GFG Hits Multiple, Shallow Lenses at Montclerg Gold System including 12.8 Metres of 3.09 g/t Gold
Media Release
TSX.V: GFG | OTCQB: GFGSF
GFG Hits Multiple, Shallow Lenses at Montclerg Gold System including
12.8 Metres of 3.09 g/t Gold
KEY HIGHLIGHTS:
• Hole MTC -23-060 intercepted multiple near-surface lenses in the bulk tonnage MC Main Zone
including 24.9 metres (“m”) of 1.05 grams of gold per tonne (“g/t Au”) and 41.8 m of 0.92 g/t Au at the
Montclerg Gold Project (“Montclerg” or the “Project”).
• Hole MTC-23-062 returned one of the highest-grade intercepts drilled to-date within the bulk-tonnage
style Main Zone of 3.09 g/t Au over 12.8 m and 1.16 g/t Au over 12.8 m near surface.
• Assay results (8 holes) from the Aljo Mine Target (“Aljo”) remain pending.
• Drilling is planned to resume in the first quarter with a primary focus at Montclerg and testing high-
priority targets across the Goldarm Property.
January 17, 20 24, Saskatoon, Saskatchewan, Canada: GFG Resources Inc. (TSXV: GFG ) (OTCQB:
GFGSF) (“GFG” or the “Company”) reports further gold assay results from the recently completed 2023 Phase 2
drill program at its Montclerg Gold Project, located 40 kilometres (“km”) east of Timmins, Ontario (see Tables 1-
2 and Figures 1-6). The results released today are from two infill holes and two step-out holes completed along the
Montclerg gold system where GFG has continuously proven and grown a robust gold system since the Company
acquired the asset in October 2021.
In the Phase 2 drill program the Company completed a total of 3,613 m from 15 holes (7 at Montclerg and 8 at
Aljo). The program focused on step- out and in-fill drilling at Montclerg and test ed a spectrum of targets at Aljo
located within the Goldarm Property east of Timmins, Ontario. The Company eagerly anticipates releasing the
remaining 8 holes from Aljo in the coming weeks as several zones of gold mineralization were observed in core
logging.
"To date, our Phase 2 drill program at Montclerg has been a resounding success, proving a robust gold system with
multiple high-grade and bulk tonnage gold zones across the Main zones, as well as the Footwall zones,” stated Brian
Skanderbeg, President and CEO of GFG. “The consistency of the results from both step-out and infill drilling
demonstrate not only the strong continuity of the system but also the significant expansion potential at depth and
along strike. In addition to strong results , the infill drilling has been critical in confirming the geometry and
coherence of these mineral systems at shallow depths.
Moreover, we await the assay results from Aljo with great anticipation, as the core logging has indicated several
promising zones of gold mineralization. Our team is highly motivated by these findings, and we are looking forward
to continuing to unlock the value of our strategically located assets for our shareholders."
Table 1: Most Recent Montclerg Gold Project Assay Results from the 2023 Phase 2 Drill Program
Hole ID From (m) To (m) Length (m) Au (g/t) Zone
MTC-23-058 100.9 102.9 2.0 1.60 Undefined
and 385.0 394.2 9.2 0.79 Lower Footwall
and 397.4 398.3 0.9 2.99 Lower Footwall
and 405.6 409.9 4.3 0.65 Lower Footwall
MTC-23-060 63.1 88.0 24.9 1.05 Upper Main
and 95.7 137.5 41.8 0.92 Lower Main
and 141.6 145.1 3.5 1.05 Lower Main
and 249.5 250.0 0.5 1.95 Lower Footwall
2
and 252.6 255.8 3.2 0.97 Lower Footwall
MTC-23-062 27.0 39.8 12.8 1.16 Upper Main
and 46.5 53.9 7.4 0.79 Upper Main
and 72.4 85.2 12.8 3.09 Upper Main
incl. 74.0 76.9 2.9 9.76
and 109.5 113.6 4.1 2.41 Upper Footwall
incl. 111.1 111.9 0.9 8.20
MTC-23-064 121.8 123.6 1.8 1.84 Undefined
and 371.3 376.6 5.3 0.66 Lower Footwall
*Drill intercepts are presented using a 0.20 g/t Au cut-off and as drilled length with a minimum 0.5 gram-metre product. Composites include
internal dilution of up to 3 m at grades less than 0.2 g/t Au. Included intervals are calculated using a 3 g/t cut-off at a minimum 5 gram-metre
product unless otherwise stated. True width is estimated to be 50 to 90% of drilled length.
