Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Announces Drilling Results at El Favor East

Drill Results

GoGold Announces Drilling Results at El Favor

East

Shares Outstanding: 294,609,617

Trading Symbols: TSX: GGD

TCQX: GLGDF

1,695 g/t AgEq over

0.9m

within

45.5m

of 136 g/t AgEq at El Favor East

HALIFAX, NS

,

March 16, 2022

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX:

GLGDF)

("GoGold", "the Company")

is pleased to release the results of 5 drill holes at El Favor East within

Los Ricos North. Hole LRGF-21-113 intersected

0.9m

of 1,695 g/t silver equivalent ("AgEq") contained within

45.5m

of 136 g/t AgEq. See Table 1 for breakdown of silver and gold values and Figure 1 for a cross section

of LRGF-21-113. These drill holes represent data that is post resource cut-off date and will form part of a

future resource update. The drill program at El Favor East is primarily focused on expansion of the resources

with up-dip and down-dip drilling in addition to strike expansion on the zone towards the east.

"El Favor East continues to provide great results for us, with high grade intercepts surrounded by wider zones

of good potentially bulk mineable grades such as those shown in hole 113," said

Brad Langille

, President and

CEO. "Results such as these are what we believe will help us achieve our goal of aggressively expanding our

mineral resources at Los Ricos in 2022."

Table 1: Drill Hole Intersections

Hole ID

Area / Vein

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGF-21-110

El Favor East

30.7

31.7

1.0

0.15

72.7

1.12

84.2

and

132.6

133.8

1.2

0.24

81.8

1.33

99.9

LRGF-21-111

El Favor East

171.0

177.0

6.0

0.18

100.5

1.52

114.0

including

171.0

172.1

1.1

0.09

210.0

2.89

216.9

and

234.1

236.5

2.4

0.47

140.1

2.34

175.4

LRGF-21-112

El Favor East

117.6

118.8

1.2

0.50

151.8

2.52

189.2

LRGF-21-113

El Favor East

157.4

159.1

1.7

0.90

257.0

4.33

324.5

and

274.2

319.6

45.5

0.52

97.0

1.81

135.7

including

280.9

281.8

0.9

13.05

716.3

22.60

1,695.0

LRGF-21-114

El Favor East

74.5

79.5

5.0

0.42

92.7

1.66

124.4

including

76.4

78.5

2.1

0.69

169.2

2.95

221.1

and

381.1

388.5

7.4

0.36

107.5

1.79

134.5

including

386.7

387.9

1.2

1.03

327.9

5.40

405.0

1.

Not true width

2.

AqEq converted using a silver to gold ratio of 75:1 at recoveries of 100%

Figure 1: El Favor Drill Hole Locations (CNW Group/GoGold Resources Inc.)

The exploration team has been moving east of El Favor with drilling stepouts in the eastern end of El Favor,

beginning with discovery hole 48, and continuing to intersect wide strong mineralization. This area is known as

the El Favor East zone, and a mapping and drilling program has extended the presence of mineralization

900m

to the east of hole 48 (El Favor East zone discovery hole), as shown in Figure 1. To date, approximately

800m

of El Favor East has been drilled showing the strong mineralization. The drill holes in this release were

not included in the initial Mineral Resource Estimate for Los Ricos North released on

December 7, 2021

, hole

LRGF-21-094 was the final drill hole included in that resource.

Table 2: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGF-21-110

586353

2336742

1350

180

-45

287

LRGF-21-111

586276

2336791

1374

180

-45

329

LRGF-22-112

586643

2336801

1315

180

-50

425

LRGF-22-113

586501

2336741

1338

180

-45

349

LRGF-22-114

586675

2336767

1313

180

-50

434

In September, the company commissioned TMC Exploracion to complete an IP survey using the Pole:Dipole

array on the El Favor property. The grid consists of a network of 28 N/S profiles spaced every

100 m

from L-

2W to L-25E ranging in length from 0.85 to 2.0 km. The survey outlined several high chargeability anomalies

representative of the sulphide mineralization along the El Favor – El Favor East zone. A geophysical map

showing anomalies and drilling targets is included as Figure 2 below.

Figure 2: Geophysical Map – El Favor (CNW Group/GoGold Resources Inc.)

El Favor is located approximately 800 meters along strike to the east of the El Orito deposit. The combined

systems cover approximately 2.9km in mineralized strike length over a 3.7km distance. At El Orito, wide

zones of precious and base metal mineralization were cut by drill holes at El Orito at elevations between 600

to

900m

. The drill holes at El Favor have cut primarily silver-gold mineralization with trace to minor amounts of

base metals at a higher elevation in the system, between

1,050m

to

1,400m

, compared to the semi-massive

to massive base metal sulphide mineralization seen deeper in the El Orito deposit.

