Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GGD.TO ·

GoGold Announces Acquisition of Eagle Concession in Los Ricos South and Due Diligence Drilling

Drill Results Mergers & Acquisitions

GoGold Announces Acquisition of Eagle Concession in Los Ricos South

and Due Diligence Drilling

Shares Outstanding: 295,706,006

Trading Symbols: TSX: GGD

OTCQX: GLGDF

2,260 g/t AgEq over

11.9m

within

72.6m

of 461 g/t AgEq discovered in Eagle Deposit

HALIFAX, NS

,

Oct. 18, 2022

/CNW/ -

GoGold Resources Inc.

(TSX: GGD) (OTCQX: GLGDF)

("GoGold", "the Company")

is pleased to announce the

acquisition of the Eagle concession covering the northern strike extension of the Main Deposit on the Los Ricos South property. The Eagle adjoins the Main

Deposit where the Los Ricos South Preliminary Economic Assessment ("PEA") was released on

January 20, 2021

. This represents an extension to this

previously defined Mineral Resource Estimate at Los Ricos South. Due diligence drilling has returned the highest grade intercepts to date in the district.

These wide high grade intercepts are consistent with geophysical targets on the new concession. Additional drill results are to follow.

The new concession covers 1,107 hectares, including the area between the Main Deposit and the Company's

Jamaica

concession located 3km to the

northwest, where the Company holds the rights to additional concessions. While negotiating the concession acquisition and securing legal ownership, the

Company completed due diligence drilling, including hole LRGAG-21-014, which intercepted 20,269 g/t silver equivalent ("AgEq") over

0.7m

, contained

within

11.9m

of 2,260 g/t AgEq which was contained within a wider intersection of

72.6m

containing 461 g/t AgEq. This represents the highest value drill

hole the Company has drilled in the district, with hole LRGAG-21-031 having comparable results of 428 g/t AgEq over 68 metres. Drilling highlights are

provided in Table 1 below, with full results in Table 2.

"We see the addition of the Eagle concession as a clear path to greatly increasing the value of our Los Ricos South project, as it is the same structure

extending from our previously drilled Main zone onto the Eagle. As part of our due diligence we completed mapping, geophysics and drilling that strongly

linked the geophysical anomaly to the high grade intercepts. In fact, hole 14 is the highest grade-thickness intercept drilled by the Company to date," said

Brad Langille

, President and CEO. "As we continue with a systematic drill program, we will evaluate the results which may greatly improve the economics

of the previously released Los Ricos South PEA."

Table 1: Highlighted Drill Hole Intersections

(Complete results in Table 2)

Hole ID

Area / Vein

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGAG-21-014

Eagle

144.3

216.9

72.6

5.13

76.0

6.14

460.6

including

198.8

210.7

11.9

28.58

115.9

30.13

2,259.8

including

208.6

210.7

2.1

146.03

176.8

148.39

11,128.9

including

208.6

209.3

0.7

266.00

319.0

270.25

20,269.0

LRGAG-22-031

Eagle

58.0

126.0

68.0

4.25

109.4

5.71

428.4

including

78.0

113.9

35.9

7.83

184.9

10.29

771.8

including

80.0

95.0

15.0

15.61

273.3

19.26

1,444.4

including

84.0

86.0

2.0

46.80

272.5

50.43

3,782.5

LRGAG-22-030

Eagle

42.9

79.5

36.7

1.77

156.2

3.85

289.0

including

51.9

61.0

9.1

6.00

553.3

13.38

1,003.2

including

54.1

54.8

0.7

14.00

1,260.0

30.80

2,310.0

LRGAG-22-029

Eagle

74.0

94.6

20.6

1.52

217.5

4.42

331.3

including

75.5

77.5

2.0

8.00

1,865.5

32.87

2,465.5

including

75.5

76.5

1.0

14.15

3,520.0

61.08

4,581.3

LRGAG-21-018

Eagle

127.6

163.0

33.6

1.57

85.5

2.71

203.5

including

156.9

159.3

2.4

10.51

436.5

16.33

1,225.0

including

156.9

157.6

0.8

15.00

1,155.0

30.40

2,280.0

and

177.9

178.6

0.7

36.20

1,500.0

56.20

4,215.0

LRGAG-21-007

Eagle

148.5

191.0

42.5

1.64

137.5

3.47

260.6

including

188.6

190.2

1.6

6.83

1,269.5

23.76

1,781.8

1.

