Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Announces Filing of PEA Technical Report for Los Ricos South

Technical Reports (NI 43-101) Economic Studies

GoGold Announces Filing of PEA Technical Report for Los

Ricos South

Shares Outstanding: 326,488,511

Trading Symbols: TSX: GGD

OTCQX: GLGDF

HALIFAX, NS

,

Oct. 27, 2023

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX: GLGDF)

("GoGold", "the

Company")

is pleased to announce the filing of a National Instrument 43-101 Preliminary Economic Assessment ("PEA")

Technical Report (the "Report") for their Los Ricos South Project located in Jalisco State, Mexico. The highlights of the Report

were previously announced in a news release dated

September 12, 2023

, and the effective date of the Report is

September

12, 2023

.

Highlights of the PEA, with a base case silver price of

US$23.75

/oz and gold price of

US$1,850

/oz are as follows (all figures in

US dollars unless otherwise stated):

After-Tax net present value ("NPV") (using a discount rate of 5%) of

US$458 Million

with an After-Tax IRR of 37% (Base

Case);

11-year mine life producing a total of 88 Million payable silver equivalent ounces ("AgEq"), consisting of 47 Million silver

ounces, 493 Thousand gold ounces, and 14 Million pounds of copper;

Initial capital costs of

$148 Million

, including

$19 Million

in contingency costs, over an expected 18 month build, additional

expansion capital of

$69 Million

, and sustaining capital costs of

$72 Million

over the life of mine ("LOM");

Average LOM operating cash costs of

$8.15

/oz AgEq, and all in sustaining costs ("AISC") of

$9.02

/oz AgEq

Average annual production of 8 Million AgEq oz;

Approximately half of LOM metal production is long hole underground ("UG"), and approximately half is open pit ("OP")

mining;

"We're happy to file our technical report for Los Ricos South which provides the details of the updated PEA and Mineral

Resource. The projected cash flows and economics of the project are very robust, especially when combined with our Los

Ricos North PEA that was completed in March of this year. With an NPV of

US$458M

at LRS and

US$413M

at LRN, we now

have a total NPV of

US$871M

in our Los Ricos district," said

Brad Langille

, President and CEO. "Our work on the Pre-

Feasibility Study ("PFS") is ongoing and we are currently completing the advanced geotechnical work with our consultants. We

will also continue to focus our efforts on the mine plan as we believe further optimization opportunities may be possible. With

our strong balance sheet we will continue to advance the project rapidly."

Highlights of the updated Mineral Resource:

Increase of 55% in Measured & Indicated Silver Equivalent ("AgEq") Ounces from initial

January 2021

MRE, with 39%

increase in Measured & Indicated AgEq grade;

Inclusion of 1.9 Million tonnes Measured & Indicated at excellent grade of 516 g/t AgEq in underground Eagle Deposit;

Measured & Indicated Mineral Resource at LRS of 98.6 Million ounces AgEq grading 276 g/t AgEq contained in 11.1

Million tonnes ("Mt");

Increased confidence in MRE, with conversion of approximately 9 Million ounces AgEq from initial

January 2021

Inferred

Mineral Resources to Measured & Indicated, resulting in 13.6 Million ounces AgEq in Inferred Mineral Resources at LRS

grading 185 g/t AgEq contained in 2.3 Mt;

Total Los Ricos Measured & Indicated Mineral Resources of 186 Million ounces AgEq, including Los Ricos North

Total Los Ricos Inferred Mineral Resources of 84 Million ounces AgEq, including Los Ricos North

Updated PEA Summary

The updated PEA was prepared by independent consultants P&E Mining Consultants Inc ("P&E"), with metallurgical test work

completed by SGS Canada Inc.'s

Lakefield

office ("SGS"), geotechnical study by Golder & Associates of

Tucson

, process

plant design and costing by D.E.N.M. Engineering Ltd., and environmental and permitting led by CIMA

Mexico

.

