Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Announces More Strong Drilling Results at El Favor

Drill Results

GoGold Announces More Strong Drilling Results at El

Favor

Shares Outstanding: 296,097,011

Trading Symbols: TSX: GGD

OTCQX: GLGDF

4,209 g/t AgEq over

1.2m

within

19.9m

of 436 g/t AgEq at El Favor

HALIFAX, NS

,

Jan. 18, 2023

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX: GLGDF)

("GoGold", "the

Company")

is pleased to release the results of 8 drill holes from the El Favor East deposit within Los Ricos North

property. Hole LRGF-22-147 intersected

1.2m

of 4,209 g/t silver equivalent ("AgEq") contained within

19.9m

of 436

g/t AgEq.

"The holes which we have been drilling in El Favor, along with our large resource and the data which we've collected

over the last two years of drilling, will be invaluable when included with our upcoming preliminary economic analysis

("PEA") study," said

Brad Langille

, President and CEO. "We believe the investment we've made in Los Ricos North

will return tremendous value to our shareholders."

Table 1: Drill Hole Intersections

Hole ID

Area / Vein

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGF-22-142

El Favor

5.4

7.6

2.3

0.38

125.7

2.05

153.9

including

14.5

15.2

0.7

1.17

330.3

5.58

418.2

and

25.9

28.5

2.6

0.49

212.8

3.33

249.8

LRGF-22-143

El Favor

5.3

93.0

84.5

0.24

78.6

1.28

96.3

including

51.0

54.0

3.0

0.72

274.0

4.37

328.0

LRGF-22-144

El Favor East

239.6

284.4

44.8

0.30

110.8

1.78

133.6

including

243.2

260.5

17.3

0.71

225.5

3.71

278.6

including

258.1

259.5

1.4

3.61

1,136.8

18.76

1,407.2

LRGF-22-145

El Favor

17.4

19.0

1.6

0.45

202.0

3.15

236.0

and

26.7

29.1

2.4

0.36

143.5

2.27

170.5

LRGF-22-146

El Favor - Salomon

31.2

36.0

4.9

0.29

99.1

1.61

120.5

and

54.0

60.0

6.0

0.03

119.8

1.63

122.3

LRGF-22-147

El Favor

50.6

51.5

0.9

0.70

202.8

3.41

255.4

and

95.5

103.3

7.8

0.45

189.6

2.98

223.2

including

101.1

102.5

1.4

2.04

609.8

10.17

763.1

El Favor - Salomon

126.7

146.5

19.9

0.59

392.0

5.82

436.3

including

138.5

143.5

5.0

1.97

1,300.1

19.30

1,447.6

including

138.5

139.7

1.2

6.48

3,722.2

56.11

4,208.5

LRGF-22-148

El Favor

49.5

50.4

0.9

0.13

130.5

1.87

140.0

and

149.3

152.8

3.5

0.26

97.2

1.55

116.3

El Favor - Salomon

218.9

237.1

18.3

0.21

97.4

1.51

113.5

including

219.5

228.1

8.7

0.26

142.2

2.16

162.0

including

221.5

222.1

0.6

1.69

969.1

14.61

1,095.5

LRGF-22-149

El Favor

78.5

113.7

35.2

0.18

129.5

1.91

143.1

including

99.1

107.0

8.0

0.43

388.2

5.61

420.4

including

104.3

105.8

1.5

1.41

1,409.5

20.21

1,515.5

1. Not true width

2. AgEq converted using a silver to gold ratio of 75:1 at recoveries of 100%

Figure 1: El Favor Drill Hole Locations

Figure 1: El Favor Drill Hole Locations (CNW Group/GoGold Resources Inc.)

In early 2022, the exploration team began a systematic stepout drilling program to test the eastern strike extension of

the El Favor deposit in the area between Discovery Hole 48 and the underground workings at the Constancia Mine.

This area is known as the El Favor East zone, and the mapping and drilling program has extended the presence of

mineralization

900m

to the east of hole 48 (El Favor East zone discovery hole), as shown in Figure 1. To date,

approximately

800m

of El Favor East has been drilled showing the strong mineralization. The drill holes in this release

were not included in the initial Mineral Resource Estimate for Los Ricos North released on

December 7, 2021

, hole

LRGF-21-094 was the final drill hole included in that resource.

