Powered BY Cobalt … Driven BY Demand Global Energy Metals Completes Initial Resource Report ON Its Canadian Primary Cobalt Project Supporting High Grade Cobalt Mineralisation

Resource Estimates

TSX.V GEMC

www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St.

Vancouver, BC

V6B 1R8

T +1.604.688.4219

Twitter @EnergyMetals

Powered by Cobalt … Driven by Demand

GLOBAL ENERGY METALS COMPLETES INITIAL RESOURCE REPORT

ON ITS CANADIAN PRIMARY COBALT PROJECT SUPPORTING HIGH

GRADE COBALT MINERALISATION

VANCOUVER, BC / TNW-ACCESSWIRE / SEPTEMBER 6, 2017 / GLOBAL

ENERGY METALS CORP. TSXV:GEMC | FSE:5GE1 (“Global Energy Metals”,

the “Company” and/or "GEMC") announces the completion of a National

Instrument 43-101 Resource Report (the “Report”) carried out by AGP Mining

Consulting Inc. (“AGP”) on the Werner Lake Cobalt Property (“Werner Lake”)

around the historic underground workings at the “Old Mine Site”, now

referred to as the Minesite Deposit and the West Cobalt Deposit.

Highlights:

• Indicated Resource of 0.51% Co (57,900 tonnes) and Inferred Resource of

0.48% Co (6,300 tonnes) at a 0.25% cut-off (see Table 1).

• Significant potential for increased tonnage at Werner Lake exists.

• Cobalt cut-off grade was estimated based on 3 year metal prices of USD

$15.60/lb.

• Cobalt is currently trading at USD $27.67/lb (MetalPrices.com, September 1,

2017), a 175% premium to the price used in this report.

• Drill program recommended to test for additional mineralization in areas of

the greatest potential.

• At present both the Minesite and West Cobalt deposits remain open at

depth and along strike.

Mitchell Smith, CEO:

“This report positions Global Energy as a leading project developer in the

competitive cobalt market – no other junior has an advanced primary cobalt

deposit in the region. The initial resource results supports the need for

further investment into the project as we identify high-calibre joint venture

partners for the cobalt deposit. Advancing Werner Lake with the right

partner will allow us to build on the value of the project and continue our

strategy of acquiring project stakes in other highly prospective projects.”

Paul Sarjeant, VP Projects commented on the results of the Report:

“We are very pleased with the work done by AGP and the results of the first

Ni 43-101 resource report on a Canadian primary cobalt deposit. This result

compares favourably with historic estimates. There is still excellent potential

down dip and along strike at the deposit to increase the mineralized envelope

and the next phase of exploration will address this opportunity”.

The Report was compiled from the extensive library of existing exploration

data assembled by GEMC. The estimate was completed based on the concept

of a small-scale underground operations for both the Old Mine and West

Cobalt Zones in order to update historic mineral resource estimates to meet

disclosure and reporting requirements set forth in National Instrument 43-

101. Mineral resources are estimated in accordance with the CIM Mineral

Resource definitions referred to in NI 43-101 Standards of Disclosure for

Mineral Projects.

Table 1: Mineral Resources for the Werner Lake Deposit at a 0.25% cut-off

grade.

Classification

Tonnage Co Cu Au Contained

Co

Contained

Cu

(‘000 t) (%) (%) (gpt) (‘000 lbs) (‘000 lbs)

Indicated 57.9 0.51 0.25 0.22 653 314

Inferred 6.3 0.48 0.14 0.24 67 20

Recommendation:

The Report has shown that further work is warranted at Werner Lake.

Several key recommendations have been made in order to advance the

development of the project, these include:

• A minimum of 16 drill holes (3,500 m) to further explore for and define the

known zone at depth and bring inferred resources to indicated category,

• Surface channel sampling over mineralized veins at surface to provide

greater confidence in mineral resource classification,

• Dewatering of the underground workings to provide access to underground

workings which will allow mapping and re-sampling of the existing

excavations, and

• Metallurgical test work to bring historic work to current standards.

AGP has recommended a drill program (see Figure 1) that identifies the

minimum drilling required to test lateral and depth extension of the current

mineralized envelope. Additional holes would be required to support

successful intercepts and bring areas of expected mineralization into CIM

compliant resource categories. Other drill holes recommended would target

zones within the resource area to upgrade resource confidence.

Figure 1. Proposed Drill Hole Locations; longitudinal section looking north

(60 m viewing corridor).

Grid is 200m x 200m

Notes on the Mineral Resource Estimate Parameters and Method:

• Mineral resources are estimated in accordance with the CIM Mineral

Resource definitions referred to in NI 43-101 Standards of Disclosure for

Mineral Projects. This mineral resource estimate has an effective date of

August 18, 2017 and was carried out by AGP Mining Consultants Inc. for the

Werner Lake Property that includes the Old Mine Zone and West Cobalt

Zone.

• The estimate was completed based on the concept of small-scale

underground operations for both the Old Mine and West Cobalt Zones.