Following are tables and figures showing key assumptions, results, and sensitivities.

Table 1 – LRS PEA Key Economic Assumptions and Results

Assumption / Result

Unit

Value

Assumption / Result

Unit

Value

Total OP Plant Feed Mined

kt

9,367

Net Revenue

US$M

2,049

Total UG Plant Feed Mined

kt

4,325

Initial Capital Costs

US$M

148

Total Plant Feed Mined

kt

13,692

Expansion Capital Costs

US$M

69

Operating Strip Ratio

Ratio

7.4

Sustaining Capital Costs

US$M

72

Silver Grade

1

g/t

125

OP Mining Costs

$/t Plant Feed

12.13

Gold Grade

1

g/t

1.18

UG Mining Costs

$/t Plant Feed

43.85

AgEq Grade

1

g/t

217

LOM Mining Costs

$/t Plant Feed

22.15

Silver Recovery

%

86

Operating Cash Cost

US$/oz AgEq

8.15

Gold Recovery

%

95

All in Sustaining Cost

US$/oz AgEq

9.02

Silver Price

US$/oz

23.75

Mine Life

Yrs

11

Gold Price

US$/oz

1,850

Average process rate

t/day

3,359

Copper Price

US$/lb

4.00

After-Tax NPV (5% discount)

US$M

458

Payable Silver Metal

Moz

46.8

Pre-Tax NPV (5% discount)

US$M

708

Payable Gold Metal

koz

493.1

After-Tax IRR

%

36.6

Payable Copper

Mlb

13.6

Pre-Tax IRR

%

49.1

Payable AgEq

Moz

87.5

After-Tax Payback Period

Yrs

2.3

1.

Grades shown are LOM average process plant feed grades including both OP and UG sources. External dilution of approximately 10% for OP material and 28% for UG material was incorporated in the mining schedule.

Figure 1 – LRS Cash Flow Profile by Year (CNW Group/GoGold Resources Inc.)

Figure 1 above highlights the excellent post-tax cash flows associated with the LRS project. The economics of the project have

been evaluated based on the base case scenario

US$23.75

/oz silver price and gold price of

US$1,850

/oz. As illustrated in the

following sensitivity tables, the project remains robust even at lower commodity prices or with higher costs.

Table 2 – LRS PEA Gold and Silver Price Sensitivities

Sensitivity

Base

Case

Silver Price (US$/oz)

17

19

21

23.75

26

30

33

Gold Price (US$/oz)

1,324

1,480

1,636

1,850

2,025

2,337

2,571

After-Tax NPV (5%) (US$M)

185

266

346

458

548

710

831

After-Tax IRR (%)

19.7

25.1

30.2

36.6

41.6

49.9

55.7

After-Tax Payback (years)

3.6

3.0

2.6

2.3

2.1

1.7

1.6

Table 3 – LRS PEA Operating Cost and Capital Cost Sensitivities

Sensitivity

-20 %

-10 %

Base

Case

10 %

20 %

Operating Costs – NPV (US$M)

526

492

458

423

389

Operating Costs – IRR (%)

40.6

38.6

36.6

34.6

32.5

Capital Costs – NPV (US$M)

495

476

458

439

420

Capital Costs – IRR (%)

45.2

40.5

36.6

33.3

30.4

Capital and Operating Costs

The LRS Project has been envisioned as a combined underground and open pit mining operation, with contract underground

mining in years one to seven of the mine plan, supplemented by contract open pit mining in years three to eleven.

The process plant is comprised of conventional crushing and grinding followed by cyanide tank leaching. Back end filtration is

required to maximize water recycling (dry stack tailings) as well as a SART (sulfidation, acidification re-neutralization and

thickening) circuit to re-generate cyanide back to the process and to produce a saleable Cu

2

S copper sulfide product. Water

supply to the process plant is provided by a nearby seasonally charged water dam and high voltage grid power is provided by

the local utility. Expansion capital includes the cost to increase the process plant capacity from 1,750 tonnes per day to 4,000

tonnes per day in year three.