Commentary on Assay Results
Anders Carlson, Vice President, Exploration of GFG commented, “These results demonstrate both the grade upside
within the Upper Main Zone as well as our commitment to drilling significant step -out holes at depth along the
Lower Footwall Zone where we believe we can further expand this gold system. Along with the results today, the
high-grade zone intersected earlier in the program in MTC-23-059 yielding 4.79 g/t Au over 12.8 m remains the
deepest hole drilled to-date at Montclerg and we’re very pleased with the structural and grade continuity observed
thus far.”
MTC-23-058 was drilled to test the dip extension of the Lower Footwall Zone (see Figures 3-5). The hole intersects
approximately 13 m of weak to moderate sericite-ankerite-silica alteration in mafic volcanic rocks with up to 15%
disseminated arsenopyrite and pyrite. Quartz-carbonate veins and veinlets are present throughout the zone yielding
0.79 g/t Au over 9.2 m and 2.99 g/t Au over 0.9 m . This zone is observed between two high-grade intercepts in
MTC-23-057 and MTC-23-059 that graded 10.21 g/t Au over 2.7 m including 16.20 g/t Au over 1.5 m and 4.79
g/t Au over 12.8 m including 10.05 g/t Au over 4.3 m , respectively. This hole, while lower grade than
those around it, confirms the increased thickness of the Lower Footwall Zone below 350 vertical metres,
supporting our belief that the local change in geology has had a positive impact on overall gold endowment
at depth.
MTC-23-060 was drilled to infill an area of the Main Zone and to test the upper extent of the Lower Footwall (see
Figures 3-5). The hole intersected approximately 80 m of moderate to strong sericite -ankerite-silica alteration in
the felsic volcanic-hosted Upper and Lower Main zones yielding intercepts of 1.05 g/t Au over 24.9 m and 0.92
g/t Au over 41.8 m, respectively, with up to 5% disseminated arsenopyrite and pyrite. Further downhole, the Lower
Footwall Zone was intersected yielding intercepts of 1.95 g/t Au over 0.5 m and 0.97 g/t Au over 3.2 m within 7
m of weak to moderate ankerite and silica-altered mafic volcanic rocks. This hole fills a gap in drilling within the
Main Zone and was successful in defining the upper extent of the Lower Footwall Zone, increasing our confidence
in the overall geological model.
MTC-23-062 targeted an area in the Upper Main Zone which hosted high-grade gold in historical holes drilled at
oblique angles and infill the Upper Footwall ( see Figures 3-6). The hole intersects 1.16 g/t over 12.8 m and 3.09
g/t Au over 12.8 m in the Upper Main Zone including a high-grade core of 9.76 g/t Au over 2.9 m. This represents
one of the highest -grade intercepts drilled to -date within the bulk- tonnage style Main Zone and lies 60 m below
surface. Further downhole, an intercept yielding 2.41 g/t Au over 4.1 m including 8.20 g/t Au over 0.9 m is
interested in the Upper Footwall Zone . These higher-grade infill holes are important as they show upside to the
overall resource grade while allowing us to define the upper margins of the Lower Footwall Zone.
MTC-23-064 is a 150 m step-out to the east of MTC-23-058 along the Lower Footwall Zone as noted above (see
Figures 3-5). The hole intersected approximately 7 m of weak to moderate sericite -ankerite-silica alteration in
mafic volcanic rocks with up to 7% disseminated arsenopyrite and pyrite. Quartz-carbonate veins and veinlets are
present throughout the zone yielding 0.66 g/t Au over 5.3 m . The hole also intersect s a hanging wall zone of
3
mineralization 250 m up-hole from the Lower Footwall Zone that grades 1.84 g/t Au over 1.8 m in similarly altered
mafic volcanic rocks. The presence of the Lower Footwall Z one, albeit low -grade in this hole , is important for
understanding the geological model and testing it beyond the current limits of the known deposit area. The intercepts
observed over the course of the 2023 Phase 2 drill program including the deep, high-grade intercept of MTC-23-
059 yielding 4.79 g/t Au over 12.8 m show that this system can be extended significantly at depth.
