geophysics (survey details still in discussion with

geophysics company, potentially radiometric) to maximize potential drill targets for REE,

Alkali Metals and Gold mineralization.

The Granada Project lies along a significant but underexplored structural corridor. To date, over 90%

of exploration activity has been concentrated on the western portion of the property, while Granada

East remains largely unexplored , despite historical records dating as far back as the 1920s. The

renewed focus on Granada East represents a critical step forward in unlocking the full potential of

the project.

About Granada East:

The Aukeko gold mine is part of the east-west trending structure on the Granada Gold Mine

property. It is two kilometres east from the extended LONG Bars zone where over 160,000 metres of

drilling has been undertaken to date, in addition to historical drilling from the 1990s. A further 1.9

kilometres east is the Austin -Rouyn Mine. Note that there are two cross -cutting intrusive dykes of

undefined width within that strike length. The potential strike length is conceptual in nature as there

has been insufficient exploration to define the full length of the mineralized mat erial and it is

uncertain if further exploration will do so.

In the late 1930s, a shaft was sunk to 13 metres and extensive trenching was undertaken on surface

at the Aukeko Mine. Mapping identified several auriferous structures within a 500-metre wide, east-

west trending zone with shearing, alteration, and quartz veining along with numerous porphyry

intrusions.

2

Proposed Exploration:

Granada Gold Mine conducted a Drone Magnetic Survey in 2018, which currently covers most of the

property. Building on this data, the Company plans to initiate a Phase I LiDAR survey , aimed at

enhancing the structural understanding of the area. The integration of this new data with the existing

magnetic survey, historic geological mapping (notably KWG, 1993), and historical drilling results will

provide a robust framework for identifying high -priority exploration targets th rough the

delineations of prominent structures.

“The opportunity to explore for high grade gold opens up a new frontier at Granada, particularly in

the underexplored eastern claim block,” said Frank J. Basa, President CEO . “By leveraging a

combination of modern and historical data, we’re positioning ourselves to make informed, high -

impact exploration decisions.”

In preparation for Phase II, Granada Gold will engage with a local geophysical firm to determine the

most effective methods for further defining gold-bearing structures. EM/IP work will be considered

as part of this ongoing evaluation. The Company’s goal is to partner with strong technical

collaborators to define high -potential drill targets, enhancing both the mineral and structural

understanding of the Granada property and our commitment to fostering local businesses and

communities.

Qualified person

The technical information in this news release was reviewed and approved by Matthew Halliday,

P.Geo., Director of Granada Gold Mine Inc., and member of the Ordre des Géologues du Québec, who

is a Qualified Person in accordance with National Instrument 43-101.

Mineral Resource Estimate

On August 22, 2022 the Company filed an updated NI 43 -101 technical report supporting the

resource estimate update for the Granada Gold project (Please see July 6, 2022 news release)

reporting that the Granada deposit contains an updated mineral resource, at a base case cut-off grade

of 0.55 g/t Au for pit constrained mineral resources within a conceptual pit shell and at a base case

cut-off grade of 2.5 g/t for underground mineral r esources within reasonably mineable

volumes, of 543,000 ounces of gold (8,220,000 tonnes at an average grade of 2.05 g/t Au) in the

Measured and Indicated category, and 456,000 ounces of gold (3,010,000 tonnes at an average grade

of 4.71 g/t Au) in the Inf erred category. Please see Table 1 below for full details. Report reference:

Granada Gold Project Mineral Resource Estimate Update, Rouyn-Noranda, Quebec, Canada authored

by Yann Camus, P.Eng. and Maxime Dupéré, B.Sc, P.Geo., SGS Canada Inc. dated August 20th, 2022

and with an effective date of June 23rd, 2022.

Table 1: Mineral Resource Estimate Showing Tonnes, Average Grade, and Gold Ounces

Cut-Off

(g/t Au) Classification Type Tonnes Au (g/t) Gold Ounces

0.55 / 2.5 Measured1 InPit+UG 4,900,000 1.70 269,000

Indicated InPit+UG 3,320,000 2.57 274,000

Measured & Indicated InPit+UG 8,220,000 2.05 543,000

Inferred InPit+UG 3,010,000 4.71 456,000

About Granada Gold Mine Inc.

3

Granada Gold Mine Inc. continues to develop and explore its 100% owned Granada Gold Property

near Rouyn-Noranda, Quebec, and is adjacent to the prolific Cadillac Break. The Company owns 14.73

square kilometers of land in a combination of mining leases and claims. The Company is currently

undergoing a large drill program with 18,000m out of 120,000m complete. The drills are currently

paused to provide the technical team with the necessary time to evaluate, assimilate existing data

and wait for improved market conditions.

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as

well as from current and historical drilling, up to twenty -two mineralized structures trending east-

west over five and a half kilometers. Three of these struct ures were mined historically from four

shafts and three open pits. Historical underground grades were 8 to 10 grams per tonne gold from

two shafts down to 236 m and 498 m with open pit grades from 3.5 to 5 grams per tonne gold (43-

101 reference).

The property includes the former Granada Gold underground mine which produced more than

50,000 ounces of gold at 10 grams per tonne gold in the 1930’s from two shafts before a fire

destroyed the surface buildings. In the 1990s, Granada Resources extracted a bulk sample (Pit #1)

of 87,311 tonnes grading 5.17 g/t Au. They also extracted a bulk sample (Pit # 2) of 22,095 tonnes

grading 3.46 g/t Au. Details available in 43-101 report and on Company website:

https://granadagoldmine.com/

For further information, Contact:

Frank J. Basa, P.Eng. member of Professional Engineers Ontario

Chief Executive Officer

P: 416-625-2342

Or:

Wayne Cheveldayoff,

Corporate Communications

P: 416-710-2410

E: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of

the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may contain forward -looking statements which include, but are not limited to, comments that

involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of

historical facts, comments that address resource potential, upcoming work programs, geological interpretations,

receipt and security of mineral property titles, availability of funds, and others are forward -looking. Forward -

looking statements are not guarantees of future performance a nd actual results may vary materially from those

statements. General business conditions are factors that could cause actual results to vary materially from

forward-looking statements. The Company does not undertake to update any forward-looking information in this

news release or other communications unless required by law.