Table 4 – LOM Capital Cost Estimate

Type

Initial

(US$k)

Expansion

(US$k)

1

Sustaining

(US$k)

Total

(US$k)

Process Plant direct costs

54,475

42,700

12,125

109,300

Underground development

60,706

48,473

109,179

Pre-stripping

19,074

500

19,574

Infrastructure

9,980

1,250

11,230

Project indirect costs

3,750

3,750

Total

128,911

61,774

62,348

253,033

Contingency (15%)

19,337

6,747

9,352

35,436

Total

148,247

68,521

71,700

288,469

1.

Expansion capital is not included in AISC calculations

Table 5 – Operating Costs (Average LOM)

Operating Costs (Average LOM)

US$/tonne

Plant Feed

US$/tonne

Rock

Open Pit Mining

1

12.13

1.64

Underground Mining

2

43.85

Total LOM Mining

3

22.15

Processing ($/t processed)

27.10

General and Admin ($/t processed)

2.52

Total ($/t processed)

51.78

1.

Open pit mining costs include a double-benched waste rock and mineralized material average unit cost of $1.47/t.

2.

Bulk underground long hole mining. $43.85 is the cost of in-stope mining, additional development costs of $11.21/t mined are included in sustaining capital in table 4, providing a total UG mining cost of $55.06/t.

3.

Average LOM mining cost of both open pit and underground.

Mining

The contract underground mining will involve long hole stoping and cemented paste back filling of the mined-out stopes.

Approximately 10% of the underground feed to the process plant will be sourced in close proximity to historical workings. The

open pit mining will be contracted and carried out by drill and blast followed by conventional loading and truck haulage to the

waste rock storage facilities and the process plant.

Metallurgy

A metallurgical test program was carried out by SGS Lakefield of

Ontario, Canada

. The program included grinding and leaching

as well as comminution testing. The leach samples comprised of drill core sampling rejects representing the various zones of

the Mineral Resource and whole HQ drill core for the comminution work. This preliminary test program estimated average gold

and silver respective metallurgical recoveries of 95% and 85%.

Surface Rights Agreement

The Company has an agreement with the

Ejido

of

Cinco Minas

, which owns the surface rights over all of those concessions

included in this PEA. The agreement allows GoGold to mine and explore the 1,280 hectares of land that is owned by the local

Ejido

for a period of twelve years with an option to renew for a further twelve years.

Mineral Resource Estimate

The basis for the PEA is the Mineral Resource Estimate completed by P&E for the Los Ricos South Project located in Jalisco

State,

Mexico

, which has an effective date of

September 12, 2023

, which is available on SEDAR. A summary of the Mineral

Resource Estimate is provided in Table 6.

Table 6: Los Ricos South Mineral Resource Estimate – Pit Constrained and Out-of-Pit

(1-9)

Mining Area

Category

Tonnes

Average Grade

Contained Metal

Au

Ag

Cu

AuEq

AgEq

Au

Ag

Cu

AuEq

AgEq

(M)

(g/t)

(g/t)

( %)

(g/t)

(g/t)

(koz)

(koz)

(Mlb)

(koz)

(koz)

