Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Reports Annual Production of 1.8M AgEq Oz and Received $11M USD in Input Tax Recoverable

Production Results

GoGold Reports Annual Production of 1.8M AgEq Oz and Received $11M

USD in Input Tax Recoverable

Shares Outstanding: 295,437,256

Trading Symbols: TSX: GGD

OTCQX: GLGDF

HALIFAX, NS

,

Oct. 12, 2022

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX: GLGDF)

("GoGold", "the Company")

is pleased to report production

for the year ending

September 30, 2022

of 1,810,326 silver equivalent ounces, consisting of 741,772 silver ounces, 10,708 gold ounces, and 469 tonnes of

copper. Quarterly production at Parral was 400,467 silver equivalent ounces, consisting of 145,944 silver ounces, 2,278 gold ounces, and 124 tonnes of

copper.

The Company had

$20M USD

in input tax recoverable which related to VAT receivable from the Mexican Federal Government for the years of 2017 to 2022.

The Company received

$11M

which related to 2017 and 2018 which included interest of

$5M

. Management continues to work with the tax authority on the

remaining claims and expects to receive these amounts in due course.

"2022 represents our eighth year of continuous production at Parral, and we look forward to approximately seven more years of sustainable production as we

strengthen our ESG programs through our tailings reprocessing and remediation in

Mexico

," said

Brad Langille

, President and CEO. "The Company was

successful in collecting its VAT receivable of

$6M USD

plus interest of

$5M USD

for a total of

$11M USD

. The Company continues to maintain a very strong

balance sheet and cash position enabling us to also execute on our exciting Los Ricos project."

In the month of

August 2022

, the Parral operation endured some of the most intense rainfalls seen at the project to date, which resulted in significant dilution to

the pregnant solution. All rain and solution was properly contained, with no solution discharged into the environment. The diluted solution resulted in diminished

production levels in the months of August and September, as the leaching kinetics were impacted by the rain event. Production appears to be trending upwards

in the beginning of October.

Table 1: Quarterly Production Summary

Quarter Ended

Jun 2021

Sep 2021

Dec 2021

Mar 2022

Jun 2022

Sep 2022

Silver Production (oz)

315,632

221,202

195,678

186,655

213,495

145,944

Gold Production (oz)

3,170

3,437

2,558

2,791

3,081

2,278

Copper Production (tonnes)

120

138

123

125

98

124

Silver Equivalent Production (oz)

1

575,302

526,044

444,071

455,991

509,796

400,467

1

. "Silver equivalent production" include gold ounces and copper tons produced and converted to a silver equivalent based on a ratio of the average market metal price for each period. The gold:silver ratio for each of the periods presented was: Jun 2021 – 68, Sep 2021 – 73, Dec

2021 – 77, Mar 2022 – 77, June 2022 – 83, Sep 2022 – 90. The copper:silver ratios were: June 2021 – 369, Sep 2021 – 383, Dec 2021 – 417, Mar 2022 – 411, June 2022 – 415, Sep 2022 – 398.

Table 2: Annual Production Summary

Quarter Ended

Sep 2019

Sep 2020

Sep 2021

Sep 2022

Silver Production (oz)

1,059,438

1,315,661

1,138,358

741,772

Gold Production (oz)

9,149

10,089

13,447

10,708

Copper Production (tonnes)

-

260

470

469

Silver Equivalent Production (oz)

1

1,847,835

2,295,416

2,270,073

1,810,326

1.

"Silver equivalent production" include gold ounces and copper tons produced and converted to a silver equivalent based on a ratio of the average market metal price for each period. The gold:silver ratio for each of the periods presented was: Sep 2019 – 86, Sep 2020 – 89, Sep

2021 – 72, Sep 2022 – 82. The copper:silver ratio for the periods presented was: Sep 2020 – 302, Sep 2021 – 348, Sep 2022 – 410.

Mr.

Robert Harris

, P.Eng. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality projects in

Mexico. The Company operates the Parral Tailings mine in the

state of Chihuahua

and has the Los Ricos South and Los Ricos North exploration projects in the

state of

Jalisco

. Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects. For more information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S. Securities

Act"), or any state securities laws, and may not be offered or sold within

the United States

or to, or for the benefit of, U.S. persons (as defined in Regulation S

under the U.S. Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable state securities laws or pursuant

to exemptions therefrom. This release does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements of

historical fact, included in this release, including, without limitation, statements regarding production and cash flows of the Parral tailings mine, the ability of

GoGold to self fund its ongoing exploration and administrative costs, future operating margins, future production and processing, and future plans and

objectives of GoGold, constitute forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of

factors and assumptions which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in

connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of

mineral resource estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual

results and future events could differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with

GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and

global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous

disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking

information contained in this release is made as of the date of this release.

View original content:

https://www.prnewswire.com/news-releases/gogold-reports-annual-production-of-1-8m-ageq-oz-and-received-11m-usd-in-input-tax-recoverable-301647164.html

SOURCE

GoGold Resources Inc.

View original content:

http://www.newswire.ca/en/releases/archive/October2022/12/c8528.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E: [email protected]

CO: GoGold Resources Inc.

CNW 07:30e 12-OCT-22