Figure 3: Favor Long Section (CNW Group/GoGold Resources Inc.)

VRIFY Slide Deck and 3D Presentation

VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of

remote mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with

the VRIFY iOS and Android apps.

The VRIFY Slide Deck and 3D Presentation for GoGold can be viewed at:

https://vrify.com/decks/10437

and

on the Company's website at:

www.gogoldresources.com

.

Los Ricos District Exploration Projects

The Company's two exploration projects at its Los Ricos Property are in

Jalisco

state,

Mexico

. The Los Ricos

South Project began in

March 2019

and an initial Mineral Resource was announced on

July 29, 2020

which

disclosed a Measured & Indicated Mineral Resource of 63.7 million ounces AgEq grading 199 g/t AgEq

contained in 10.0 million tonnes, and an Inferred Mineral Resource of 19.9 million ounces AgEq grading 190

g/t AgEq contained in 3.3 million tonnes. An initial PEA on the project was announced on

January 20, 2021

indicating an NPV

5%

of

US$295M

.

The Los Ricos North Project was launched in

March 2020

and an initial Mineral Resource was announced on

December 7, 2021

, which disclosed an Indicated Mineral Resource of 87.8 million ounces AgEq grading 122

g/t AgEq contained in 22.3 million tonnes, and an Inferred Mineral Resource of 73.2 million ounces AgEq

grading 111 g/t AgEq contained in 20.5 million tonnes. The Company has a drill program for an additional

100,000 metres of drilling for 2022 in place.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the

sample lengths are determined, the full core is sawn with a diamond blade core saw with one half of the core

being bagged and tagged for assay. The remaining half portion is returned to the core trays for storage

and/or for metallurgical test work.

The sealed and tagged sample bags are transported to the ActLabs facility in

Zacatecas, Mexico

. ActLabs

crushes the samples and prepares 200-300 gram pulp samples with ninety percent passing Tyler 150 mesh

(106μm). The pulps are assayed for gold using a 50-gram charge by fire assay (Code 1A2-50) and over limits

greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code 1A3-50). Silver and multi-

element analysis is completed using total digestion (Code 1F2 Total Digestion ICP). Over limits greater than

100 grams per tonne silver are re-assayed using a gravimetric finish (Code 8-Ag FA-GRAV Ag).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and

includes the systematic insertion and monitoring of appropriate reference materials (certified standards,

blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in

each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have

passed GoGold's QA/QC protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible

for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating,

developing, exploring and acquiring high quality projects in Mexico. The Company operates the Parral Tailings

mine in the

state of Chihuahua

and has the Los Ricos South and Los Ricos North exploration projects in the

state of

Jalisco

. Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects.

For more information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities

Act of 1933, as amended (the "U.S. Securities Act"), or any state securities laws, and may not be offered or

sold within

the United States

or to, or for the benefit of, U.S. persons (as defined in Regulation S under the

U.S. Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and

applicable state securities laws or pursuant to exemptions therefrom. This release does not constitute an offer

to sell or a solicitation of an offer to buy of any of GoGold's securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities

legislation. All statements other than statements of historical fact, included in this release, including, without

limitation, statements regarding the Los Ricos South and North projects, and future plans and objectives of

GoGold, including the intention to undertake further exploration at Los Ricos North, and the prospect of further

discoveries there, constitute forward looking information that involve various risks and uncertainties. Forward-

looking information is based on a number of factors and assumptions which have been used to develop such

information but which may prove to be incorrect, including, but not limited to, assumptions in connection with

the continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions,

mineral prices, the accuracy of mineral resource estimates, and the performance of the Parral project. There

can be no assurance that such information will prove to be accurate and actual results and future events could

differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include

exploration and development risks associated with GoGold's projects, the failure to establish estimated

mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and global

economic conditions. For additional information with respect to risk factors applicable to GoGold, reference

should be made to GoGold's continuous disclosure materials filed from time to time with securities regulators,

including, but not limited to, GoGold's Annual Information Form. The forward-looking information contained in

this release is made as of the date of this release.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/gogold-announces-drilling-results-at-el-favor-east-301503803.html

SOURCE

GoGold Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/March2022/16/c1477.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E:

[email protected]

CO: GoGold Resources Inc.

CNW 06:30e 16-MAR-22