GoGold Intersects 11.2m of 625 g/t Silver Equivalent and 3.0m of 1,271 g/t Silver Equivalent
GoGold Intersects 11.2m of 625 g/t Silver
Equivalent and 3.0m of 1,271 g/t Silver Equivalent
Shares Outstanding: 222,106,496
Trading Symbols: TSX: GGD
OTCQX: GLGDF
HALIFAX
,
April 22, 2020
/CNW/ -
GoGold Resources Inc. (TSX: GGD) (OTCQX: GLGDF) ("GoGold",
"the Company")
is pleased to release the assay results from 12 diamond drill holes that continue to
increase the potential size of the Los Ricos South Project in the Company's Los Ricos district.
Hole LRGG-20-136 was drilled on section 400N in the Main area of the project and intersected the Los
Ricos quartz vein from 162.6 to
173.8m
. The
11.2m
intersection averaged 625 g/t silver equivalent, which
consisted of 358 g/t silver and 3.56 g/t gold.
"As additional assays come in from our exploration program at Los Ricos South, we continue to be
pleased with the results. Hole 132 includes one of our widest intercepts, at close to 50 metres, while also
showing a very high-grade core of 3 metres of 1,270 g/t silver equivalent," said
Brad Langille
, President
and CEO. "We also have strong results near surface from hole 135, and good results from others
including 133 and 137 which we believe will help to increase the number of silver equivalent ounces in our
future resource."
Hole LRGG-20-132 was drilled on section 625N in the Main area and intersected
49.4m
, from 321.9 to
371.2m
, of 111 g/t silver equivalent, consisting of 80.3 g/t silver and 0.41 g/t gold. The intersection
included
3.0m
of 1,271 g/t silver equivalent.
Hole LRGG-20-135 was drilled on section 500N in the Main area of the project and intersected
22.6m
at
surface averaging 212 g/t silver equivalent, made up of 133 g/t silver and 1.06 g/t gold. The intersection
included
11.3m
of 297 g/t silver equivalent.
Detailed intersections are listed in Table 1, and the hole locations are shown in Table 2.
A longitudinal section summary of all the holes drilled at Los Ricos to date is available at
https://gogoldresources.com/component/rsfiles/preview?path=diagrams/LosRicos_LongSec_20200422.pdf
Table 1: Drill Hole Intersections
Hole ID
Area
Section
From
To
Length
1
Au
Ag
AuEq
2
AgEq
2
(m)
(m)
(m)
(g/t)
(g/t)
(g/t)
(g/t)
LRGG-20-130
Main
575N
Abandoned in hanging wall above Los Ricos Vein due to fault
LRGG-20-131
Main
500N
Abandoned due to excessive hole deviation
LRGG-20-132
Main
625N
321.9
371.2
49.4
0.41
80.3
1.48
111.0
including
340.4
343.4
3.0
5.42
864.8
16.95
1,270.9
LRGG-20-133
Main
3
500N
230.6
270.0
36.4
0.36
81.6
1.45
108.7
including
240.0
247.5
7.5
1.15
202.5
3.85
288.4
LRGG-20-134
San Juan
775N
0.0
14.5
14.5
0.30
51.2
0.99
73.9
LRGG-20-135
Main
4
500N
0.0
25.6
22.6
1.06
132.6
2.82
211.8
including
12.0
23.3
11.3
1.29
200.1
3.96
296.6
LRGG-20-136
Main
400N
162.6
173.8
11.2
3.56
358.4
8.34
625.2
LRGG-20-137
Main
525N
34.25
48.15
13.9
0.91
185.2
3.38
253.6
LRGG-20-138
Main
5
525N
211.9
223.9
9.0
0.13
67.8
1.03
77.5
LRGG-20-139
Main
6
725N
13.5
36.1
21.6
0.20
82.0
1.29
96.9
LRGG-20-140
Main
175N
176.9
198.4
21.5
0.12
25.0
0.45
34.0
LRGG-20-141
Main
525N
222.5
231.0
8.5
0.34
58.9
1.12
84.1
1
.
Not true width
2
.
AuEq and AgEq converted using a silver to gold ratio of 75:1
3
.
Excluding 3.0m of open stopes from historical underground workings.
4
.
Excluding 3.0m of open stopes from historical underground workings.
5
.
Excluding 3.0m of open stopes from historical underground workings.
6
.
Excluding 1.0m of open stopes from historical underground workings.
