Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GEMC.V ·

Powered by Cobalt … Driven by Demand INITIAL RESULTS FROM WERNER LAKE COBALT PROJECT CONFIRM HIGH GRADE COBALT MINERALISATION

Drill Results

TSX.V GEMC


www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St. Vancou-

ver , BC

V6B 1R8

T +1.604.688.4219

Twitter @EnergyMetals

Powered by Cobalt … Driven by Demand

INITIAL RESULTS FROM WERNER LAKE COBALT PROJECT

CONFIRM HIGH GRADE COBALT MINERALISATION

Vancouver, BC / TheNewswire / July 19, 2018 / Global Energy

Metals Corporation TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1

(“Global Energy Metals”, the “Company” and/or "GEMC") is pleased

to announce that partner Marquee Resources has received assay

results from the first two holes drilled at the summer work program

at the Werner Lake Cobalt project (“Werner Lake”), located in

Ontario, Canada.

Highlights:

•Drill holes intersected high-grade cobalt mineralisation in the

first batch of assays received from Werner Lake.

•3.8m @ 1.39% Co including 1.6m @ 3.23% Co, from 36.7 m in

WL 18-02.

•The Company is excited to confirm consistency of data from

previous drill campaigns.

•Historical total mine production was reported at 143,386 lbs of

cobalt grading approximately 2.2% cobalt and 0.75 % copper.

•Assays for drill holes WL 18-03 and WL 18-04 anticipated short-

ly.

•Marquee has now completed 8 holes for 1,527m at the Werner

Lake Project as part of its phase one drilling campaign.

Marquee Managing Director, Charles Thomas commented:

“These early results from the first phase of the drill campaign are

extremely exciting as they confirm the presence of a high grade

cobalt at Werner Lake. As we continue to receive results from this

drill campaign we are expanding our knowledge of this high-grade

deposit, which remains open in all directions. Drilling has been

progressing ahead of schedule and we look forward to receiving and

reporting the assays from the rest of this phase 1 drilling campaign.”

WL 18-02 returned high-grade intercept, 1.39% Co over 3.8 m (from

35.75 m downhole), including 3.23% Co over 1.6m. Drill hole WL

18-02 was drilled (Azimuth 180o, Dip -45o) to twin diamond drill hole

J-040, a high-grade cobalt intercept completed by Canmine Resources

circa 1995.

Historic diamond drill hole, J-040 intersected high-grade cobalt min-

eralisation returning a main intercept of 5.345% Co over 2.62 metres.

Two other zones of mineralisation were also encountered in WL 18-02

that roughly correspond to findings in J-040 (Figure 1). Overall a wide

zone of Cu mineralisation from 24.0 m (12.1 m @ 0.26% Cu) defined

the targeted horizons.

Figure 1. Cross Section 359,660 E, Werner Lake Drill Holes WL 18-02,

18-03 and 18-04.

Drill hole WL18-01 was drilled (Azimuth 180 o, Dip -67o) to test

potential down dip extension of mineralisation on Section 359,580 E.

Mineralised units were encountered from 146.3 to 153.7 metres with

overall sulphides <1%.

Results indicate the target horizon was intersected where projected

and suggests an approximate extension of 40 metres to depth (Figure

3) of the mineralisation. As expected, elevated Cu values from 146.3

m downhole (2.2 m @ 0.46% Cu) also defined the targeted horizon in

WL 18-01.

Figure 2. Werner Lake Cross Section 359,580 E, Werner Lake Drill

Hole WL-18-01

As part of the phase one drilling campaign, 8 holes for 1,527 metres

have now been completed at the Werner Lake Project.

Core is being sent to the laboratory in batches and as such GEMC

intends to announce further assay results as they come to hand. The

next anticpated batch should include WL 18-03 and WL 18-04 in the

coming weeks.

Marquee’s exploration campaign at Werner Lake is primarily focused

on narrow spaced drilling, which has been designed to increase the

existing Indicated Mineral Resource of 79,400 Tonnes at 0.43% Co

which remains open in all directions.

Figure 3. Werner Lake Drill Hole Location Map.

Qualified Person

Mr. Paul Sarjeant, P . Geo., the Company’s VP Projects and Director, is

the qualified person for this release as defined by National Instrument

43-101 - Standards of Disclosure for Mineral Projects and has reviewed

and verified the technical information contained herein.

Global Energy Metals Corporation

(TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1)

Global Energy Metals is focused on offering security of supply of

cobalt, a critical material to the growing rechargeable battery

market, by building a diversified global portfolio of cobalt assets

including project stakes, projects and other supply sources. GEMC

anticipates growing its business by acquiring project stakes in battery

metals related projects with key strategic partners. Global Energy

Metals currently owns and is advancing the Werner Lake Cobalt Mine

in Ontario, Canada and has entered into an agreement to earn-in to

the Millennium Cobalt Project in Mt. Isa, Australia.

For Further Information:

Global Energy Metals Corporation

#1501-128 West Pender Street

Vancouver, BC, V6B 1R8

Email: [email protected]

t. + 1 (604) 688-4219 extensions 236/237

Cautionary Statement on Forward-Looking Information:

Certain information in this release may constitute forward-looking

statements under applicable securities laws and necessarily involve

risks associated with regulatory approvals and timelines. Although

Global Energy Metals believes the expectations expressed in such

forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance and actual

results or developments may differ materially from those in the

forward-looking statements. Except as required by law, the Company

undertakes no obligation to update these forward-looking statements

in the event that management’s beliefs, estimates or opinions, or

other factors, should change. For more information on Global Energy

and the risks and challenges of their businesses, investors should

review the filings that are available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as

that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

We seek safe harbour.