Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Announces Strong Drilling Results at El Favor 2,529 g/t AgEq over 0.7m within 13.9m of 294 g/t AgEq at El Favor

Drill Results

GoGold Announces Strong Drilling Results at El

Favor

2,529 g/t AgEq over

0.7m

within

13.9m

of 294 g/t AgEq at El Favor

HALIFAX, NS

,

Dec. 14, 2022

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX: GLGDF)

("GoGold",

"the Company")

is pleased to release the results of 9 drill holes from the El Favor East deposit within Los

Ricos North property. Hole LRGF-22-140 intersected

0.7m

of 2,529 g/t silver equivalent ("AgEq") contained

within

13.9m

of 294 g/t AgEq, and hole LRGF-22-137 intersected

61.5m

of 165 g/t AgEq containing

24.3m

of

350 g/t AgEq.

"We're pleased with the additional strong results coming from El Favor. This drilling in the western portion of the

deposit increases our confidence in this area, particularly when we see holes like LRGF-22-137," said

Brad

Langille

, President and CEO. "This will aide in our work in Los Ricos North towards publishing a preliminary

economic assessment on the project which we intend to complete in the first half of 2023."

Table 1: Drill Hole Intersections

Hole ID

Area / Vein

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGF-22-129

El Favor East

137.2

141.4

4.3

0.32

109.1

1.77

132.9

including

138.5

139.4

1.0

0.90

320.1

5.17

387.9

and

305.3

307.0

1.8

0.45

172.1

2.75

206.2

LRGF-22-131

El Favor

2.3

43.5

41.3

0.22

76.1

1.24

93.0

including

15.7

24.9

9.3

0.67

220.4

3.60

270.3

LRGF-22-132

El Favor East

79.8

84.0

4.2

0.39

138.2

2.23

167.3

including

79.8

80.6

0.8

1.66

635.5

10.13

759.8

and

92.5

95.8

3.3

0.70

168.1

2.94

220.3

LRGF-22-134

El Favor East

407.7

409.3

1.7

0.28

76.3

1.29

97.1

LRGF-22-137

El Favor - Salomon

9.8

75.5

61.5

0.29

142.8

2.20

164.7

including

39.0

67.5

24.3

0.66

300.1

4.66

349.8

including

46.3

47.0

0.7

1.71

881.0

13.46

1,009.4

LRGF-22-138

El Favor

24.7

28.6

4.0

0.30

75.3

1.30

97.5

LRGF-22-139

El Favor - Salomon

9.6

13.8

4.2

0.65

116.8

2.20

165.3

and

66.6

88.2

20.1

0.32

138.3

2.17

162.5

including

80.5

81.7

1.2

2.12

1,030.6

15.86

1,189.4

and

141.9

145.1

3.2

0.38

170.8

2.66

199.2

LRGF-22-140

El Favor East

53.3

55.8

2.5

1.39

139.2

3.24

243.1

and

189.3

203.1

13.9

0.48

257.4

3.92

293.8

including

198.5

201.6

3.2

1.84

960.5

14.65

1,098.8

including

199.2

199.8

0.7

2.96

2,306.9

33.72

2,529.0

LRGF-22-141

El Favor - Salomon

37.8

39.8

2.0

0.57

141.5

2.46

184.4

and

54.5

74.0

19.5

0.18

124.2

1.84

137.6

including

61.8

65.3

3.6

0.57

423.7

6.22

466.3

1. Not true width

2. AqEq converted using a silver to gold ratio of 75:1 at recoveries of 100%

3. Holes LRGF-22-135 is pending assays.

Figure 1: El Favor Drill Hole Locations (CNW Group/GoGold Resources Inc.)

In early 2022, the exploration team began a systematic stepout drilling program to test the eastern strike

extension of the El Favor deposit in the area between Discovery Hole 48 and the underground workings at the

Constancia Mine. This area is known as the El Favor East zone, and the mapping and drilling program has

extended the presence of mineralization

900m

to the east of hole 48 (El Favor East zone discovery hole), as

shown in Figure 1. To date, approximately

800m

of El Favor East has been drilled showing the strong

mineralization. The drill holes in this release were not included in the initial Mineral Resource Estimate for Los

Ricos North released on

December 7, 2021

, hole LRGF-21-094 was the final drill hole included in that resource.

