Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Announces Strong Near-Mine Drilling Results at Los Ricos South 3,034 g/t AgEq over 21.3m including 1.4m of 41,110 g/t AgEq from the Eagle Zone

Drill Results

GoGold Announces Strong Near-Mine Drilling

Results at Los Ricos South

3,034 g/t AgEq over 21.3m including 1.4m of 41,110 g/t AgEq

from the Eagle Zone

Halifax, Nova Scotia--(Newsfile Corp. - September 9, 2025) -

GoGold Resources Inc. (TSX: GGD)

(OTCQX: GLGDF) ("GoGold", "the Company")

is pleased to announce first assay results have been

received from its near-mine 2025 exploration program conducted on the Eagle and Abra (Main) Zones

of the Silver-gold Los Ricos South Project located in Jalisco, Mexico. Drill targeting was based on

reconstruction of the historical Cinco Minas Mine and a new IP geophysics survey conducted this year.

Assay results from geotechnical holes in the Eagle Zone are also discussed.

"We're pleased with these initial results of our near-mine exploration program.

The objective was to drill

some scouting exploration holes deeper than our current Resource and south of the current Resource in

a faulted off section of the vein.

We were successful in hole 318 as it demonstrated strong mineralization

continues deeper below our current Resources.

Also, a highlight of the drilling was hole 324 which not

only located the faulted off section of the vein outside of the Resource but yielded strong gold and silver

grades and widths.

Another significant hole is hole 337, located in Cerro Colorado which is south of

known mineralization and could represent a new ore shoot which we will target with further drilling," said

Brad Langille, President and CEO.

"Hole LRSGT-23-001 was drilled for geotechnical purposes within

the current Resource area, but after publication.

This is confirmatory of the high grade and large widths

of the Eagle Zone."

Highlights from the drilling program include the following:

Hole LRSGT-23-001

:

41,110 g/t total silver equivalent over 1.42 m from 131.20 to 132.62 m,

consisting of 28,094 g/t silver and 173.6 g/t gold within a longer interval of 21.25 m grading 3,034

g/t total silver equivalent from 129.15 to 150.40 m consisting of 2,077 g/t silver and 12.76 g/t gold

drilled in the

Eagle Zone

for geotechnical purposes after the Resource was published and is

within the current Resource area (see Figures 1 and 4).

Hole LRGG-24-318

:

904 g/t total silver equivalent over 0.75 m from 698.10 to 698.85 m,

consisting of 401 g/t silver and 6.7 g/t gold within a longer interval of 10.72 m grading 215 g/t total

silver equivalent from 691.18 to 701.90 m consisting of 123 g/t silver and 1.2 g/t gold in the

Abra

Zone

for exploration purposes outside of the current Resource area (see Figures 1 and 3).

Hole LRGG-24-324

: 1,034 g/t total silver equivalent over 1.39 m from 231.50 to 232.89 m,

consisting of 477 g/t silver and 7.4 g/t gold within a longer interval of 23.05 m grading 234 g/t total

silver equivalent from 227.10 to 250.15 m consisting of 123 g/t silver and 1.49 g/t gold in the

South Abra Zone

for exploration purposes outside of the current Resource area (see Figures 1

and 3).

Hole LRGG-24-337

: 849 g/t total silver equivalent over 1.50 m from 33.50 to 35.00 m, consisting

of 43.8 g/t silver and 10.7 g/t gold within a longer interval of 9.45 m grading 303 g/t total silver

equivalent from 27.55 to 37.00 m consisting of 21.7 g/t silver and 3.75 g/t gold in the

Cerro

Colorado Zone

for exploration purposes outside of the current Resource area (see Figures 1 and

3).

