Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GEMC.V ·

Powered BY Cobalt … Driven BY Demand Global Energy Metals Mobilizes Field Crew to Ground Truth New Cobalt, Copper, Nickel Targets at the Lovelock and Treasure Box Projects

Exploration Programs

TSX.V GEMC

www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St. Vancouver,

BC

V6B 1R8

T +1.604.688.4219

TwiGer @EnergyMetals

Powered by Cobalt … Driven by Demand

GLOBAL ENERGY METALS MOBILIZES FIELD CREW TO GROUND

TRUTH NEW COBALT, COPPER, NICKEL TARGETS AT THE LOVELOCK

AND TREASURE BOX PROJECTS

Vancouver, BC / TheNewswire / September 13, 2022 / Global Energy Metals

CorporaUon TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1 (“Global Energy

Metals” , the “Company” and/or “GEMC”), a company involved in investment

exposure to the baGery metals supply chain, is pleased to provide an update

on exploraNon plans for its Lovelock and Treasure Box projects (the

“Projects”) in the SNllwater Range in Nevada. Following recent idenNficaNon

of new cobalt, copper and nickel targets by Earthlabs Inc., formerly GoldSpot

Discoveries Corp. (TSX-V:SPOT | OTCQX:SPOFF) (“Earthlabs”) the Company has

engaged Dahrouge Geological ConsulNng USA Ltd. (“Dahrouge Geological”) for

mineral exploraNon acNviNes at the Projects. Dahrouge Geological is now on

site and carrying out a number of exploraNon iniNaNves to ground truth the

Earthlabs’ findings and further define the scale and scope of the prospecNve

Nevada-based baGery metals projects.

Highlights:

•Earthlabs was engaged to apply their proprietary machine learning ap -

plicaNons (“AI”) and geoscience experNse to assist the Company in expand-

ing discoveries and idenNfying new high-priority target areas;

•A total of 30 exploraNon targets have been idenNfied, 15 on the Lovelock

Project and 15 targets idenNfied on the Treasure Box Project;

•In preparaNon for field work, Earthlabs provided a map of probable target

zones, resulNng from the AI analysis allowing for Nme-and cost-efficient field

exploraNon; and

•Dahrouge Geological has been engaged and is on site conduc Nng a field

program to field check the exploraNon target areas presented to help con-

firm lithologies validate and prioriNze the targets generated by Earthlabs.

•The field program is planned to "ground truth" the results of the above

studies prior to selecNng drilling targets.

Mitchell Smith President and Chief ExecuUve officer stated:

"The explora,on work completed to date has iden,fied mul,ple high priority

targets exhibi,ng cobalt, nickel and copper mineraliza,on. The Dahrouge

Geological team have a tremendous track record of discovery and we

welcome their involvement in leading this field work at our Nevada projects.

The objec,ve of this current program is to locate and map the geology of the

area overlying targets generated by Earthlabs’ proprietary AI technology

improving drilling efficiency and chance of success."

The mapping program is planned to cover the two target areas to be Ger

understand the geology, structural trends, and mineralizaNon controls within

these high priority areas. This work will focus on mapping lithology,

alteraNons, and mineral associaNons and assess the potenNal of a larger

mineralized system. This work will also support and poten Nally modify the

proposed drill program for the Treasure Box project as announced previously.

Figure 1. Sulfide sample taken (top leM) from old working (boOom leM).

Intermediate intrusive unit (top right) taken from the outcrop on the boOom

right. Lovelock project, Nevada, USA.

About Lovelock

Lovelock currently consists of 81 unpatented lode claims in the CoGonwood

Canyon area of the S Nllwater Range totaling approximately 1,586 acres

(642 hectares). It was discovered by George Lovelock and Charles Bell about

1880. According to U.S. Government annual reports, the Lovelock Mine saw

limited producNon of nickel, copper and cobalt beginning in 1883. The

primary cobalt mineral was idenNfied as “cobalNte”. The general average of

the 200 tons shipped in 1886 averaged 14 percent cobalt and 12 percent

nickel. The mine operated from 1883 to 1890 to the 100 foot level, reporNng

500 tons of cobalt and nickel mineralized material shipped to England for

processing. Aler intermiGent producNon, an English company aGempted

smelNng on site in 1898 but li Gle or no producNon was made (Source:

“Mineral Resources of the United States for 1885” , 1886). No further

producNon from the Lovelock Mine is known for well over a century providing

GEMC an excellent opportunity to unlock the potenNal value of the deposit

through exploraNon work. In a recent drill program at Lovelock by GEMC,

elevated values of cobalt, nickel and copper were intercepted in three of the

holes which targeted possible mineralizaNon beneath the historical mine

workings.