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGF-22-129

586829

2336810

1236

180

-45

525

LRGF-22-131

585353

2336581

1286

180

-45

286

LRGF-22-132

586423

2336857

1319

180

-45

119

LRGF-22-134

587025

2336869

1241

180

-45

435

LRGF-22-137

585078

2336451

1287

180

-45

129

LRGF-22-138

585552

2336671

1248

180

-45

184

LRGF-22-139

585277

2336485

1357

180

-45

147

LRGF-22-140

586527

2336721

1356

180

-45

404

LRGF-22-141

585356

2336498

1325

180

-45

99

El Favor is located approximately 800 meters along strike to the east of the El Orito deposit. The combined

systems cover approximately 2.9km in mineralized strike length over a 3.7km distance. At El Orito, wide zones

of precious and base metal mineralization were cut by drill holes at El Orito at elevations between 600 to

900m

.

The drill holes at El Favor have cut primarily silver-gold mineralization with trace to minor amounts of base

metals at a higher elevation in the system, between

1,050m

to

1,400m

, compared to the semi-massive to

massive base metal sulphide mineralization seen deeper in the El Orito deposit.

Figure 2: Favor Long Section (CNW Group/GoGold Resources Inc.)

VRIFY Slide Deck and 3D Presentation

VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote

mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the

VRIFY iOS and Android apps.

The VRIFY 3D Slide Deck for GoGold can be viewed at:

https://vrify.com/companies/gogold-resources-inc

and

on the Company's website at:

www.gogoldresources.com

.

Los Ricos District Exploration Projects

The Company's two exploration projects at its Los Ricos Property are in

Jalisco

state,

Mexico

. The Los Ricos

South Project began in

March 2019

and an initial Mineral Resource was announced on

July 29, 2020

which

disclosed a Measured & Indicated Mineral Resource of 63.7 million ounces AgEq grading 199 g/t AgEq

contained in 10.0 million tonnes, and an Inferred Mineral Resource of 19.9 million ounces AgEq grading 190 g/t

AgEq contained in 3.3 million tonnes. An initial PEA on the project was announced on

January 20, 2021

indicating an NPV

5%

of

US$295M

. The Eagle Concession was acquired in

October 2022

and is adjacent to the

Main Area which contains the initial Mineral Resource.

The Los Ricos North Project was launched in

March 2020

and an initial Mineral Resource was announced on

December 7, 2021

, which disclosed an Indicated Mineral Resource of 87.8 million ounces AgEq grading 122 g/t

AgEq contained in 22.3 million tonnes, and an Inferred Mineral Resource of 73.2 million ounces AgEq grading

111 g/t AgEq contained in 20.5 million tonnes. The Company has a drill program for an additional 100,000

metres of drilling for 2022 in place.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the

sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core

being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage and/or

for metallurgical test work.

The sealed and tagged sample bags are transported to the ActLabs facility in

Zacatecas, Mexico

. ActLabs

crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh

(106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits

greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-

element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100

grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and

includes the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks

and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each

batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed

GoGold's QA/QC protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible

for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,

developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings

mine in the

state of Chihuahua

and has the Los Ricos South and Los Ricos North exploration projects in the

state of

Jalisco

. Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects.

For more information, visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act

of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold

within

the United States

or to, or for the benefit of, U.S. persons (as defined in Regulation S under the U.S.

Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable

state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a

solicitation of an offer to buy of any of GoGold's securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities

legislation. All statements other than statements of historical fact, included in this release, including, without

limitation, statements regarding the Los Ricos South and North projects, and future plans and objectives of

GoGold, including the intention to undertake further exploration at Los Ricos North, and the prospect of further

discoveries there, constitute forward looking information that involve various risks and uncertainties. Forward-

looking information is based on a number of factors and assumptions which have been used to develop such

information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the

continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions,

mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There

can be no assurance that such information will prove to be accurate and actual results and future events could

differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include

exploration and development risks associated with GoGold's projects, the failure to establish estimated mineral

resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic

conditions. For additional information with respect to risk factors applicable to GoGold, reference should be

made to GoGold's continuous disclosure materials filed from time to time with securities regulators, including,

but not limited to, GoGold's Annual Information Form. The forward-looking information contained in this release

is made as of the date of this release.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/gogold-announces-strong-drilling-results-at-el-favor-301702761.html

SOURCE

GoGold Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/December2022/14/c7771.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:

[email protected]

CO: GoGold Resources Inc.

CNW 06:30e 14-DEC-22