Table 1: Drill Hole Results

Hole ID

Area / Vein

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGG-24-318

Los Ricos Vein

691.18

701.90

10.72

1.234

122.7

2.87

215.2

including

698.10

698.85

0.75

6.700

401.0

12.05

903.5

LRGG-25-321

Los Ricos Vein

222.50

234.00

11.50

0.640

78.8

1.69

126.8

including

222.50

227.60

5.10

0.893

80.1

1.96

147.0

LRGG-25-322

Los Ricos Vein

310.66

318.00

7.34

0.202

130.1

1.94

145.3

including

313.50

318.00

4.50

0.258

182.5

2.69

201.9

LRGG-25-324

Los Ricos Vein

227.10

250.15

23.05

1.491

122.6

3.13

234.4

including

231.50

232.89

1.39

7.417

477.4

13.78

1,033.7

LRGG-25-325

Los Ricos Vein

237.50

238.50

1.00

0.440

97.0

1.73

130.0

LRGG-25-327

Los Ricos Vein

452.00

495.45

43.45

0.218

54.0

0.94

70.4

including

469.65

470.65

1.00

0.025

656.0

8.77

657.9

LRGG-25-328

Los Ricos Vein

235.00

257.04

22.04

0.181

41.9

0.74

55.5

including

256.50

257.04

0.54

1.940

346.0

6.55

491.5

LRGG-25-330

Los Ricos Vein

314.65

315.15

0.50

0.460

206.0

3.21

240.5

LRGG-25-333

Los Ricos Vein

183.30

185.40

2.10

0.832

36.9

1.32

99.3

LRGG-25-334

Los Ricos Vein

230.50

231.65

1.15

1.061

48.4

1.71

127.9

and

241.70

242.70

1.00

1.344

236.4

4.50

337.2

LRGG-25-335

Los Lamas

Vein

251.20

252.15

0.95

1.850

137.0

3.68

275.8

and

262.70

267.25

4.55

0.395

71.0

1.34

100.6

LRGG-25-336

Cerro Col. Vein

12.30

23.61

11.31

0.814

20.9

1.09

82.0

including

17.10

22.58

5.48

0.950

26.5

1.30

97.7

LRGG-25-337

Cerro Col. Vein

27.55

37.00

9.45

3.754

21.7

4.04

303.3

including

33.50

35.00

1.50

10.740

43.8

11.32

849.3

LRGG-25-339

Cerro Col. Vein

4.15

6.40

2.25

0.723

49.0

1.38

103.2

The following holes are geotechnical holes drilled after Resource was published, and are within current Resource area:

LRSGT-23-001

Los Ricos Vein

129.15

150.40

21.25

12.76

2,077.0

40.46

3,034.2

including

131.20

132.62

1.42

173.55

28,094.0

548.14

41,110.2

GT-PFS-23-001

Los Ricos Vein

133.85

139.00

5.15

0.71

173.9

3.03

227.1

including

134.90

136.28

1.38

1.86

334.4

6.32

474.0

GT-PFS-23-003

Los Ricos

Vein

6

120.68

146.67

25.99

0.86

89.1

2.05

153.5

including

6

122.95

130.50

7.55

3.09

286.0

6.90

517.8

including

6

122.95

129.59

6.64

3.27

313.0

7.45

558.5

GT-PFS-23-004

Los Ricos Vein

60.00

92.10

32.10

3.18

292.1

7.08

531.0

including

64.00

65.60

1.60

20.11

2,792.5

57.35

4,300.9

GT-PFS-23-005

Los Ricos

Vein

6

66.30

93.60

27.30

0.36

45.8

0.97

72.8

including

6

75.00

80.60

5.60

0.94

77.1

1.97

147.7

GT-PFS-23-

OP4

Los Ricos

Vein

6

101.15

115.40

11.80

2.62

289.1

6.48

485.8

including

6

106.25

115.40

6.70

4.60

489.9

11.13

834.5

GT-PFS-23-

OP5

Los Ricos Vein

40.00

54.90

14.90

0.37

58.9

1.16

87.0

Including

46.20

47.20

1.00

1.09

170.0

3.36

251.8

GT-PFS-23-005

Los Ricos

Vein

6

66.30

93.60

27.30

0.36

45.8

0.97

72.8

including

46.20

47.20

1.00

1.09

170.0

3.36

251.8

1. Not true width.

2. Silver Equivalent ("AgEq") ratios are based on a silver to gold price ratio of 75:1 (Au:Ag) at 100% metal recoveries.

3. Holes LRGG-25-319, 320, 323, 326, 329, 329, 331, 332, 338 did not intercept material mineralization and are excluded.

4. Hole GT-PFS-23-002 intercepted strong mineralization but was drilled along vein for geotechnical purposes and is excluded from the results

above.

5. Holes GT-PFS-23-006, 007, 008, 009, 010, 011 and GT-PFS-23-OP1, OP2, OP3 were drilled for geotechnical purposes and were not sampled.

6. Excluding voids.

Summary

In early 2025, the exploration team began a new IP survey to extend the coverage south of the El Abra

deposit to the Cerro Colorado deposit (see Figure 2).

The new data, combined with the 2022 IP survey,

provides continuous detailed information along the El Abra structure over a strike length of 7km. Based

on a re-evaluation of historical data and the new IP geophysics, a systematic step-out drilling program to

test the down dip, the southern strike extension of the Abra Zone towards Los Lamas, and the Cerro

Colorado deposit was started in January 2025.