Not true width

2.

AqEq converted using a silver to gold ratio of 75:1 at recoveries of 100%

The Company has completed preliminary geological mapping, sampling, geophysical IP surveying, and has commenced a drill program at the Eagle.

Mapping and geophysics indicate the Eagle structure extending in excess of 2.5km to the northwest, at which point it continues onto the Company's

previously owned

Jamaica

concessions. The Main Area was included in the initial Los Ricos South Mineral Resource estimate released on

July 29, 2020

,

which included 1.1 km along strike of the mineralized trend. Figure 1 shows a cross section including drill hole LRGAG-21-014, Figure 2 shows a cross

section including drill hole LRGAG-22-030, Figure 4 shows a grade-thickness longitudinal section showing both the original Main Area and the Eagle, and

Figure 5 is a longitudinal section showing the detailed intersections.

Figure 1: Eagle – Cross Section Holes 11, 12, 13, 14 (CNW Group/GoGold Resources Inc.)

Figure 2: Eagle – Cross Section Holes 30,31 (CNW Group/GoGold Resources Inc.)

While there was some historical underground mining development in the early 1900's on the Eagle concession, there was only one historical void

encountered during drilling, which suggest that the mineralization at the Eagle may be intact and not previously mined. The location and high grade

intercepts may indicate the presence of a high grade ore shoot that was not previously exploited. This differs from the Main Area which has had portions

of it's high grade ore shoots mined out.

The results of the sampling and geophysical IP survey (Figure 3) appear to indicate that the mineralized structure continues in a Northerly direction from the

Main Area. Significant geophysical anomalies were identified which will form targets for the drilling campaign.

Figure 3: Eagle & Main Area Geophysics (CNW Group/GoGold Resources Inc.)

Figure 4: Eagle + Main Area Longitudinal Section (CNW Group/GoGold Resources Inc.)

Figure 5: Eagle Longitudinal Section (CNW Group/GoGold Resources Inc.)

Acquisition

The rights to the Eagle concession were acquired through the agreement to pay

$2.1 million USD

to be paid over 4 years. The concession connects the

Company's concessions held in the southern portion of its Los Ricos South project, including the Main area where the Initial Resource was released, to its

northern concessions in Los Ricos South, which includes the

Jamaica

exploration target. As a result, all of the concessions in Los Ricos South are now

contiguous (Figure 6).

The Company exploration team has been completing detailed mapping and sampling at

Jamaica

over the last year and sees the same structure that was

drilled in the main zone at Los Ricos South extending for several kilometres over the

Jamaica

concessions. This offers the potential for an additional bulk

tonnage target in Los Ricos South, with continuity from the Main Area and Eagle.

Figure 6: Los Ricos District Overview (CNW Group/GoGold Resources Inc.)

Table 2: Drill Hole Intersections

Hole ID

Area / Vein

From

To

Length

1

Au

Ag

AuEq

2

AgEq

2

(m)

(m)

(m)

(g/t)

(g/t)

(g/t)

(g/t)