Pit

Constrained

5

Measured

3.9

1.08

142

0.03

2.94

231

135.9

17,858

2.3

369.1

28,898

Indicated

2.8

0.68

89

0.03

1.87

146

60.7

8,022

1.9

167.3

13,097

M&I

6.7

0.91

120

0.03

2.49

195

196.6

25,880

4.2

536.4

41,995

Inferred

0.5

0.58

99

0.04

1.91

150

9.6

1,632

0.4

31.4

2,460

Pit - Cerro C

6

Inferred

0.9

0.72

31

0.01

1.12

88

20.9

905

0.2

32.8

2,568

Out-of-Pit

7,8

Measured

0.7

3.60

298

0.35

7.94

621

80.7

6,679

5.4

178.1

13,940

Eagle

Indicated

1.2

3.13

164

0.37

5.79

453

117.5

6,176

9.5

217.5

17,028

M&I

1.9

3.30

214

0.36

6.59

516

198.2

12,855

15.0

395.6

30,969

Inferred

0.1

3.63

122

0.54

6.00

470

7.8

261

0.8

12.9

1,006

Out-of-Pit

7,8

Measured

1.1

1.22

194

0.06

3.79

297

44.7

7,093

1.6

138.8

10,865

Main

Indicated

1.4

1.58

178

0.21

4.18

327

71.5

8,013

6.6

188.4

14,753

M&I

2.5

1.42

185

0.15

4.00

313

116.2

15,106

8.1

327.2

25,618

Inferred

0.8

1.42

133

0.41

3.73

292

36.8

3,431

7.2

96.6

7,566

Total

Measured

5.7

1.42

172

0.07

3.72

291

261.4

31,631

9.3

686.0

53,703

Indicated

5.4

1.45

129

0.15

3.33

260

249.7

22,210

18.0

573.2

44,878

M&I

11.1

1.43

151

0.11

3.53

276

511.0

53,841

27.3

1,259.2

98,582

Inferred

2.3

1.02

85

0.17

2.36

185

75.0

6,230

8.6

173.7

13,601

1.

Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio-political,

marketing, or other relevant issues.

2.

The Inferred Mineral Resource in this estimate has a lower level of confidence than that applied to an Indicated Mineral Resource and must not be converted to a Mineral Reserve. It is reasonably expected that the majority of

the Inferred Mineral Resource could be upgraded to an Indicated Mineral Resource with continued exploration.

3.

The Mineral Resources in this news release were estimated in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM), CIM Standards on Mineral Resources and Reserves, Definitions and Guidelines

prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council.

4.

Historically mined areas were depleted from the Mineral Resource model.

5.

The pit constrained AgEq cut-off grade of 38 g/t Ag was derived from US$1,800/oz Au price, US$23.00/oz Ag price, 85% Ag and 95% Au process recovery, US$25/tonne process and G&A cost. The constraining pit

optimization parameters were $2.10/t mineralized material and waste mining cost, and 45-degree pit slopes.

6.

Cerro Colorado Resource constrained to open pit mining methods only; out-of-pit Mineral Resources are restricted to the Eagle and Abra mineralized veins, which exhibit historical continuity and reasonable potential for

extraction by cut and fill and longhole mining methods.

7.

The out-of-pit AgEq cut-off grade of 130 g/t Ag was derived from US$1,800/oz Au price, US$23.00/oz Ag price, 85% Ag and 95% Au process recovery, US$33/tonne process and G&A cost, and a $50/tonne mining cost. The

out-of-pit Mineral Resource grade blocks were quantified above the 130 g/t AgEq cut-off, below the constraining pit shell and within the constraining mineralized wireframes. Out–of-Pit Mineral Resources are restricted to the

Los Ricos and Rascadero Veins, which exhibit historical continuity and reasonable potential for extraction by cut and fill and longhole mining methods.

8.

AgEq and AuEq were calculated at an Ag/Au ratio of 78.2:1 for pit constrained and out-of-pit Resources.

9.

Totals may not sum due to rounding.

Figure 2 – LRS Mineral Resource Block Model Visualization (CNW Group/GoGold Resources Inc.)

Mineral Resource Estimate Methodology – LRS

A total of 585 drill holes totalling 93,591 metres were used in the MRE.

P&E collaborated with GoGold personnel to develop the mineralization models, estimates, and reporting criteria for the

Resources at Los Ricos. Mineralization models were initially developed by GoGold and were reviewed and modified by P&E. A

total of eight individual mineralized domains have been identified through drilling, surface and historical underground sampling.

