Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Intersects 18.8m Near Surface of 255 g/t Silver Equivalent at Los Ricos South Project

Drill Results

GoGold Intersects 18.8m Near Surface of 255 g/t

Silver Equivalent at Los Ricos South Project

Shares Outstanding: 222,025,246

Trading Symbols: TSX: GGD

OTCQX: GLGDF

HALIFAX

,

March 24, 2020

/CNW/ -

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF)

("GoGold", "the Company")

is pleased to release the assay results from 8 diamond drill holes at the

Los Ricos South Project in the Company's Los Ricos district project, including three at

San Juan

and five

in the Main area.

Hole LRGG-20-117 was drilled on Section 425N in the Main area of the project and intersected the Los

Ricos quartz vein from 3.0 to

21.8m

. The vein averaged 255 g/t silver equivalent or 3.39 g/t gold

equivalent, made up of 129 g/t silver and 1.68 g/t gold over 18.8 metres.

"Drilling continues at Los Ricos with 6 drill rigs as we accelerate the drilling required for our initial

resource. At the Los Ricos North Project we continue with the groundwork preparing for an upcoming drill

campaign, which we anticipate commencing after the Easter break," said

Brad Langille

, President and

CEO. "We continue to monitor the COVID-19 developments in

Mexico

and have implemented additional

safety procedures at both Los Ricos and Parral as described in PR#11 dated

March 18, 2020

."

Hole LRGG-20-115 was drilled in the Main area of the project on section 400N and intersected

19.5m

of

199 g/t silver equivalent or 2.65 g/t gold equivalent from 4.5 to

24.0m

, consisting of 153 g/t silver and

0.61 g/t gold. Also included in the intersection was

9.6m

of 370 g/t silver equivalent and 4.93 g/t gold

equivalent.

Hole LRGG-20-119 was drilled in the Main area of the project on section 450N and intersected

26.4m

at

surface of 203 g/t silver equivalent or 2.71 g/t gold equivalent, consisting of 135 g/t silver and 0.91 g/t

gold. Also included in the intersection was

12.6m

of 316 g/t silver equivalent and 4.21 g/t gold equivalent.

Hole LRGG-20-114 became stuck in the hanging wall in section 100N of the Main area and was therefore

abandoned.

Detailed intersections are listed in Table 1, and the hole locations are shown in Table 2.

A longitudinal section summary of all the holes drilled at Los Ricos to date is available at

https://gogoldresources.com/component/rsfiles/preview?path=diagrams/LosRicos_LongSec_20200324.pdf

Table 1: Drill Hole Intersections

Hole ID

Area

Section

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGG-20-112

San Juan

775N

130.9

136.3

5.3

0.19

39.9

0.73

54.5

and

144.1

153.8

9.8

0.33

52.7

1.03

77.4

LRGG-20-113

Main

75N

4.0

21.3

17.3

0.47

54.7

1.20

90.1

LRGG-20-114

Main

100N

Abandoned in Hanging Wall above Los Ricos Vein

LRGG-20-115

Main

400N

4.5

24.0

19.5

0.61

152.8

2.65

198.7

including

4.5

14.1

9.6

1.17

281.3

4.93

369.5

LRGG-20-116

San Juan

775N

26.0

36.6

10.6

0.37

52.6

1.07

80.2

LRGG-20-117

Main

425N

3.0

21.8

18.8

1.68

128.5

3.39

254.5

LRGG-20-118

San Juan

700N

97.0

116.8

19.8

0.38

58.2

1.16

86.9

including

107.6

110.3

2.7

1.66

142.1

3.56

266.7

LRGG-20-119

Main

450N

0.0

26.4

26.4

0.91

135.0

2.71

203.2

including

8.4

21.0

12.6

1.60

196.0

4.21

315.7

1.

Not true width

2.

AuEq and AqEq converted using a silver to gold ratio of 75:1

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGG-20-112

610210

2327887

1248

50

-65

183.0

LRGG-20-113

610866

2327502

1278

50

-20

42.0

LRGG-20-114

610828

2327523

1259

50

-20

15.0

LRGG-20-115

610828

2327523

1259

50

-20

40.5

LRGG-20-116

610333

2327989

1290

50

-45

63.0

LRGG-20-117

610598

2327754

1290

50

-20

49.5

LRGG-20-118

610322

2327882

1273

50

-45

130.5

LRGG-20-119

610582

2327773

1303

50

-20

60.0

Los Ricos Exploration Projects

The Company is undertaking two drilling and exploration projects at its Los Ricos property located in

Jalisco

state, Mexico. The South Project began in

March 2019

and includes the 'Main' area, which is

focused on drilling around a number of historical mines including

El Abra

, El Troce,

San Juan

, and

Rascadero. The South Project also includes the

Cerro Colorado

and Las Lamas targets. The North

Project was launched this month and includes the Monte del Favor, Salomon, La Trini, and Mololoa

targets.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When

the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of

the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for

storage and/or for metallurgical test work.

The sealed and tagged sample bags are transported to the ActLabs facility in

Zacatecas, Mexico

.

ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler

150 mesh (106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50)

and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50).

Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over

limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-

GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples

and includes the systematic insertion and monitoring of appropriate reference materials (certified

standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC

material included in each batch are tracked to ensure the integrity of the assay data. All results stated in

this announcement have passed GoGold's QA/QC protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is

responsible for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,

developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral

Tailings project in the

state of Chihuahua

and has the Los Ricos exploration project in the state of

Jalisco

.

Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects. For more

information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States

Securities Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not

be offered or sold within

the United States

or to, or for the benefit of, U.S. persons (as defined in

Regulation S under the U.S. Securities Act) except in compliance with the registration requirements of the

U.S. Securities Act and applicable state securities laws or pursuant to exemptions therefrom. This release

does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's securities in

the

United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities

legislation. All statements other than statements of historical fact, included in this release, including,

without limitation, statements regarding the Parral tailings project, the Los Ricos project, future operating

margins, future production and processing, and future plans and objectives of GoGold, constitute forward

looking information that involve various risks and uncertainties. Forward-looking information is based on a

number of factors and assumptions which have been used to develop such information but which may

prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of

GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices,

the accuracy of mineral resource estimates, and the performance of the Parral project There can be no

assurance that such information will prove to be accurate and actual results and future events could differ

materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include

exploration and development risks associated with GoGold's projects, the failure to establish estimated

mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and

global economic conditions. For additional information with respect to risk factors applicable to GoGold,

reference should be made to GoGold's continuous disclosure materials filed from time to time with

securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking

information contained in this release is made as of the date of this release.

SOURCE

GoGold Resources Inc.

View original content:

http://www.newswire.ca/en/releases/archive/March2020/24/c4773.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:

[email protected]

CO: GoGold Resources Inc.

CNW 08:30e 24-MAR-20