Powered by Cobalt … Driven by Demand GLOBAL ENERGY METALS ADVANCES INFILL AND EXTENSION DRILLING AT THE MILLENNIUM COBALT PROJECT IN AUSTRALIA

Exploration Programs

TSX.V GEMC


www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St. Vancou-

ver , BC

V6B 1R8

T +1.604.688.4219

Twitter @EnergyMetals

Powered by Cobalt … Driven by Demand

GLOBAL ENERGY METALS ADVANCES INFILL AND

EXTENSION DRILLING AT THE MILLENNIUM COBALT

PROJECT IN AUSTRALIA

Vancouver, BC / TheNewswire / February 21, 2018 / Global Energy

Metals Corp. TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1 (“Global

Energy Metals”, the “Company” and/or "GEMC") is pleased to

announce that drilling is again underway at the Millennium Cobalt

Project in Mt. Isa, Queensland Australia (“Millennium”). Partner

Hammer Metals is overseeing drill operations.

Paul Sarjeant, VP Projects was on site for the resumption of drilling

this week as part of the first phase exploration program that

continues to focus on infill drilling of existing mineralized zones and

exploring potentially new discoveries and extensions in the immediate

area of Millennium. Drilling completed in December intersected very

wide and significant cobalt and copper grades potentially expanding

the existing JORC resource area.

Mr. Sarjeant had the following to say from site, “We are excited to

be back drilling under blue skies at the Millennium Cobalt Project

and look forward to sharing the findings as we continue to grow the

resource area and understanding. We expect to extend this campaign,

subject to results.”

Figure 1. Drilling in Progress at the Millennium Cobalt Project

Figure 2. Infill Drilling Mineralized Zones at the Millennium Cobalt

Project

Figure 3. Loading Core Rods into Drill Rig at the Millennium Cobalt

Project

The Company has an option to earn a 75% interest in Millennium by

spending exploration expenditures totaling $2,500,000 over the next

three years. At the conclusion of this Phase 1 drill program, the

Company will have spent the required $500,000 on the project to earn

an initial 25% interest in the project.

For additional details on the program, please refer to the Company’s

news release dated February 1, 2018.

The Millennium Cobalt Project:

Millennium is an advanced staged cobalt project with a large defined

zone of cobalt-copper mineralisation which remains open at depth

and along strike. Hammer Metals completed a JORC 2012 Resource

estimate in late 2016 and reported 3.1 million tonnes of Inferred

Resources* grading 0.14% Co, 0.34% Cu and 0.12 g/t Au (using a CuEq

cut-off of 1.0%). Under Canadian reporting standards this resource is

considered a “historic estimate”. The 2016 JORC resource estimate

completed by Hammer Metals Ltd. outlined a mineralised zone over a

strike length of approximately 1.5 km.

Cobalt-copper mineralisation is associated with shear zones hosted

within a sequence of volcanic and sedimentary units. Additional

mapping, soil geochemistry and rock sampling has identified an

additional 1.5 km of anomalous cobalt-copper mineralisation in

geological analogues that occur along a potential strike extension in

the northern half (“Northern Target”) of the tenement package. This

area has not been tested with any drilling to date. The Northern

Target provides excellent opportunity to increase the overall resource

potential of the Millennium project.

To date the project area has been tested by only 63 drill holes

(percussion, RC and diamond) for a total of 7,891 metres. Most holes

have been drilled within 200 metres of surface, with few holes

reaching to depths greater than 250 metres below surface. At present

mineralisation remains open at depth along the strike extent of the

JORC resource area.

For additional information on the Millennium project option please

refer to press release dated September 25, 2017 and/or refer to

Global Energy Metals’ website www.globalenergymetals.com.

Qualified Person

Mr. Paul Sarjeant, P . Geo., the Company’s VP Projects and Director, is

the qualified person for this release as defined by National Instrument

43-101 - Standards of Disclosure for Mineral Projects and has reviewed

and verified the technical information contained herein.

Global Energy Metals Corporation

(TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1)

Global Energy Metals is focused on offering security of supply of

cobalt, a critical material to the growing rechargeable battery

market, by building a diversified global portfolio of cobalt assets

including project stakes, projects and other supply sources. GEMC

anticipates growing its business by acquiring project stakes in battery

metals related projects with key strategic partners. Global Energy

Metals currently owns and is advancing the Werner Lake Cobalt Mine

in Ontario, Canada and has entered into an agreement to earn-in to

the Millennium Cobalt Project in Mt. Isa, Australia.

For Further Information:

Global Energy Metals Corporation

#1501-128 West Pender Street

Vancouver, BC, V6B 1R8

Email: [email protected]

t. + 1 (604) 688-4219 extensions 236/237

Cautionary Statement on Forward-Looking Information:

Certain information in this release may constitute forward-looking

statements under applicable securities laws and necessarily involve

risks associated with regulatory approvals and timelines. Although

Global Energy Metals believes the expectations expressed in such

forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance and actual

results or developments may differ materially from those in the

forward-looking statements. Except as required by law, the Company

undertakes no obligation to update these forward-looking statements

in the event that management’s beliefs, estimates or opinions, or

other factors, should change. For more information on Global Energy

and the risks and challenges of their businesses, investors should

review the filings that are available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as

that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

We seek safe harbour.