The modeled mineralization domains are constrained by individual wireframes based on a 0.30 g/t AuEq cut-off for low-grade

domains or 3.0 g/t AuEq for high-grade domains.

Mineralization wireframes were used as hard boundaries for the purposes of estimation.

A three-dimensional sub-blocked model, with

3m

x

3m

x

3m

parent and

1m

x

1m

x

1m

sub blocks, was used for the Mineral

Resource Estimate. The block model consists of estimated Au, Ag and Cu grades, estimated bulk density, and classification

criteria. Au and Ag equivalent block grades were subsequently calculated from the estimated Au, Ag and Cu grades.

Sample assays were composited to a

1 m

standard length. Au and Ag grades were estimated using Inverse Distance Cubed

weighting of between 1 and 12 composites, with a maximum of 2 composites per drill hole. Composites were capped prior to

estimation by mineralization domain. Composite samples were selected within an anisotropic search ellipse oriented down the

plunge of identified high grade trends.

Individual bulk density values were applied to mineralized domains separately and were statistically determined using 4,516

measurements taken from drill holes.

Classification criteria were determined from observed grade and geological continuity as well as variography. Measured

Mineral Resources are informed by 3 or more drill holes within

30 m

; Indicated Mineral Resources are informed by 2 or more

drill holes within

60 m

.

P&E is of the opinion that the Mineral Resource Estimates are suitable for public reporting and are a reasonable representation

of the mineralization and metal content of the Los Ricos Deposits.

Table 7: AgEq Cut-off Sensitivities – LRS Pit Constrained Mineral Resource

1

Cut-off

Tonnes

Average Grade

Contained Metal

Pit

Constrained

(AgEq)

Au

Ag

Cu

AuEq

AgEq

Au

Ag

Cu

AuEq

AgEq

(g/t)

(M)

(g/t)

(g/t)

( %)

(g/t)

(g/t)

(koz)

(koz)

(Mlb)

(koz)

(koz)

Measured

250

1.06

2.71

336

0.04

7.07

553

92

11,437

0.9

240

18,808

150

1.76

2.00

250

0.03

5.24

410

113

14,121

1.3

296

23,195

80

2.76

1.44

185

0.03

3.85

301

128

16,417

1.8

342

26,777

60

3.26

1.26

164

0.03

3.40

266

133

17,167

2.0

356

27,892

38

3.90

1.08

142

0.03

2.94

231

136

17,858

2.3

369

28,898

30

4.11

1.03

137

0.03

2.82

221

137

18,019

2.4

372

29,124

Indicated

250

0.39

2.34

257

0.07

5.74

449

29

3,188

0.6

71

5,559

150

0.74

1.67

188

0.05

4.15

325

40

4,496

0.9

99

7,783

80

1.67

1.00

123

0.04

2.62

205

54

6,586

1.4

141

11,027

60

2.15

0.83

106

0.03

2.23

175

58

7,314

1.6

155

12,098

38

2.79

0.68

89

0.03

1.87

146

61

8,022

1.9

167

13,097

30

2.99

0.64

85

0.03

1.77

138

61

8,188

1.9

170

13,323

Inferred

250

0.10

1.41

252

0.06

4.71

369

5

822

0.1

15

1,203

150

0.13

1.29

217

0.07

4.16

326

6

939

0.2

18

1,408

80

0.34

0.77

127

0.05

2.47

194

8

1,394

0.4

27

2,119

60

0.45

0.64

108

0.04

2.08

163

9

1,572

0.4

30

2,374

38

0.51

0.58

99

0.04

1.91

150

10

1,632

0.4

31

2,460

30

0.54

0.56

96

0.04

1.84

144

10

1,652

0.5

32

2,490

1.