Outlook
Brian Skanderbeg, CEO of GFG commented, “As we look ahead to 2024, our C ompany is buoyed by the success
and the growth opportunities that have emerged within the Goldarm Property. With this optimism, we are gearing
up to resume drilling activities later in Q1 at Goldarm with a particular focus on Montclerg, Aljo and initia l first
pass drilling on several targets across Goldarm.
In tandem, at the Pen and Dore Gold Projects, our team is actively exploring avenues to progress these projects.
Our strategic approach is not only aimed at unlocking the inherent value of these district -scale land positions but
also at capitalizing on the diverse mineral potential they hold, encompassing gold, volcanogenic massive sulfide,
and nickel-copper prospects. We remain steadfast in our commitment to responsibly advance our portfolio and
deliver value to our stakeholders."
Figure 1: Regional Map of GFG Gold Projects in the Timmins Gold District
4
Figure 2: Goldarm Property Plan View Map
Figure 3: Montclerg Gold Project Plan View Map
5
Figure 4: Montclerg Gold Project MC Central Plan View Map
Figure 5: Montclerg Gold Project Cross Section Map
6
Figure 6: MTC-23-062 High Grade Gold Zone of 9.76 g/t Au over 2.09 m (74.0m to 76.9 m)
Table 2: GFG Drill Hole Assay Highlights from the Montclerg Gold Project
Hole ID From (m) To (m) Length (m) Au (g/t) Zone
MTC-21-001 62.5 90.0 27.5 1.56 Upper Main
and 126.0 166.5 40.5 0.78 Lower Main
incl. 130.8 138.0 7.3 2.20
MTC-21-004 39.8 64.0 24.2 0.73 Upper Main
and 75.7 86.1 10.4 1.24 Lower Main
incl. 81.0 85.1 4.1 2.37
and 230.5 246.0 15.5 1.23 Lower Footwall
incl. 241.7 245.0 3.3 3.09
MTC-21-005 86.0 112.0 26.0 4.82 Upper Footwall
incl. 94.3 96.1 1.8 15.96
and 103.8 109.3 5.5 12.32
and 118.9 120.6 1.7 11.29
MTC-21-006 98.3 105.8 7.5 8.34 Upper Footwall
incl. 98.3 101.0 2.7 15.04
MTC-21-007 65.4 95.6 31.1 1.40 Upper Main
and 108.0 131.0 23.0 1.11 Lower Main
MTC-21-009 45.0 60.0 15.0 1.23 Upper Main
MTC-21-010 79.5 106.5 27.0 1.05 Upper Main
incl. 89.6 100.5 10.9 1.84
MTC-22-015 24.0 57.5 33.5 1.32 MC West
incl. 24.0 28.7 4.7 5.15
MTC-22-018 52.0 57.9 5.9 3.51 MC West
incl. 53.9 56.0 2.1 7.93
MTC-22-019 112.6 118.1 5.5 4.38 Upper Footwall
incl. 112.6 116.0 3.4 6.37
MTC-22-020 22.4 34.1 11.7 1.07 Upper Main
and 97.0 105.3 8.3 4.95 Upper Footwall
incl. 102.8 105.3 2.5 12.83
MTC-22-021 50.3 72.0 21.7 1.51 Upper Main
incl. 62.2 64.0 1.8 8.17
7
MTC-22-023 17.6 88.0 70.4 1.60 Upper Main
incl. 35.2 42.0 6.8 2.43
incl. 76.2 81.0 4.8 4.97
and 124.5 133.2 8.7 2.46 Upper Footwall
incl. 131.4 133.2 1.8 7.75
MTC-22-029 104.4 111.5 7.1 4.98 Upper Footwall
incl. 104.4 107.6 3.2 7.02
incl. 110.4 111.5 1.1 7.79
MTC-22-030 71.0 86.0 15.0 3.40 Upper Footwall
incl. 71.0 74.0 3.0 6.21
also incl. 81.9 82.9 1.0 17.50
MTC-22-031 285.2 292.6 7.4 2.78 Lower Footwall
incl. 290.3 292.6 2.3 7.83
and 300.4 302.0 1.6 4.59 Lower Footwall
MTC-22-034 79.5 94.6 14.5 1.37 Lower Main
incl. 85.2 86.8 1.6 3.97
and 161.7 171.0 9.3 5.26 Upper Footwall
incl. 163.9 168.3 4.4 10.77
MTC-22-035 72.0 85.2 13.2 2.31 Lower Main
incl. 77.0 82.1 5.1 4.07
and 125.3 141.3 16.0 9.85 Upper Footwall
incl. 130.3 137.8 7.5 14.99
MTC-22-036 79.0 85.0 6.0 9.63 Upper Footwall
incl. 80.5 84.0 3.5 15.40
MTC-22-039 79.8 83.3 3.3 4.32 Upper Footwall
incl. 80.7 83.3 2.6 5.74
and 88.0 98.3 10.3 3.95
MTC-22-041 76.2 81.0 4.8 4.89 Upper Footwall
incl. 81.0 80.1 1.1 14.40
