Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Intersects 9.5m at 430 g/t Silver Equivalent at Los Ricos South Project

Drill Results

GoGold Intersects 9.5m at 430 g/t Silver Equivalent

at Los Ricos South Project

Shares Outstanding: 222,025,246

Trading Symbols: TSX: GGD

OTCQX: GLGDF

HALIFAX

,

March 10, 2020

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX: GLGDF) ("GoGold", "the

Company")

is pleased to release the assay results from 11 diamond drill holes at the South Project in the

Company's Los Ricos district project, including two at

San Juan

and nine in the Main area.

Hole LRGG-20-106 was drilled on Section 775N in the

San Juan

area of the project and intersected the Los

Ricos quartz vein from 101.1 to

122.0m

. The vein averaged 219 g/t silver equivalent or 2.92 g/t gold equivalent,

made up of 118 g/t silver and 1.35 g/t gold over 21.0 metres and included 9.5 metres of 430 g/t silver

equivalent, or 5.73 g/t gold equivalent.

"We've increased the pace of drilling at the Los Ricos South Project and continue to hit wide intercepts of good

grade. We've released the results of our first short holes along the el Abra outcrop which confirm grade starts

at surface, including hole 102 which showed

10.7m

of 235 g/t silver equivalent," said

Brad Langille

, President

and CEO. "At the Los Ricos North Project, we are mobilizing and completing preparatory work for our

upcoming drilling campaign (as announced

February 20, 2020

per PP#07-2020)."

Hole LRGG-20-101 was also drilled on section 775N in the

San Juan

area of the project and intersected 33.8

metres from 120.8 to

154.5m

of 156 g/t silver equivalent or 2.08 g/t gold equivalent. Included in the intercept

was

5.0m

of 617 g/t silver equivalent.

Detailed intersections are listed in Table 1, and the hole locations are shown in Table 2.

A longitudinal section summary of all the holes drilled at Los Ricos to date is available at

https://gogoldresources.com/component/rsfiles/preview?path=diagrams%252FLosRicos_LongSec_20200310.pdf

Table 1: Drill Hole Intersections

Hole ID

Area

Section

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGG-20-101

San Juan

775N

120.8

154.5

33.8

0.54

115.9

2.08

156.0

including

146.5

151.5

5.0

2.00

466.9

8.22

616.6

LRGG-20-102

Main

300N

0.0

10.7

10.7

1.05

156.2

3.13

234.8

LRGG-20-103

Main

250N

0.0

17.0

17.0

0.28

93.1

1.53

114.4

LRGG-20-104

Main

225N

0.0

20.0

20.0

0.44

88.3

1.61

120.9

LRGG-20-105

Main

150N

2.2

24.6

22.4

0.39

75.8

1.40

105.3

including

15.4

21.8

6.4

0.81

134.8

2.60

195.3

LRGG-20-106

San Juan

775N

101.1

122.0

21.0

1.35

117.9

2.92

219.4

including

101.1

110.6

9.5

2.83

217.0

5.73

429.5

LRGG-20-107

Main

125N

6.0

34.0

28.0

0.20

40.6

0.75

55.9

LRGG-20-108

Main

75N

20.9

33.8

12.9

0.79

96.9

2.08

155.8

stope

33.8

38.0

4.2

LRGG-20-109

Main

350N

5.2

21.0

15.8

0.69

79.5

1.75

131.4

including

9.0

12.0

3.0

2.61

225.0

5.61

420.6

and

27.0

29.6

2.6

0.39

92.5

1.63

122.0

LRGG-20-110

Main

375N

0.0

22.0

22.0

0.38

102.0

1.74

130.3

including

0.0

6.0

6.0

0.62

191.6

3.17

238.0

LRGG-20-111

Main

625N

226.0

232.9

6.9

0.31

49.5

0.97

72.6

1.

Not true width

2.

AuEq and AqEq converted using a silver to gold ratio of 75:1

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGG-20-101

610271

2327937

1276

50

-75

190.5

LRGG-20-102

610663

2327678

1276

50

-20

60.0

LRGG-20-103

610716

2327624

1266

50

-20

42.0

LRGG-20-104

610736

2327608

1265

50

-20

51.0

LRGG-20-105

610792

2327558

1252

50

-20

54.0

LRGG-20-106

610271

2327937

1276

50

-60

150.0

LRGG-20-107

610815

2327544

1252

50

-20

60.0

LRGG-20-108

610845

2327505

1263

50

-20

38.8

LRGG-20-109

610643

2327694

1283

50

-20

51.0

LRGG-20-110

610623

2327709

1278

50

-20

27.0

LRGG-20-111

610216

2327695

1224

50

-65

351.0

Los Ricos Exploration Projects

The Company is undertaking two drilling and exploration projects at its Los Ricos property located in

Jalisco

state, Mexico. The South Project began in

March 2019

and includes the 'Main' area, which is focused on drilling

around a number of historical mines including

El Abra

, El Troce,

San Juan

, and Rascadero. The South Project

also includes the

Cerro Colorado

and Las Lamas targets. The North Project was launched this month and

includes the Monte del Favor, Salomon, La Trini, and Mololoa targets.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the

sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core

being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or

for metallurgical test work.

The sealed and tagged sample bags are transported to the ActLabs facility in

Zacatecas, Mexico

. ActLabs

crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh

(106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits

greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-

element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100

grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and

includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks

and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each

batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed

GoGold's QA/QC protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible

for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,

developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings

project in the

state of Chihuahua

and has the Los Ricos exploration project in the state of

Jalisco

.

Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects. For more

information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act

of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold

within

the United States

or to, or for the benefit of, U.S. persons (as defined in Regulation S under the U.S.

Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable

state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a

solicitation of an offer to buy of any of GoGold's securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities

legislation. All statements other than statements of historical fact, included in this release, including, without

limitation, statements regarding the Parral tailings project, the Los Ricos project, future operating margins, future

production and processing, and future plans and objectives of GoGold, constitute forward looking information

that involve various risks and uncertainties. Forward-looking information is based on a number of factors and

assumptions which have been used to develop such information but which may prove to be incorrect, including,

but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going

concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates,

and the performance of the Parral project There can be no assurance that such information will prove to be

accurate and actual results and future events could differ materially from those anticipated in such forward-

looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include

exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral

resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic

conditions. For additional information with respect to risk factors applicable to GoGold, reference should be

made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including,

but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release

is made as of the date of this release.

SOURCE

GoGold Resources Inc.

View original content:

http://www.newswire.ca/en/releases/archive/March2020/10/c4417.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:

[email protected]

CO: GoGold Resources Inc.

CNW 08:30e 10-MAR-20