Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GG.V ·

Golconda GOLD Releases Financial and Operating Results FOR 2025

Financials

-1-

GOLCONDA GOLD RELEASES FINANCIAL AND OPERATING RESULTS FOR 2025

TORONTO, ONTARIO – April 23, 2026: G olconda Gold Ltd. (“G olconda Gold” or the

“Company”) (TSX -V: GG; OTCQ X: GGGOF ) is pleased to announce the release of its

financial results for the year ended December 31, 202 5. All amounts are in United States

dollars unless otherwise indicated.

A copy of the audited consolidated financial statements for the year ended December 31,

2025, prepared in accordance with International Financial Reporting Standards , and the

corresponding management’s discussion and analysis (“MD&A”) are available under the

Company’s profile on www.sedarplus.ca.

2025 Highlights

▪ For the year ended December 31, 2025, the Company:

o mined 135,428 tonnes of ore, from its Galaxy and Princeton ore bodies, with

an average grade of 3.46 grammes per tonne (g/t) compared to 87,695

tonnes at 3.18 g/t in the year ended December 31, 202 4, a 54% increase

in ore tonnes mined;

o completed 1,323 metres of development compared to 702 metres in the

year ended December 31, 2024, an increase of 88%;

o produced 11,289 tonnes of concentrate at an average grade of 3 5.9 g/t

containing 13,020 ounces of gold compared to 6,661 tonnes at 3 6.0 g/t

containing 7,712 ounces of gold in the year ended December 31, 202 4, a

69% increase in gold production;

o generated revenue of $33.8 million at an operating cash cost of $1,534 per

payable ounce compared to revenue of $13.8 million for the year ended

December 3 1, 202 4 at an operating cash cost of $1, 721 per payable

ounce(1);

o generated operating cash flow of $10.4 million and repaid $2.3 million of

debt compared to operating cash flow of $4.5 million in the year ended

December 31, 2024; and

o progressed key workstreams on the Summit Property re-start project, with

mining operations expected to commence in the second quarter of 2026.(2)

Golconda Gold CEO, Ravi Sood commented: “2025 was a transformational year for Galaxy

and Golconda Gold. Two historic mining areas were re -established during the year,

Princeton Top and Galaxy 26/27 levels, which along with significant investment in mining

equipment from both a capital and preventative maintenance perspective enabled gold

production to increase 69% compared to 2024. This significant increase in production, and

the material increase in realised gold price during 2025 has enabled the Company to invest

further at Galaxy and has significantly improved the Company’s balance sheet and working

capital position. Significant progress was also made in 2025 on the Summit Property re -

start project and we are excited to bring our second project into production in the very

near future.(2)”

About Golconda Gold

Golconda Gold is an un -hedged gold producer and explorer with mining operations and

exploration tenements in South Africa and New Mexico. Golconda Gold is a public company

and its shares are quoted on the TSX Venture Exchange under the symbol “GG” and the

OTCQX under the symbol “GGGOF”. Golconda Gold’s management team is comprised of

senior mining professionals with extensive experience in managing mining and processing

operations and large -scale exploration programmes. Golconda Gold is committed to

operating at the highest standards, focused on the safety of its employees, respecting the

environment, and contributing to the communities in which it operates.

Notes:

(1) Cash cost is a non-GAAP measure. Refer to the table below and to “Supplemental

Information to the MD&A” for reconciliation to measure reported in the Company’s

financial statements.

FY 2025

Operating costs (US$) 18,738,781

Adjust for:

Depreciation and depletion (1,718,132)

Inventory movement 458,714

Total operating cash cost 17,479,363

Royalties (1,693,905)

Total operating cash cost excluding royalties 15,785,458

Gold production (contained ozs) 13,020

Gold production (payable ozs) 10,292

Total operating cash cost excluding royalties per

payable oz 1,534

(2) This is forward-looking information and is based on a number of assumptions. See

“Cautionary Notes”.

Cautionary Notes

Certain statements contained in this press release constitute “forward -looking

statements”. All statements other than statements of historical fact contained in this press

release, including, without limitation, those statements regarding the Company’s

expectation that mining operations will recommence at the Summit Property in the second

quarter of 2026 , and the Company’s future financial position and results of operations,

strategy, proposed acquisitions, plans, objectives, goals and targets, and any stat ements

preceded by, followed by or that include the words “believe”, “expect”, “aim”, “intend”,

“plan”, “continue”, “will”, “may”, “would”, “anticipate”, “estimate”, “forecast”, “predict”,

“project”, “seek”, “should” or similar expressions or the negative thereof, are forward -

looking statements. These statements are not historical facts but instead represent only

the Company’s expectations, estimates and projections regarding future events. These

statements are not guarantees of future performance and invol ve assumptions, risks and

uncertainties that are difficult to predict. Therefore, actual results may differ materially

from what is expressed, implied or forecasted in such forward-looking statements.

Additional factors that could cause actual results, performance or achievements to differ

materially include, but are not limited to the risk factors discussed in the Company’s

management’s discussion and analysis for the year ended December 31, 202 5.

Management provides forward-looking statements because it believes they provide useful

information to investors when considering their investment objectives and cautions

investors not to place undue reliance on forward-looking information. Consequently, all of

the forward -looking statements made in this press release are qualified by these

cautionary statements and other cautionary statements or factors contained herein, and

there can be no assurance that the actual results or developments will be realized or, even

if substantially realized, that they will have the expected consequences to, or effects on,

the Company. These forward -looking statements are made as of the date of this press

release and the Company assumes no obligation to update or revise them to reflec t

subsequent information, events or circumstances or otherwise, except as required by law.

Information of a technical and scientific nature that forms the basis of the disclosure in

the press release has been approved by Kevin Crossling Pr. Sci. Nat., MAusIMM. Geological

Consultant for Golconda Gold, and a “qualified person” as defined by Nation al Instrument

43-101. Mr. Crossling has verified the technical and scientific data disclosed herein and

has conducted appropriate verification on the underlying data.

Neither the TSX Venture Exchange nor its regulation services provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the

adequacy or accuracy of this release.

For further information please contact:

Ravi Sood

CEO, Golconda Gold Ltd.

+1 (647) 987-7663

[email protected]

www.golcondagold.com