• For the 1995 – 1997 and 2001 Canmine drill campaigns, the samples were

assayed at TSL Laboratories in Saskatoon, Saskatchewan. Samples were

crushed to a minimum of 70% passing a 10 mesh. The samples were then

riffle split to approximately 250 g, which was pulverized to 90% passing 100

mesh; and from 1997 passing 150 mesh. Co, Cu and As were digested in 20

ml HCl/HNO3 and then re-dissolved with 20% 3:1 HCl/HNO3. Assays over

5,000 ppm were analyzed by Atomic Absorption Spectrophotometry.

• For the 2010 Puget Ventures drill program, the samples were sent to

Accurassay Laboratories in Thunder Bay, Ontario. Sample preparation

consisted of crushing the samples to a minimum of 85% passing 10 mesh, a

500g split was pulverized to 90% passing 200 mesh (procedure APL1).

Platinum metals (Pt and Pd) and gold were analyzed using procedure code

APLPG1 which is a fire assay with atomic absorption spectrophotometry

(AAS) finish on 30 g. sub-sample. Samples were also analyzed for a suite of

30 elements using a multi -acid digestion (HNO3, HCl, HF, HClO4) with

Inductively coupled plasma atomic emission spectroscopy (ICP-OES) finish,

Cobalt West Deposit

Minesite Deposit

procedure code ALMA1. Accurassay laboratory in Thunder Bay declared

bankruptcy as of February 2017.

• AGP validated the assays in the database using historical records comprising

of internal Canmine assay compilation sheets, TSL laboratory original assay

certificates, ALS Chemex pulps re-assays laboratory certificates and

Accurassay’s laboratory certificates. In total, for all assays above 0.19%

cobalt, 94% of the values in the Geovia GEMS™ database were validated

against the original laboratory certificates. The remaining 6%, the values

were sourced from Canmine assay compilation sheets where the grades

likely originated from the TSL laboratory however, AGP cannot verify this

statement. AGP validation rate is lower for cobalt assays below 0.19%

which mostly includes material outside of the mineralized zones.

• The quality control and quality assurance program for the Puget Ventures

drilling consisted of regular insertion of blanks and standard reference

material obtained from a Canadian laboratory. AGP is aware that a portion

of the historical sample pulps analyzed at TSL laboratory were re-submitted

to ALS Chemex laboratory in Winnipeg Canada.

• The West Cobalt Zone was interpolated with 157 core holes completed by

Canmine and Puget Ventures from 1995 through to 2010, totaling 23,173

metres and containing 4,057 assay values. The Old Mine Zone was

interpolated with 109 drill holes completed by Canmine and Puget Ventures

from 1995 through to 2010 totaling 17,530 meters of drilling and containing

288 assay values.

• The construction of the mineralized wireframes targeted cobalt

mineralization grading 0.05% or above located preferably within the logged

West Cobalt zone (WCBZ) or the MINEZ code in the lithology table. The

wireframes were generally extended through non-mineralized drill holes as

long as there was indication that the zone was present. Wireframes

measuring less than 1.5m horizontally at the drill hole intercepts were

visually expanded to approach a 1.5m minimum mining width. The

mineralized wireframes more or less followed the direction indicated by the

hanging wall and footwall contact of the MIX Unit.

• Canmine preferentially sampled the drill core nominally between 0.5 and 1

m intervals. Puget Ventures mainly sampled the drill core at a nominal 1 m

intervals. Composite intervals were created across the mineralized

intersections to create a single composite per hole per intersection. The

average composite length was 4.9 m.

• For the treatment of outliers in the West Cobalt Zone, raw assays were

capped at 4.90 %Co and 4.48 %Cu. In the Old Mine Zone, raw assays were

capped at 6.76 % Co and 1.10 %Cu

• Specific Gravity (SG) in the resource model was derived from a suite of 56

core samples. The specific gravity measurements were carried out at ALS

Chemex using the pycnometer method. Since SNC Lavalin used a linear

equation to calculate the SG in the 2002 resource estimate, AGP elected to

retain the methodology with the following modifications;

• The linear regression was completed using the cobalt + copper

values.

• Since the back calculated SG did not match the original sample

distribution, an adjustment factor was introduced in the

calculation so that the distribution of the calculated SG in the

resource model matches the distribution of the original

samples at the 5th, 10th, 25th, 50th, 75th, 90th and 95th

percentile.

• A (3D) geological and block model was generated using GeoviaGEMS™

software. The block model matrix size of 5 m x 5 m x 1 m (width x length x

height) was selected was based on the size deemed suitable for an

underground mining scenario.

• Variography was carried out on the various domains of the Werner Lake

Deposit. Only one reliable variogram was produced based on the largest

mineralized vein (Domain WC2100) in the West Cobalt Zone. The ranges

from this variogram was used in determining search neighbourhoods for

the Werner Lake Deposit. The grade model was interpolated using inverse

distance cubed, and validated using ordinary kriging and nearest neighbour

models.

• The interpolation was carried out in three passes with increasing search

ellipsoid dimensions. For both zones, the classification was based primarily

on the number composites used to estimate a block and the distance to the

nearest composite. Isolated Inferred blocks within core areas of Indicated

resource blocks were captured within a closed polyline and upgraded to the

Indicated category.