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGF-22-142

585675

2336753

1172

180

-45

54

LRGF-22-143

585675

2336754

1171

180

-53

93

LRGF-22-144

586476

2336711

1345

180

-45

317

LRGF-22-145

585675

2336754

1171

180

-70

123

LRGF-22-146

585376

2336508

1315

180

-45

72

LRGF-22-147

585253

2336549

1317

180

-45

214

LRGF-22-148

585927

2336902

1262

180

-50

341

LRGF-22-149

585155

2336496

1310

180

-50

117

El Favor is located approximately 800 meters along strike to the east of the El Orito deposit. The combined systems

cover approximately 2.9km in mineralized strike length over a 3.7km distance. At El Orito, wide zones of precious and

base metal mineralization were cut by drill holes at El Orito at elevations between 600 to

900m

. The drill holes at El

Favor have cut primarily silver-gold mineralization with trace to minor amounts of base metals at a higher elevation in

the system, between

1,050m

to

1,400m

, compared to the semi-massive to massive base metal sulphide

mineralization seen deeper in the El Orito deposit.

Figure 2: Favor Long Section

Figure 2: Favor Long Section (CNW Group/GoGold Resources Inc.)

VRIFY Slide Deck and 3D Presentation

VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining

assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and

Android apps.

The VRIFY 3D Slide Deck for GoGold can be viewed at:

https://vrify.com/companies/gogold-resources-inc

and on the

Company's website at:

www.gogoldresources.com

.

Los Ricos District Exploration Projects

The Company's two exploration projects at its Los Ricos Property are in

Jalisco

state,

Mexico

. The Los Ricos South

Project began in

March 2019

and an initial Mineral Resource was announced on

July 29, 2020

which disclosed a

Measured & Indicated Mineral Resource of 63.7 million ounces AgEq grading 199 g/t AgEq contained in 10.0 million

tonnes, and an Inferred Mineral Resource of 19.9 million ounces AgEq grading 190 g/t AgEq contained in 3.3 million

tonnes. An initial PEA on the project was announced on

January 20, 2021

indicating an NPV

5%

of

US$295M

. The

Eagle Concession was acquired in

October 2022

and is adjacent to the Main Area which contains the initial Mineral

Resource.

The Los Ricos North Project was launched in

March 2020

and an initial Mineral Resource was announced on

December 7, 2021

, which disclosed an Indicated Mineral Resource of 87.8 million ounces AgEq grading 122 g/t AgEq

contained in 22.3 million tonnes, and an Inferred Mineral Resource of 73.2 million ounces AgEq grading 111 g/t AgEq

contained in 20.5 million tonnes. The Company has a drill program for an additional 100,000 metres of drilling for 2022

in place.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample

lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core being bagged

and tagged for assay. The remaining half portion is returned to the core trays for storage and/or for metallurgical test

work.

The sealed and tagged sample bags are transported to the ActLabs facility in

Zacatecas, Mexico

. ActLabs crushes

the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106μm). The

pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits greater than 10

grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-element analysis is

completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than 100 grams per tonne silver

are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes

the systematic insertion and monitoring of appropriate reference materials (certified standards, blanks and duplicates)

into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to

ensure the integrity of the assay data. All results stated in this announcement have passed GoGold's QA/QC

protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the

technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing,

exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings mine in the

state of

Chihuahua

and has the Los Ricos South and Los Ricos North exploration projects in the state of

Jalisco

.

Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects. For more information

visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act of

1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold within

the

United States

or to, or for the benefit of, U.S. persons (as defined in Regulation S under the U.S. Securities Act)

except in compliance with the registration requirements of the U.S. Securities Act and applicable state securities laws

or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a solicitation of an offer to

buy of any of GoGold's securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation.

All statements other than statements of historical fact, included in this release, including, without limitation, statements

regarding the Los Ricos South and North projects, and future plans and objectives of GoGold, including the intention to

undertake further exploration at Los Ricos North, and the prospect of further discoveries there, constitute forward

looking information that involve various risks and uncertainties. Forward-looking information is based on a number of

factors and assumptions which have been used to develop such information but which may prove to be incorrect,

including, but not limited to, assumptions in connection with the continuance of GoGold and its subsidiaries as a going

concern, general economic and market conditions, mineral prices, the accuracy of mineral resource estimates, and

the performance of the Parral project. There can be no assurance that such information will prove to be accurate and

actual results and future events could differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration

and development risks associated with GoGold's projects, the failure to establish estimated mineral resources or

mineral reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For

additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's

continuous disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's

Annual Information Form. The forward-looking information contained in this release is made as of the date of this

release.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/gogold-announces-more-strong-drilling-results-at-el-favor-301724392.html

SOURCE

GoGold Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2023/18/c9722.html

%SEDAR: 00029249E

For further information:

For further information please contact: Steve Low, Corporate Development, GoGold

Resources, T: 416 855 0435, E: [email protected]

CO: GoGold Resources Inc.

CNW 06:30e 18-JAN-23