Powered by Cobalt … Driven by Demand DRILLING CONFIRMS MINERALISATION AT DEPTH AT THE WERNER LAKE COBALT PROJECT IN ONTARIO, CANADA

Exploration Programs

TSX.V GEMC


www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St. Vancou-

ver , BC

V6B 1R8

T +1.604.688.4219

Twitter @EnergyMetals

Powered by Cobalt … Driven by Demand

DRILLING CONFIRMS MINERALISATION AT DEPTH AT THE

WERNER LAKE COBALT PROJECT IN ONTARIO, CANADA

Vancouver, BC / TheNewswire / October 29, 2018 / Global Energy

Metals Corporation TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1

(“Global Energy Metals”, the “Company” and/or “GEMC”) is

pleased to announce that following the successful completion of a

phase 1 exploration program that partner Marquee Resources Limted

(“Marquee”) has confirmed encouraging consistency of data from

previous drill campaigns at the Werner Lake Cobalt project (“Werner

Lake” and/or the “Project”) located in Ontario, Canada.

The multi-phase Werner Lake exploration program is part of a $2.5

million commitment to advance the project and is being solely funded

by Marquee for their earn-in of up to 70% interest in the Project.

Global Energy Metals currently owns 100% of the Werner Lake Project.

Phase 2 drill campaign has intersected further extensions to cobalt

sulphide mineralisation:

•0.55 m @ 0.534% Co from 202.75 m and 0.73 m @ 0.159% Co from

210.20 m in WL 18-08.

•0.89 m @ 0.365% Co from 253.86 m from 253.86 in WL 18-09.

•1.26 m @ 0.299% Co from 279.23 in WL 18-12.

•3.90 m @ 0.214% Co from 346.00 m, including 2.00 m @ 0.339% Co in

WL 18-13.

•Marquee has now completed 18 holes for 4,800 m at the Werner

Lake Project with assays for drill holes WL 18-14 through WL 18-16

anticipated shortly.

•Five metallurgical drill holes for 452m have also been completed

with met-test work underway.

Paul Sarjeant, VP Projects commented:

“These latest results further confirm the presence of extensive

cobalt sulphide mineralisation at the Werner Lake deposit. We are

particularly encouraged by the results of holes WL 18-12 and WL

18-13 which were some of the deepest holes drilled at the project

and indicate that the mineralisation does infact extend to depth and

down plunge as suggested by previous work campaigns at the project.

We look forward to reporting the next holes of the phase 2 drill

program shortly as our partner move towards updating the cobalt

resource at Werner Lake.”

Table 1: Significant Diamond Drill Results - Werner Lake

WL 18-08 was drilled on section 359,840 E (Figure 1) and was designed

to infill between mineralised intercepts drilled during the 2009-2010

drill program by Puget Ventures and drilling by Camine Resources in

1996-1997. The hole successfully intersected a sequence of the

“Mixed Unit” over approximately 11 m core length. The hole

returned two significant intercepts; 0.534% Co over 0.55 m (from

202.75 m) and 0.159% Co over 0.73 m, from 210.2 m (Table 1). These

intercepts correlate well with historical drill holes WL-10-28 (0.404%

Co over 1.69 m; from 233.11 m) and will help to confirm the

mineralised zone on this section.

Drill Hole From (m)To (m) Intercept

(m)*

Co (%)Cu (%)

WL 18-08 202.75 203.30 0.55 0.534 0.221

210.20 210.93 0.73 0.159 0.928

WL 18-09 253.86 254.75 0.89 0.365 0.296

WL 18-10 168.60 170.00 1.40 0.086 0.237

WL 18-11 NSR NSR

WL 18-12 279.23 280.49 1.26 0.299 0.363

WL 18-13 346.00 349.90 3.90 0.214 0.120

Incl.346.00 348.00 2.00 0.330 0.126

*Intercept lengths are core length and not necessarily represent true width. Where possible, drill

holes have been designed to intersect expected zones of mineralisation as close as possible to

perpendicular.

Figure 1: Simplified Cross Section 359.840 E

WL 18-09 was drilled on section 359,870 E (Figure 2) and was

designed to infill between sections and to extend mineralisation down

plunge. A wide zone of the “Mixed Unit” with varying amounts of

disseminated sulphides was encountered. The most significant

intercept in the hole was 0.365% Co over 0.89 m, from 253.86 m

(Table 1). Two other zones of copper mineralisation with anomalous

cobalt were also intercepted. The results confirm the presence of the

mineralised zone and will successfully fill a gap in the current

resource model.

Figure 2: Simplifed Cross Section 359,870 E.

WL 18-10 was drilled on section 359,930 E (Figure 3) and to test a

potential gap in mineralisation approximately 150 m below surface.

The targeted “Mixed Unit” with disseminated sulphide mineralisation

was encountered at 138 m down hole and again at 158 m down hole.

Both zones returned narrow intercepts with copper mineralisation

(Table 1). The hole successfully hit the prospective targeted unit(s),

but cobalt mineralisation was not strong. Results are consistent with

historical values in this area.

Figure 3: Simplified Section 359,930 E

WL 18-11 was drilled on section 359,700 E (Figure 4) and was designed

to extend to depth the excellent intercept in WL 18-07 (0.660% Co

over 5.5 m: previously reported). A wide zone of the “Mixed Unit”

was encountered from 295.6 to 309.75 m down hole with 1%

disseminated pyrite and pyrrhotite throughout. Though the drill hole

successfully drilled the target horizon where anticipated, there were

no significant cobalt values returned in this drill hole.

Figure 4: Simplified Section 359,700 E

WL 18-12 and WL 18-13 were drilled on section 360,060 E (Figure 5)

and were designed to test the down dip and down plunge of

mineralisation below the current resource area. These holes are the

first attempt to drill to depth (+250 m) at the eastern end of the

Minesite Zone and test the down plunge concept that Canmine

Resources had postulated during their work in the late 1990’s. Both

drill holes intersected the targeted “Mixed Unit” approximately

where expected suggesting the key geological units extend to depth.

WL 18-12 returned 0.299% Co over 1.26 m, from 279.23 m (Table 1)

which represents a 50 m extension to know mineralisation below

historic hole J-130 (0.453% Co over 1.07 m). WL 18-13 cut the same

section line approximately 300 m below surface and returned 0.339%

Co over 2.0 m, from 346.0 m within a broader zone of mineralisation

(Table 1). The results of these two drill holes give strong indication

that the mineralisation does extend to depth and down plunge as

suggested by Canmine. Additional drilling continues to test this deep

extension and those results will be reported once received.

Figure 5: Simplified Section 360,060 E

Marquee has now completed 18 holes for 4,800 m at the Werner Lake

Project as part of the phase one and two drilling campaigns (Figure

6). Results for hole WL 18-14 through WL 18-16 are pending and will

be reported when available.

Figure 6: Drill Location Plan Map

The Phase 1 campaign at Werner Lake was primarily focused on

narrow spaced drilling, which has been designed to increase the

existing Indicated Mineral Resource of 79,400 Tonnes at 0.43% Co that

remains open in all directions. Phase 2 drilling was intended to

extend mineralisation beneath the current resource area and test

potential down dip and down plunge extensions to the mineralisation

at Werner Lake. In addition to this exploration drilling, the Company

has just completed five drill holes for metallurgical purposes (452 m).

Sampling of these holes has been completed and samples have been

sent to AGAT Laboratories for analysis. Once these results have been

received, the Company will composite a bulk sample of approximately

150 kilograms for metallurgical work at SGS Laboratories Canada as

announced on October 17, 2018.