See Table 6 notes for assumptions

Table 8: AgEq Cut-off Sensitivities – LRS Out-of-Pit Mineral Resource

1,2

Cut-off

Tonnes

Average Grade

Contained Metal

Out-of-Pit

(AgEq)

Au

Ag

Cu

AuEq

AgEq

Au

Ag

Cu

AuEq

AgEq

(g/t)

(M)

(g/t)

(g/t)

( %)

(g/t)

(g/t)

(koz)

(koz)

(Mlb)

(koz)

(koz)

250

1.03

3.12

337

0.24

7.79

610

103

11,141

5.3

257

20,142

200

1.26

2.76

297

0.21

6.88

539

112

12,045

5.9

279

21,819

150

1.63

2.31

252

0.19

5.81

455

122

13,220

6.7

305

23,891

Measured

140

1.73

2.22

243

0.18

5.60

438

123

13,477

6.8

311

24,323

130

1.84

2.12

233

0.17

5.37

420

125

13,773

7.0

317

24,805

120

1.99

2.00

221

0.16

5.08

397

128

14,165

7.2

325

25,417

Indicated

250

1.59

3.13

224

0.35

6.52

510

160

11,425

12.2

333

26,052

200

1.92

2.80

203

0.33

5.89

461

173

12,529

13.8

363

28,444

150

2.31

2.47

183

0.30

5.26

412

183

13,607

15.2

391

30,610

140

2.43

2.38

178

0.29

5.10

399

186

13,885

15.6

398

31,165

130

2.57

2.29

172

0.28

4.91

384

189

14,189

16.1

406

31,781

120

2.74

2.18

165

0.28

4.71

369

192

14,520

16.7

414

32,445

Inferred

250

0.47

2.26

185

0.49

5.37

421

34

2,789

5.1

81

6,346

200

0.57

2.07

168

0.47

4.93

386

38

3,073

5.9

90

7,064

150

0.72

1.81

148

0.44

4.37

342

42

3,413

6.9

101

7,882

140

0.77

1.73

142

0.43

4.19

328

43

3,514

7.3

104

8,139

130

0.87

1.59

132

0.42

3.91

306

45

3,693

8.0

109

8,572

120

1.00

1.44

121

0.40

3.60

282

47

3,897

8.9

116

9,098

1.

See Table 6 notes for assumptions

Table 9: Los Ricos Mineral Resources – LRS & LRN

(1-4)

Deposit

Tonnes

Average Grade

Contained Metal

Au

Ag

Cu

Pb

Zn

AuEq

AgEq

Au

Ag

Cu

Pb

Zn

AuEq

AgEq

(M)

(g/t)

(g/t)

( %)

( %)

( %)

(g/t)

(g/t)

(koz)

(koz)

(Ml

b

)

(Ml

b

)

(Ml

b

)

(koz)

(koz)

LRS Measured

1

5.7

1.42

172

0.07

3.72

291

261

31,631

9

-

-

686

53,703

Indicated:

LRN (Oxide)

2

14.5

0.37

100

-

-

-

1.71

127

171

46,500

-

-

-

801

59,100

LRS (Oxide)

1

5.4

1.45

129

0.15

-

-

3.33

260

250

22,210

18

-

-

573

44,878

LRN (Sulfide)

2

7.8

0.06

28

0.11

0.88

1.33

1.55

114

15

7,011

19

151

229

389

28,708

Total Indicated

27.7

1.98

149

436

75,721

37

151

229

1,763

132,686

Measured & Indicated

33.4

2.28

174

697

107,352

46

151

229

2,449

186,390

Inferred:

LRN (Oxide)

2

15.0

0.28

91

-

-

-

1.52

112

136

44,131

-

-

-

734

54,191

LRS (Oxide)

1

2.3

1.02

85

0.17

-

-

2.36

185

75

6,230

9

-

-

174

13,601

LRN (Sulfide)

2

5.5

0.06

28

0.12

0.74

1.2

1.46

108

11

4,888

15

90

146

258

19,007

Total Inferred

22.8

1.59

119

222

55,249

24

90

146

1,166

86,799

1.