Table 2: Drill Hole Locations
Hole ID
Easting
Northing
Elevation
Azimuth
Dip
Length
LRGG-20-130
610235
2327646
1226
50
-65
249.0
LRGG-20-131
610699
2327950
1478
230
-41
217.5
LRGG-20-132
610216
2327695
1224
50
-75
391.0
LRGG-20-133
610699
2327937
1478
230
-45
270.0
LRGG-20-134
610361
2328012
1302
50
-20
30.0
LRGG-20-135
610540
2327804
1311
50
-20
72.0
LRGG-20-136
610471
2327615
1278
50
-50
230.3
LRGG-20-137
610519
2327818
1309
50
-20
67.5
LRGG-20-138
610378
2327688
1260
50
-70
260.4
LRGG-20-139
610384
2327966
1303
50
-20
42.0
LRGG-20-140
610660
2327480
1241
50
-65
202.9
LRGG-20-141
610675
2327950
1474
230
-45
235.5
Los Ricos Exploration Projects
Drilling at the Los Ricos projects is temporarily suspended due to COVID-19 to ensure the safety of the
Company's employees, contractors, and surrounding communities, in compliance with the Mexican
Federal government's mandate that all non-essential business temporarily suspend activities. The
Company continues to receive assaying results on drill holes completed previous to the suspension of
drilling, which are in the assaying process.
The Company's two exploration projects at its Los Ricos property are in
Jalisco
state, Mexico. The South
Project began in
March 2019
and includes the 'Main' area, which is focused on drilling around a number of
historical mines including
El Abra
, El Troce,
San Juan
, and Rascadero. The South Project also includes
the
Cerro Colorado
and Las Lamas targets. The North Project was launched in
March 2020
and includes
the Monte del Favor, Salomon, La Trini, and Mololoa targets.
Procedure, Quality Assurance / Quality Control and Data Verification
The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When
the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of
the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for
storage and/or for metallurgical test work.
The sealed and tagged sample bags are transported to the ActLabs facility in
Zacatecas, Mexico
.
ActLabs crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler
150 mesh (106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50)
and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50).
Silver and multi-element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over
limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-
GRAV Ag).
Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples
and includes the systematic insertion and monitoring of appropriate reference materials (certified
standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC
material included in each batch are tracked to ensure the integrity of the assay data. All results stated in
this announcement have passed GoGold's QA/QC protocols.
Mr.
David Duncan
, P. Geo. is the qualified person as defined by National Instrument 43-101 and is
responsible for the technical information of this release.
About GoGold Resources
GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,
developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral
Tailings project in the
state of Chihuahua
and has the Los Ricos exploration project in the state of
Jalisco
.
Headquartered in
Halifax, NS
, GoGold is building a portfolio of low cost, high margin projects. For more
information visit
gogoldresources.com
.
CAUTIONARY STATEMENT:
The securities described herein have not been, and will not be, registered under the United States
Securities Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not
be offered or sold within
the United States
or to, or for the benefit of, U.S. persons (as defined in
Regulation S under the U.S. Securities Act) except in compliance with the registration requirements of the
U.S. Securities Act and applicable state securities laws or pursuant to exemptions therefrom. This release
does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's securities in
the
United States
.
This news release may contain "forward-looking information" as defined in applicable Canadian securities
legislation. All statements other than statements of historical fact, included in this release, including,
without limitation, statements regarding the Parral tailings project, the Los Ricos project, future operating
margins, future production and processing, and future plans and objectives of GoGold, constitute forward
looking information that involve various risks and uncertainties. Forward-looking information is based on a
number of factors and assumptions which have been used to develop such information but which may
prove to be incorrect, including, but not limited to, assumptions in connection with the continuance of
GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices,
the accuracy of mineral resource estimates, and the performance of the Parral project There can be no
assurance that such information will prove to be accurate and actual results and future events could differ
materially from those anticipated in such forward-looking information.
Important factors that could cause actual results to differ materially from GoGold's expectations include
exploration and development risks associated with GoGold's projects, the failure to establish estimated
mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and
global economic conditions. For additional information with respect to risk factors applicable to GoGold,
reference should be made to GoGold's continuous disclosure materials filed from time to time with
securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking
information contained in this release is made as of the date of this release.
SOURCE
GoGold Resources Inc.
View original content:
http://www.newswire.ca/en/releases/archive/April2020/22/c1784.html
%SEDAR: 00029249E
For further information:
Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:
CO: GoGold Resources Inc.
CNW 08:30e 22-APR-20