LRGAG-20-001

Eagle

138.2

170.9

32.7

1.11

35.1

1.58

118.7

including

167.3

168.9

1.6

19.09

122.6

20.72

1,554.0

LRGAG-20-002

Eagle

160.5

177.2

16.7

0.24

51.4

0.93

69.4

LRGAG-20-004

Eagle

94.8

113.8

19.0

0.45

57.0

1.21

90.7

including

97.8

100.0

2.2

1.66

186.4

4.14

310.6

LRGAG-20-005

Eagle

49.6

54.9

5.4

0.68

51.9

1.37

102.6

LRGAG-20-006

Eagle

3

74.7

107.6

26.9

0.49

57.0

1.25

93.8

including

83.6

85.6

2.0

1.60

197.6

4.23

317.5

LRGAG-21-007

Eagle

148.5

191.0

42.5

1.64

137.5

3.47

260.6

including

155.5

156.5

1.0

7.42

493.0

13.99

1,049.5

including

188.6

190.2

1.6

6.83

1,269.5

23.76

1,781.8

LRGAG-21-008

Eagle

24.7

26.7

2.0

0.58

93.4

1.82

136.7

LRGAG-21-009

Eagle

35.6

73.8

38.2

0.43

34.6

0.89

66.7

including

42.8

49.8

7.1

1.30

123.8

2.95

221.3

LRGAG-21-010

Eagle

16.8

51.5

34.7

0.56

47.9

1.20

90.1

including

38.0

39.0

1.0

7.88

263.0

11.39

854.0

LRGAG-21-011

Eagle

52.1

91.3

39.2

0.68

58.1

1.45

108.9

including

64.7

66.2

1.5

2.87

133.7

4.65

348.7

LRGAG-21-012

Eagle

4

111.3

179.7

66.1

1.29

55.4

2.03

152.0

including

140.0

141.0

1.0

14.60

1,080.0

29.00

2,175.0

including

146.8

147.5

0.8

14.95

87.0

16.11

1,208.3

including

150.5

154.5

4.1

7.36

80.8

8.44

632.8

including

172.9

174.5

1.7

1.84

127.7

3.54

265.5

LRGAG-21-013

Eagle

90.0

121.7

31.7

0.65

64.5

1.51

113.5

including

108.6

109.5

0.9

1.30

301.0

5.31

398.5

including

114.2

115.0

0.8

2.49

274.0

6.14

460.8

LRGAG-21-014

Eagle

144.3

216.9

72.6

5.13

76.0

6.14

460.6

including

173.1

176.2

3.1

4.86

659.6

13.66

1,024.1

including

198.8

210.7

11.9

28.58

115.9

30.13

2,259.8

including

208.6

210.7

2.1

146.03

176.8

148.39

11,128.9

including

208.6

209.3

0.7

266.00

319.0

270.25

20,269.0

including

210.0

210.7

0.7

168.50

140.0

170.37

12,777.5

LRGAG-21-015

Eagle

146.5

163.9

17.4

1.02

36.6

1.51

113.1

including

146.5

147.2

0.7

11.75

284.0

15.54

1,165.2

and

177.8

179.3

1.4

0.99

69.1

1.92

143.7

LRGAG-21-016

Eagle

175.8

182.6

6.8

0.88

82.4

1.98

148.1

including

180.3

181.3

0.9

3.42

308.0

7.53

564.5

LRGAG-21-017

Eagle

121.7

145.1

23.4

2.25

133.0

4.02

301.7

including

125.7

126.3

0.6

25.40

437.0

31.23

2,342.0

LRGAG-21-018

Eagle

127.6

163.0

33.6

1.57

85.5

2.71

203.5

including

156.9

159.3

2.4

10.51

436.5

16.33

1,225.0

including

156.9

157.6

0.8

15.00

1,155.0

30.40

2,280.0

and

177.9

178.6

0.7

36.20

1,500.0

56.20

4,215.0

LRGAG-22-019

Eagle

40.2

41.3

1.1

1.17

28.5

1.55

116.5

and

50.6

53.2

2.6

1.19

35.9

1.67

125.3

LRGAG-22-021

Eagle

72.0

94.5

22.5

2.38

24.4

2.70

202.7

including

88.4

90.0

1.6

24.60

49.0

25.25

1,894.0

including

88.4

89.2

0.8

27.40

40.8

27.94

2,095.8

LRGAG-22-023

Eagle

41.5

96.6

55.1

0.82

99.8

2.15

161.2

including

57.5

65.6

8.1

2.12

519.9

9.06

679.3

including

60.3

62.6

2.3

4.76

1,471.5

24.39

1,828.9

including

60.3

61.5

1.2

4.89

2,650.0

40.22

3,016.7

LRGAG-22-027

Eagle

101.7

110.7

9.0

1.54

62.5

2.37

177.7

including

108.7

109.7

1.0

5.79

33.2

6.23

467.5

LRGAG-22-028

Eagle

44.8

48.8

4.0

0.66

63.7

1.51

112.9

LRGAG-22-029

Eagle

59.0

63.5

4.5

1.20

60.3

2.01

150.6

and

74.0

94.6

20.6

1.52

217.5

4.42

331.3

including

75.5

77.5

2.0

8.00