• The Old Mine Zone was historically mined in 1950’s and the West Cobalt

Zone was explored via underground development and bulk sampling in the

1990’s. Historical records indicated that;

• In the West Cobalt Zone, Canmine (AIF, 1998) reported that

about 20,000 tonnes of cobalt bearing material was planned for

extraction and milling; and that approximately 10,000 tonnes

had been extracted by the end of 1997.

• In the Old Mine zone, Thomson (1950) reported that the shaft

accessing the underground workings was developed to a depth

of 100 feet. Carlson (1957) reported that approximately

143,000 lbs Co was removed.

• For the current resource estimate, AGP removed mined out material from

the current mineral resources. For the West Cobalt mine, a series mine

plans and one longitudinal section dated November 1998 were used to

digitize a 3D wireframe of the material assumed to be mined out. For the

Old Mine Zone, the resource model was sliced horizontally in 8 ft vertical

lift. Volume report for each of the slice was accumulated until 143,000 lbs

of Cobalt was reached. This determined the lower elevation of the mined-

out areas. AGP attempted to reasonably estimate the amount of material

mined-out and the likely location of the tunnels and stopes despite the poor

historical records. This is only an estimate and AGP cannot be certain if the

specific locations of the mined-out material is accurate or not.

• Metallurgical testwork on a flotation concentrate sample from the Werner

Lake deposit was carried out in 1997 at Lakefield Research (now SGS

Canada Inc.) in Lakefield, Ontario. The information available was reviewed

by AGP’s metallurgist and AGP noted that no information was provided in

the report on the specific origin of the concentrate sample, or the

flowsheet used to produce it.

• Under CIM definitions, Mineral Resources should have a reasonable

prospect of economic extraction. A cobalt price of US$ 15.60/ lb Co was

used for the cut-off calculation which corresponded to three year rolling

average seller’s price as of August 16, 2016. The cut-off calculation included

85% metallurgical recoveries based on the SNC Lavalin 2002 estimate. In

order to assess the Mineral Resources an in situ resource cut-off grade of

0.25% Co has been applied for potential material amendable to

underground extraction. The blocks above the cut-off were visually

examined to ensure they were coalescent in reasonable mining shapes.

• Mineral Resources that are not Mineral Reserves do not have demonstrated

economic viability.

• An Inferred Mineral Resource is that part of a Mineral Resource for which

quantity and grade or quality are estimated on the basis of limited

geological evidence and sampling. Geological evidence is sufficient to imply

but not verify geological and grade or quality continuity. An Inferred

Mineral Resource has a lower level of confidence than that applying to an

Indicated Mineral Resource and must not be converted to a Mineral

Reserve. It is reasonably expected that the majority of Inferred Mineral

Resources could be upgraded to Indicated Mineral Resources with

continued exploration.

• Rounding of tonnes as required by reporting guidelines may result in

apparent differences between tonnes, grade, and contained metal content.

• The 1997-1998 historical resource estimates pre-dating the 2002 SNC

Lavalin report that are circulating in the literature for the Werner Lake

project (Harper 2015) are considered not valid by AGP and therefore cannot

be compared.

Qualified Person

Mr. Paul Sarjeant, P. Geo., the Company’s VP Projects and Director, is the

qualified person for this release as defined by National Instrument 43-101 -

Standards of Disclosure for Mineral Projects and has reviewed and verified

the technical information contained herein.

Global Energy Metals Corporation (TSXV:GEMC | FSE:5GE1)

Global Energy Metals is focused on offering security of supply of cobalt, a

critical material to the growing rechargeable battery market, by building a

diversified global portfolio of cobalt assets including project stakes, projects

and other supply sources. GEMC anticipates growing its business by acquiring

project stakes in battery metals related projects with key strategic partners.

Global Energy Metals currently owns and is advancing the Werner Lake Cobalt

Mine in Ontario, Canada and has entered into an agreement to earn-in to the

Millennium Cobalt Project in Mt. Isa, Australia.

For Further Information:

Global Energy Metals Corporation

#1501-128 West Pender Street

Vancouver, BC, V6B 1R8

Email: [email protected]

t. + 1 (604) 688-4219 extensions 236/237

Cautionary Statement on Forward-Looking Information:

Certain information in this release may constitute forward-looking statements

under applicable securities laws and necessarily involve risks associated with

regulatory approvals and timelines. Although Global Energy Metals believes

the expectations expressed in such forward-looking statements are based on

reasonable assumptions, such statements are not guarantees of future

performance and actual results or developments may differ materially from

those in the forward-looking statements. Except as required by law, the

Company undertakes no obligation to update these forward-looking

statements in the event that management’s beliefs, estimates or opinions, or

other factors, should change. For more information on Global Energy and the

risks and challenges of their businesses, investors should review the filings

that are available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that

term is defined in the policies of the TSX Venture Exchange) accepts

responsibility for the adequacy or accuracy of this release.

We seek safe harbour.