See Table 6 notes for assumptions

2.

See GoGold press release #04-2022 dated January 21, 2022 for full details regarding the LRN Resource.

3.

AgEq and AuEq calculated at an Ag/Au ratio of 87.5.

4.

Totals may not agree due to rounding.

Qualified Persons

Robert Harris

, P.Eng. and

David Duncan

, P.Geo. are the GoGold Qualified Persons and

Eugene Puritch

, P.Eng., FEC, CET,

President of P&E Mining Consultants Inc. and

David J. Salari

, P. Eng., D.E.N.M. Engineering Ltd. are Independent Qualified

Persons all as defined by National Instrument 43-101 and have reviewed and approved the technical information in this press

release.

VRIFY Slide Deck and 3D Presentation

VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets,

3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.

The VRIFY 3D Slide Deck for GoGold can be viewed at:

https://vrify.com/companies/gogold-resources-inc

and on the

Company's website at:

www.gogoldresources.com

.

Los Ricos District Exploration Projects

The Company's two exploration projects at its Los Ricos Property are in

Jalisco

state,

Mexico

. The Los Ricos South Project

began in

March 2019

, with the most recent Mineral Resource Estimate announced on

September 12, 2023

, which disclosed a

Measured & Indicated Mineral Resource of 98.6 Million ounces AgEq grading 276 g/t AgEq contained in 11.1 Million tonnes,

and an Inferred Mineral Resource of 11.0 Million ounces AgEq grading 248 g/t AgEq contained in 1.4 Million tonnes. The most

recent PEA on the Project was announced on

September 12, 2023

, indicating an after-tax NPV

5%

of

US$458M

.

The Los Ricos North Project was launched in

March 2020

and an initial Mineral Resource Estimate was announced on

December 7, 2021

, which disclosed an Indicated Mineral Resource Estimate of 87.8 million ounces AgEq grading 122 g/t AgEq

contained in 22.3 Million tonnes, and an Inferred Mineral Resource Estimate of 73.2 million ounces AgEq grading 111 g/t AgEq

contained in 20.5 Million tonnes. An initial PEA on the Project was announced on

May 17, 2023

, indicating an NPV

5%

of

US$413M

.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing, exploring and

acquiring high quality projects in Mexico. The Company operates the Parral Tailings Project in the

state of Chihuahua

and has

the Los Ricos South and Los Ricos North exploration Projects in the state of

Jalisco

. Headquartered in

Halifax, NS

, GoGold is

building a portfolio of low cost, high margin projects. For more information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as

amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or sold within

the United States

or to,

or for the benefit of, U.S. persons (as defined in Regulation S under the U.S. Securities Act) except in compliance with the

registration requirements of the U.S. Securities Act and applicable state securities laws or pursuant to exemptions therefrom.

This release does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's securities in

the United

States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All

statements other than statements of historical fact, included in this release, including, without limitation, statements regarding

the Los Ricos South and North projects, and future plans and objectives of GoGold, including the NPV, IRR, initial and

sustaining capital costs, operating costs, and LOM production of Los Ricos South, constitute forward looking information that

involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions which

have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in

connection with the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions,

mineral prices, the accuracy of Mineral Resource Estimates, and the performance of the Parral Project. There can be no

assurance that such information will prove to be accurate and actual results and future events could differ materially from those

anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and

development risks associated with GoGold's projects, the failure to establish estimated Mineral Resources or Mineral

Reserves, volatility of commodity prices, variations of recovery rates, and global economic conditions. For additional

information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous disclosure

materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The

forward-looking information contained in this release is made as of the date of this release.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/gogold-announces-filing-of-pea-technical-report-for-los-ricos-south-301969641.html

SOURCE

GoGold Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2023/27/c4486.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:

[email protected]

CO: GoGold Resources Inc.

CNW 09:00e 27-OCT-23