Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Intersects 17.3m at 317 g/t Silver Equivalent at Los Ricos South Project

Drill Results

GoGold Intersects 17.3m at 317 g/t Silver Equivalent

at Los Ricos South Project

Shares Outstanding: 221,943,996

Trading Symbols: TSX: GGD

OTCQX: GLGDF

HALIFAX

,

Feb. 26, 2020

/CNW/ -

GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) ("GoGold", "the

Company")

is pleased to release the assay results from 9 diamond drill holes at the South Project in the

Company's Los Ricos district project. Diamond drilling resumed on

January 12, 2020

and a fifth drill has been

added to the program. Three drills are testing the Los Ricos vein north of the historical stopes and two drills are

completing a series of short holes along the el Abra outcrop.

Hole LRGG-20-100 was drilled on Section 275N and intersected the up-dip extension of Los Ricos quartz vein

from 9.9 to

29.1m

. The vein consisted of white quartz with pyrite boxwork and black sulphide minerals and

averaged 4.23 g/t gold equivalent or 317.2 g/t silver equivalent, made up of 1.51 g/t gold and 204.3 g/t silver

over 17.3 metres and included 6.9 metres of 6.56 g/t gold equivalent or 492 g/t silver equivalent.

Hole LRGG-20-98 encountered a

7.5m

historical working with the hanging portion of the vein showing 4.0

metres of 452 g/t silver equivalent, made up of 1.78 g/t gold and 319 g/t silver.

"We are drilling these short holes in order to obtain assay information on the upper

100m

portion of the Los

Ricos vein that forms the face of the el Abra hill. This part of the deposit has not been drilled in the past and is

essential to complete these drill holes for estimating the resource," said

Brad Langille

, President and CEO. "We

are also very excited to drill below hole 88 (intercepted 647 g/t silver equivalent for

18.9m

, see press release

#03 dated

January 22, 2020

) to further test the down dip extensions."

Hole LRGG-19-092 was drilled on Section 650N and intersected the Los Ricos quartz vein from 147 to

166m

and averaged 2.78 g/t gold equivalent or 208.4 g/t silver equivalent, made up of 1.27 g/t gold and 113.4 g/t

silver over 19.0 metres. A higher-grade section of the interval averaged 7.38 g/t gold equivalent or 554 g/t silver

equivalent over

6.5m

. No historical workings were encountered in this hole.

Detailed intersections are listed in Table 1, and the hole locations are shown in Table 2.

A longitudinal section summary of all the holes drilled at Los Ricos to date is available at

https://gogoldresources.com/component/rsfiles/preview?path=diagrams%252FLosRicos_LongSec_20200226.pdf

Table 1: Drill Hole Intersections

Hole ID

Area

Section

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGG-19-092

M ain

650N

147.0

166.0

19.0

1.27

113.4

2.78

208.4

including

147.0

159.2

12.2

1.94

172.6

4.25

318.4

including

149.0

155.5

6.5

3.39

299.2

7.38

553.7

LRGG-20-093

M ain

600N

36.7

45.5

8.8

0.41

75.7

1.42

106.6

LRGG-20-094

M ain

500N

61.5

65.4

3.8

0.66

173.9

2.97

223.1

LRGG-20-095

M ain

500N

30.9

48.0

17.1

0.61

121.4

2.23

167.1

including

34.1

41.3

7.2

1.20

207.5

3.97

297.6

LRGG-20-096

M ain

400N

30.9

47.5

16.6

1.40

62.8

2.24

167.9

LRGG-20-097

M ain

375N

72.4

78.9

6.4

0.23

81.2

1.31

98.6

LRGG-20-098

M ain

3

425N

62.0

66.0

4.0

1.78

318.6

6.03

452.2

and

79.0

93.5

14.5

0.12

31.1

0.53

39.9

LRGG-20-099

M ain

750N

53.4

72.7

19.4

0.49

68.1

1.39

104.5

including

54.5

60.8

6.3

1.08

108.8

2.53

190.1

LRGG-20-100

M ain

4

275N

9.9

29.1

17.3

1.51

204.3

4.23

317.2

including

11.1

18.0

6.9

2.92

272.7

6.56

492.1

1.

Not true width

2.

AuEq and AqEq converted using a silver to gold ratio of 75:1

3.

Hanging portion of vein above a 7.5m wide mined void

4.

Excludes 1.9m of historically mined void

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGG-19-092

610304

2327801

1440

50

-65

201.0

LRGG-20-093

610459

2327873

1304

50

-45

57.0

LRGG-20-094

610515

2327784

1297

50

-45

120.0

LRGG-20-095

610537

2327806

1312

50

-45

90.0

LRGG-20-096

610592

2327724

1281

50

-45

70.5

LRGG-20-097

610585

2327678

1283

50

-45

115.5

LRGG-20-098

610554

2327717

1294

50

-45

120.0

LRGG-20-099

610301

2327962

1281

50

-45

99.0

LRGG-20-100

610695

2327640

1267

50

-20

57.0

The Company is undertaking two drilling and exploration projects at its Los Ricos property located in

Jalisco

state, Mexico. The South Project began in

March 2019

and includes the 'Main' area, which is focused on drilling

around a number of historical mines including

El Abra

, El Troce,

San Juan

, and Rascadero. The South Project

also includes the

Cerro Colorado

and Las Lamas targets. The North Project was launched this month and

includes the Monte del Favor, Salomon, La Trini, and Mololoa targets.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the

sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core

being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or

for metallurgical test work.

The sealed and tagged sample bags are transported to the ActLabs facility in

Zacatecas, Mexico

. ActLabs

crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh

(106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits

greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-

element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100

grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and

includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks

and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each

batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed

GoGold's QA/QC protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible

for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,

developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings

project in the

state of Chihuahua

and has the Los Ricos exploration project in the state of

Jalisco

.

Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects. For more

information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act

of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold

within

the United States

or to, or for the benefit of, U.S. persons (as defined in Regulation S under the U.S.

Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable

state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a

solicitation of an offer to buy of any of GoGold's securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities

legislation. All statements other than statements of historical fact, included in this release, including, without

limitation, statements regarding the Parral tailings project, the Los Ricos project, future operating margins, future

production and processing, and future plans and objectives of GoGold, constitute forward looking information

that involve various risks and uncertainties. Forward-looking information is based on a number of factors and

assumptions which have been used to develop such information but which may prove to be incorrect, including,

but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going

concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates,

and the performance of the Parral project There can be no assurance that such information will prove to be

accurate and actual results and future events could differ materially from those anticipated in such forward-

looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include

exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral

resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic

conditions. For additional information with respect to risk factors applicable to GoGold, reference should be

made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including,

but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release

is made as of the date of this release.

SOURCE

GoGold Resources Inc.

View original content:

http://www.newswire.ca/en/releases/archive/February2020/26/c5717.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:

[email protected]

CO: GoGold Resources Inc.

CNW 08:30e 26-FEB-20