1,865.5

32.87

2,465.5

including

75.5

76.5

1.0

14.15

3,520.0

61.08

4,581.3

LRGAG-22-030

Eagle

42.9

79.5

36.7

1.77

156.2

3.85

289.0

including

51.9

61.0

9.1

6.00

553.3

13.38

1,003.2

including

54.1

54.8

0.7

14.00

1,260.0

30.80

2,310.0

LRGAG-22-031

Eagle

58.0

126.0

68.0

4.25

109.4

5.71

428.4

including

78.0

113.9

35.9

7.83

184.9

10.29

771.8

including

80.0

95.0

15.0

15.61

273.3

19.26

1,444.4

including

80.0

86.0

6.0

20.96

472.8

27.26

2,044.5

including

84.0

86.0

2.0

46.80

272.5

50.43

3,782.5

1.

Not true width

2.

AqEq converted using a silver to gold ratio of 75:1 at recoveries of 100%

3.

Excludes 6.0m historically mined void

4.

Excludes 2.3m historically mined void

5.

Holes LRGAG-21-020, 022, 024, 025, 026 did not intercept significant mineralization.

Table 3: Drill Hole Locations

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length

LRGAG-20-001

610102

2328248

1295

50

-65

237

LRGAG-20-002

610102

2328219

1306

50

-65

218

LRGAG-20-003

610176

2328321

1306

50

-45

76

LRGAG-20-004

610175

2328321

1306

0

-90

143

LRGAG-20-005

610165

2328340

1304

50

-45

70

LRGAG-20-006

610164

2328339

1303

0

-90

140

LRGAG-21-007

610058

2328297

1284

50

-75

292

LRGAG-21-008

610172

2328402

1313

50

-50

89

LRGAG-21-009

610170

2328401

1312

0

-90

140

LRGAG-21-010

610142

2328443

1311

50

-50

103

LRGAG-21-011

610141

2328442

1311

0

-90

132

LRGAG-21-012

610056

2328370

1282

50

-75

231

LRGAG-21-013

610055

2328369

1282

50

-50

191

LRGAG-21-014

610055

2328369

1282

0

-90

321

LRGAG-21-015

610059

2328297

1284

50

-50

235

LRGAG-21-016

610058

2328296

1284

0

-90

257

LRGAG-21-017

610058

2328345

1283

50

-50

227

LRGAG-21-018

610058

2328344

1283

50

-75

254

LRGAG-22-019

610143

2328421

1308

50

-50

109

LRGAG-22-020

609704

2328800

1235

50

-45

114

LRGAG-22-021

610026

2328548

1271

50

-50

216

LRGAG-22-022

610096

2328608

1301

50

-45

157

LRGAG-22-023

610142

2328420

1307

50

-85

150

LRGAG-22-024

610096

2328607

1300

50

-70

173

LRGAG-22-025

609703

2328799

1234

50

-90

141

LRGAG-22-026

609806

2328557

1234

50

-45

306

LRGAG-22-027

610026

2328548

1271

50

-70

218

LRGAG-22-028

610062

2328514

1272

50

-53

210

LRGAG-22-029

610058

2328443

1278

50

-50

167

LRGAG-22-030

610061

2328513

1272

50

-70

266

LRGAG-22-031

610061

2328513

1272

0

-90

322

VRIFY Slide Deck and 3D Presentation

VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets, 3D models and interactive

presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.

The VRIFY 3D Slide Deck for GoGold can be viewed at:

https://vrify.com/companies/gogold-resources-inc

and on the Company's website at:

www.gogoldresources.com

.

Los Ricos District Exploration Projects

The Company's two exploration projects at its Los Ricos Property are in

Jalisco

state,

Mexico

. The Los Ricos South Project began in

March 2019

and an

initial Mineral Resource was announced on

July 29, 2020

which disclosed a Measured & Indicated Mineral Resource of 63.7 million ounces AgEq grading

199 g/t AgEq contained in 10.0 million tonnes, and an Inferred Mineral Resource of 19.9 million ounces AgEq grading 190 g/t AgEq contained in 3.3 million

tonnes. An initial PEA on the project was announced on

January 20, 2021

indicating an NPV

5%

of

US$295M

.