The goal of this drilling is to extend the known mineral occurrence at the south end of the historically

mined Cinco Minas one kilometer to the Los Llamas Zone all the way to the south at Cerro Colorado, a

total strike length of 3.5km. The drill holes in this release were not included in the initial Mineral Resource

Estimate ("MRE") for Los Ricos South released on January 6, 2025.

Figure 1: 2025 Exploration Drilling - Los Ricos Plan View

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1683/265564_3f2cf4ad74ba2a00_001full.jpg

Figure 2: 2025 IP Survey - Plan View

Induced polarization is industry standard in exploring for low sulfidation epithermal deposits, and

particularly resistivity shows a pronounced break between the El Pochete and Eje Volcanics, the known

host of the Los Ricos Vein System. This break can be traced for a total of 7km from the north of Eagle to

the far south of Cerro Colorado.

Figure 2: 2025 IP Survey - Plan View

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1683/265564_3f2cf4ad74ba2a00_002full.jpg

This prospective break, along with a refreshed look at historical mining records, show the area to be

prospective to the south of the Abra Zone and down dip of the current FS designed stopes.

Figure 3: Longitudinal Section - Near Mine Drilling

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1683/265564_3f2cf4ad74ba2a00_003full.jpg

Assay results from drill hole LRGG-24-318 show the high grade Abra Zone extends 250m down dip of

the deepest Feasibility Study designed stopes, offering excellent expansion potential. Whereas, assay

results from LRGG-25-324 show an extension of the Abra Zone 150m south of the last historical mining

activity. There remains over 500m of prospective ground untested between DDH 324 and the Los

Llamas Zone, believed to be a continuation of the Abra Zone.

Geotechnical Drilling

Based on the recommendations from WSP (retained for the 2024 Feasibility Study) the Company

completed additional geotechnical drill holes for the proposed Open Pit and Underground Mine Plans.

Holes were completed either, 1) crossing the zone, 2) entirely in FW, 3) entirely in HW or 4) drilled down

the vein/HW (e.g., GT_PFS_23_002). Only holes that crossed the Zone were sampled. Geotechnical

holes were used for both Resource Definition and geotechnical purposes and confirm the presence of

the high-grade Abra and Eagle Zones. These drill holes were not utilized in the updated MRE dated

January 16, 2025.

Figure 4: Cross Section - Geotechnical Drilling for Resource

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/1683/265564_3f2cf4ad74ba2a00_004full.jpg