MTC-22-042 96.4 119.0 22.6 1.48 Lower Main
and 307.3 312.3 5.0 8.46 Lower Footwall
incl. 309.3 312.3 2.0 16.40
ALJ-22-002 62.1 75.0 12.9 3.03
incl. 67.5 68.1 0.6 59.80
and 79.0 93.9 14.9 1.32
incl. 85.3 86.2 0.9 10.90
and 101.0 105.3 4.3 6.58
incl. 103.2 104.2 1.0 27.40
MTC-23-048 88.0 92.1 4.1 4.10 Upper Footwall
incl. 89.8 92.1 2.3 6.30
MTC-23-054 73.1 81.2 8.1 9.97 Upper Footwall
incl. 75.9 78.9 3.0 16.95
MTC-23-057 254.5 256.8 2.3 2.25
8
and 346.0 348.7 2.7 10.21 Lower Footwall
incl. 346.0 347.5 1.5 16.20
and 375.5 376.7 1.2 2.42 Lower Footwall
incl. 375.5 376.2 0.7 3.84
MTC-23-060 63.1 88.0 24.9 1.05 Upper Main
and 95.7 137.5 41.8 0.92 Lower Main
MTC-23-062 72.4 85.2 12.8 3.09 Upper Main
incl. 74.0 76.9 2.9 9.76
*Drill intercepts are presented using a 0.20 g/t Au cut-off and as drilled length with a minimum 0.5 gram-metre product. Composites include
internal dilution of up to 3 m at grades less than 0.2 g/t Au. Included intervals are calculated using a 3 g/t cut-off at a minimum 5 gram-metre
product unless otherwise stated. True width is estimated to be 50 to 90% of drilled length.
**Calculated at a 5 g/t cut-off.
About the Goldarm Property
The Goldarm Property is a large and highly prospective land package east of the Timmins Gold Camp (see Figures
1-2). The consolidated Goldarm Property covers approximately 30 km of the Pipestone Deformation Zone and the
North Pipestone Deformation Zone. Within the Goldarm Property, there are several highly prospective gold targets
such as the Aljo Gold Mine region, the Carr target , and the Montclerg Gold Project ;which is the most advanced
target. The Montclerg Gold Project covers 10 km of the highly prospective Pipestone Deformation Zone and is
located 48 km east of the prolific Timmins Gold Camp and is adjacent to multiple current and historic gold mines
(see Figure 1).
About GFG Resources Inc.
GFG is a North American precious metals exploration company focused on district scale gold projects in tier one
mining jurisdictions, Ontario and Wyoming. In Ontario, the Company operates three gold projects, each large and
highly prospective gold properties within the prolific gold district of Timmins, Ontario, Canada. The projects have
similar geological settings that host most of the gold deposits found in the Timmins Gold Camp which have
produced over 70 million ounces of gold. The Company also owns 100% of the Rattlesnake Hills Gold Project, a
district scale gold exploration project located approximately 100 km southwest of Casper, Wyoming, U.S.
For further information, please contact:
Brian Skanderbeg, President & CEO
or
Marc Lepage, Vice President, Business Development
Phone: (306) 931-0930
Email: [email protected]
Website: www.gfgresources.com
Stay Connected with Us
Twitter: @GFGResources
LinkedIn: https://www.linkedin.com/company/gfgresources/
Facebook: https://www.facebook.com/GFGResourcesInc/
Footnote:
(1) Drill intercepts are historical and GFG’s QP has not verified the laboratory accreditation, analytical method,
sample size or QA/QC procedures utilized for the historic drill results. True widths have not been estimated.
Potential quantity and grade is conceptual in nature. There has been insufficient exploration to define a Mineral
Resource on the Coulson Claims to date and it is uncertain if further exploration will result in the Coulson Claims
being defined as a Mineral Resource.