The Los Ricos North Project was launched in

March 2020

and an initial Mineral Resource was announced on

December 7, 2021

, which disclosed an

Indicated Mineral Resource of 87.8 million ounces AgEq grading 122 g/t AgEq contained in 22.3 million tonnes, and an Inferred Mineral Resource of 73.2

million ounces AgEq grading 111 g/t AgEq contained in 20.5 million tonnes. The Company has a drill program for an additional 100,000 metres of drilling for

2022 in place.

Procedure, Quality Assurance / Quality Control and Data Verification

The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full core is

sawn with a diamond blade core saw with one half of the core being bagged and tagged for assay. The remaining half portion is returned to the core trays

for storage and/or for metallurgical test work.

The sealed and tagged sample bags are transported to the ALS Chemex facility in

Zacatecas, Mexico

. ALS Chemex crushes the samples and prepares

200-300 gram pulp samples with ninety percent passing Tyler 150 mesh (106μm). The pulps are assayed for gold using a 30-gram charge by fire assay

(Code AA23) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code ME-GRAV21). Silver and multi-element

analysis is completed using total digestion (Code ME-ICP61 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed

using a gravimetric finish (ME-GRA21).

Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and

monitoring of appropriate reference materials (certified standards, blanks and duplicates) into the sample strings. The results of the assaying of the

QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed GoGold's

QA/QC protocols.

Mr.

David Duncan

, P. Geo. is the qualified person as defined by National Instrument 43-101 and is responsible for the technical information of this release.

About GoGold Resources

GoGold Resources (TSX: GGD) is a Canadian-based silver and gold producer focused on operating, developing, exploring and acquiring high quality

projects in Mexico. The Company operates the Parral Tailings mine in the

state of Chihuahua

and has the Los Ricos South and Los Ricos North

exploration projects in the state of

Jalisco

. Headquartered in

Halifax, NS

, GoGold is building a portfolio of low cost, high margin projects. For more

information visit

gogoldresources.com

.

CAUTIONARY STATEMENT:

The securities described herein have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the "U.S.

Securities Act"), or any state securities laws, and may not be offered or sold within

the United States

or to, or for the benefit of, U.S. persons (as defined

in Regulation S under the U.S. Securities Act) except in compliance with the registration requirements of the U.S. Securities Act and applicable state

securities laws or pursuant to exemptions therefrom. This release does not constitute an offer to sell or a solicitation of an offer to buy of any of GoGold's

securities in

the United States

.

This news release may contain "forward-looking information" as defined in applicable Canadian securities legislation. All statements other than statements

of historical fact, included in this release, including, without limitation, statements regarding the Los Ricos South and North projects, and future plans and

objectives of GoGold, including the intention to undertake further exploration at Los Ricos North, and the prospect of further discoveries there, constitute

forward looking information that involve various risks and uncertainties. Forward-looking information is based on a number of factors and assumptions

which have been used to develop such information but which may prove to be incorrect, including, but not limited to, assumptions in connection with the

continuance of GoGold and its subsidiaries as a going concern, general economic and market conditions, mineral prices, the accuracy of mineral resource

estimates, and the performance of the Parral project. There can be no assurance that such information will prove to be accurate and actual results and

future events could differ materially from those anticipated in such forward-looking information.

Important factors that could cause actual results to differ materially from GoGold's expectations include exploration and development risks associated with

GoGold's projects, the failure to establish estimated mineral resources or mineral reserves, volatility of commodity prices, variations of recovery rates, and

global economic conditions. For additional information with respect to risk factors applicable to GoGold, reference should be made to GoGold's continuous

disclosure materials filed from time to time with securities regulators, including, but not limited to, GoGold's Annual Information Form. The forward-looking

information contained in this release is made as of the date of this release.

View original content to download multimedia:

https://www.prnewswire.com/news-releases/gogold-announces-acquisition-of-eagle-concession-in-los-ricos-south-and-due-diligence-drilling-301651703.html

SOURCE

GoGold Resources Inc.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/October2022/18/c2164.html

%SEDAR: 00029249E

For further information:

Steve Low, Corporate Development, GoGold Resources, T: 416 855 0435, E: [email protected]

CO: GoGold Resources Inc.

CNW 06:30e 18-OCT-22