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Length

Azimuth

Dip

Type

LRSGT-23-001

609992

2328411

1260

257

50

-45

Geotechnical

GT-PFS-23-OP1

610528

2327672

1282

170

245

-50

Geotechnical

GT-PFS-23-OP2

610828

2327753

1423

150

45

-70

Geotechnical

GT-PFS-23-OP3

610666

2327951

1472

151

45

-70

Geotechnical

GT-PFS-23-OP4

610292

2328052

1308

115

310

-60

Geotechnical

GT-PFS-23-OP5

610339

2328166

1349

101

45

-70

Geotechnical

GT_PFS_23_001

610528

2327676

1283

252

90

-65

Geotechnical

GT_PFS_23_002

610775

2327544

1259

201

30

-80

Geotechnical

GT_PFS_23_003

610439

2327744

1274

250

65

-65

Geotechnical

GT_PFS_23_004

610321

2327972

1288

220

30

-80

Geotechnical

GT_PFS_23_005

610386

2327909

1294

151

65

-65

Geotechnical

GT_PFS_23_006

610665

2327949

1471

442

240

-55

Geotechnical

GT_PFS_23_007

610828

2327753

1423

421

230

-60

Geotechnical

GT_PFS_23_008

610188

2328372

1313

251

310

-70

Geotechnical

GT_PFS_23_009

610253

2328508

1384

351

250

-70

Geotechnical

GT_PFS_23_010

610089

2328587

1298

248

210

-50

Geotechnical

GT_PFS_23_011

610747

2327839

1455

452

240

-70

Geotechnical

LRGG-24-318

609926

2327320

1253

785

50

-55

Exploration

LRGG-25-319

610865

2327392

1235

123

50

-50

Exploration

LRGG-25-320

610782

2327286

1212

220

50

-50

Exploration

LRGG-25-321

610706

2327215

1151

342

50

-50

Exploration

LRGG-25-322

610653

2327186

1150

389

50

-50

Exploration

LRGG-25-323

610707

2327220

1152

373

50

-50

Exploration

LRGG-25-324

610735

2327183

1152

390

50

-50

Exploration

LRGG-25-325

610666

2327251

1153

319

50

-50

Exploration

LRGG-25-326

610593

2327071

1149

597

50

-60

Exploration

LRGG-25-327

610449

2327355

1208

635

50

-80

Exploration

LRGG-25-328

610741

2327164

1151

387

50

-50

Exploration

LRGG-25-329

610742

2327123

1142

385

50

-45

Exploration

LRGG-25-330

610733

2327184

1153

361

50

-55

Exploration

LRGG-25-331

610732

2327183

1153

360

50

-59

Exploration

LRGG-25-332

610732

2327183

1153

430

50

-66

Exploration

LRGG-25-333

610733

2327184

1153

351

50

-46

Exploration

LRGG-25-334

611456

2326517

1096

361

50

-47

Exploration

LRGG-25-335

611456

2326516

1096

350

50

-60

Exploration

LRGG-25-336

612127

2326018

1041

71

50

-45

Exploration

LRGG-25-337

612118

2326012

1039

85

50

-82

Exploration

LRGG-25-338

612164

2325942

1018

66

50

-45

Exploration

LRGG-25-339

612182

2325970

1029

44

50

-45

Exploration

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When

the sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of

the core being bagged and tagged for assay. The remaining half portion is returned to the core trays for

storage and/or for metallurgical test work.

The sealed and tagged sample bags are transported to the ALS Chemex facility in Zacatecas, Mexico.

ALS Chemex crushes the samples and prepares 200-300 gram pulp samples with ninety percent

passing Tyler 150 mesh (106μm). The pulps are assayed for gold using a 30-gram charge by fire assay

(Code AA23) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish

(Code ME-GRAV21). Silver and multi-element analysis is completed using total digestion (Code ME-

ICP61 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a

gravimetric finish (ME-GRA21).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples

and includes the systematic insertion and monitoring of appropriate reference materials (certified

standards, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC

material included in each batch are tracked to ensure the integrity of the assay data. All results stated in

this announcement have passed GoGold's QA/QC protocols.

Qualified Person

David R. Duncan, P. Geo., V.P. Exploration of the Corporation, is the Qualified Person for GoGold as

defined under National Instrument 43-101.

Mr. Duncan has reviewed and approved the scientific and

technical information in this press release.

Los Ricos District Exploration Projects

The Company's two development projects at its Los Ricos Property are in Jalisco state, Mexico. The

Los Ricos South Project began in March 2019 and an initial Mineral Resource was announced on July

29, 2020, which disclosed a Measured & Indicated Mineral Resource of 63.7 million ounces AgEq

grading 199 g/t AgEq contained in 10.0 million tonnes, and an Inferred Mineral Resource of 19.9 million

ounces AgEq grading 190 g/t AgEq contained in 3.3 million tonnes. An initial PEA on the project was

announced on January 20, 2021, indicating an NPV5% of US$295M. On January 16, 2025, the company

announced a feasibility study which included a front-end engineering design which outlined an NPV5% of

US$355M.

The Los Ricos North Project was launched in March 2020 and an initial Mineral Resource was

announced on December 7, 2021, which disclosed an Indicated Mineral Resource of 87.8 million

ounces AgEq grading 122 g/t AgEq contained in 22.3 million tonnes, and an Inferred Mineral Resource

of 73.2 million ounces AgEq grading 111 g/t AgEq contained in 20.5 million tonnes. An initial PEA on

the project was announced on May 17, 2023, indicating an NPV5% of US$413M.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,

developing, exploring and acquiring high quality projects in Mexico.

The Company operates the Parral

Tailings mine in the state of Chihuahua and has the Los Ricos South and Los Ricos North exploration

and development projects in the state of Jalisco. Headquartered in Halifax, NS, GoGold is building a

portfolio of low cost, high margin projects. For more information visit

gogoldresources.com

.

For further information please contact:

Steve Low, Corporate Development

GoGold Resources Inc.

T: 416 855 0435

Email :

[email protected]

Or visit :

www.gogoldresources.com

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S.

Securities Act"), or any state securities laws, and may not be offered or sold within the United States or to, or for the benefit of, U.S. persons (as

defined in Regulation S under the U.S. Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and

applicable state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a solicitation of an offer to

buy of any of GoGold's securities in the United States.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than

statements of historical fact, included in this release, including, without limitation, statements regarding the Parral tailings project, the Los Ricos

project, future operating margins, future production and processing, and future plans and objectives of GoGold, constitute forward-looking

information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which have

been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the

continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral

resource estimates, and the performance of the Parral project There can be no assurance that such information will prove to be accurate and actual

results and future events could differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks

associated with the GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices,

variations of recovery rates, and global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference

should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's

Annual Information Form. The forward-looking information contained in this release is made as of the date of this release.

To view the source version of this press release, please visit