About Treasure Box

Treasure Box hosts mine workings from limited copper produc Non, which

occurred unNl early into the 20th century. A historical diamond drill hole (circa

1910) drilled at the Treasure Box by the Boyer-Nevada Copper Company

reportedly intersected 1.52% copper over 85 feet (25.9 metres) with

mineralizaNon beginning at surface. A reverse circulaNon hole drilled on the

Treasure Box by Utah InternaNonal in 1976 returned 1.55% copper over 40

feet (12.2 metres) from a depth of 85 to 125 feet (25.9 to 38.1 metres), and

the hole was stopped in chalcopyrite mineralizaNon. The core Treasure Box

claims were held conNnuously for over 20 years by a private company but

were relinquished in September 2017, leading to their acquisiNon by Nevada

Sunrise. GEMC received approval from the US Bureau of Land Management

(the “BLM”) for a proposed exploraNon and drill plan at the Treasure Box

project that includes up to thirteen (13) verNcal drill holes from thirteen (13)

different locaNons. Planned drill hole lengths range from 350 feet (107

metres) to 500 feet (152 metres). Total drilling is anNcipated to be 5,850 feet

(1,784 meters), with a minimum drilling length of three (3) drill holes totaling

1,350 feet (412 metres). Depending on findings, individual drill hole lengths

could be extended by 30 to 50 feet (10 to 15 metres) as determined by the

company’s on-site representaNve. The targeted prospects have been

idenNfied by Global Energy Metals through a systemaNc exploraNon program

over the past several months that has included an airborne magneNc survey,

reinterpretaNon of historical Induced PolarizaNon (IP) data, detailed mapping

and desktop review of historical data including past drilling.

About Dahrouge Geological

Dahrouge Geological is a North American mineral exploraNon, consulNng, and

project management group with offices in Canada and the United States. They

provide professional geological, logisNcal, and project management services

to the world’s mining and mineral resource industry including project

generaNon, program design, geophysics, project evalua Non, geology &

resources, as well as mine engineering and geotechnics.

Qualified Person

Mr . Paul Sarjeant, P . Geo., is the qualified person for this release as defined by

NaNonal Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Global Energy Metals Corporation

(TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1)

Global Energy Metals Corp. o ffers investment exposure to the growing

rechargeable baOery and electric vehicle market by building a diversi fied

global porUolio of explora,on and growth-stage baOery mineral assets.

Global Energy Metals recognizes that the prolifera ,on and growth of the

electrified economy in the coming decades is underpinned by the availability

of baOery metals, including cobalt, nickel, copper, lithium and other raw

materials. To be part of the solu ,on and respond to this electri fica,on

movement, Global Energy Metals has taken a ‘consolidate, partner and invest’

approach and in doing so have assembled and are advancing a por Uolio of

strategically significant investments in baOery metal resources.

As demonstrated with the Company’s current copper, nickel and cobalt

projects in Canada, Australia, Norway and the United States, GEMC is

inves,ng-in, exploring and developing prospec ,ve, scaleable assets in

established mining and processing jurisdic,ons in close proximity to end-use

markets. Global Energy Metals is targe,ng projects with low logis,cs and

processing risks, so that they can be fast tracked to enter the supply chain in

this cycle. The Company is also collabora ,ng with industry peers to

strengthen its exposure to these cri ,cal commodi,es and the associated

technologies required for a cleaner future.

Securing exposure to these cri,cal minerals powering the eMobility revolu,on

is a genera,onal investment opportunity. Global Energy Metals believes Now

is the Time to be part of this electrifica,on movement.

For Further InformaUon:

Global Energy Metals CorporaNon

#1501-128 West Pender Street

Vancouver, BC, V6B 1R8

Email: [email protected]

t. + 1 (604) 688-4219

www.globalenergymetals.com

TwiGer: @EnergyMetals | @USBaGeryMetals | @ElementMinerals

CauUonary Statement on Forward-Looking InformaUon:

Certain informa,on in this release may cons,tute forward-looking statements

under applicable securi,es laws and necessarily involve risks associated with

regulatory approvals and ,melines. Although Global Energy Metals believes

the expecta,ons expressed in such forward-looking statements are based on

reasonable assump,ons, such statements are not guarantees of future

performance and actual results or developments may differ materially from

those in the forward-looking statements. Except as required by law, the

Company undertakes no obliga ,on to update these forward-looking

statements in the event that management’s beliefs, es,mates or opinions, or

other factors, should change.

GEMC’s opera,ons could be significantly adversely affected by the effects of a

widespread global outbreak of a contagious disease, including the recent

outbreak of illness caused by COVID-19. It is not possible to accurately predict

the impact COVID-19 will have on opera,ons and the ability of others to meet

their obliga,ons, including uncertain,es rela,ng to the ul,mate geographic

spread of the virus, the severity of the disease, the dura,on of the outbreak,

and the length of travel and quaran,ne restric,ons imposed by governments

of affected countries. In addi,on, a significant outbreak of contagious diseases

in the human popula,on could result in a widespread health crisis that could

adversely affect the economies and financial markets of many countries,

resul,ng in an economic downturn that could further affect opera,ons and

the ability to finance its opera,ons.

For more informa,on on Global Energy and the risks and challenges of their

businesses, investors should review the filings that are available at

www.sedar.com.

Neither TSX Venture Exchange nor its Regula,on Services Provider (as that

term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

We seek safe harbour.