Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GEMC.V ·

Powered BY Cobalt … Driven BY Demand High Grade Cobalt Mineralisation Continues to Be Drilled at the Werner Lake Cobalt Project; Assays Confirm Extension of Mineralisation at Depth

Drill Results

TSX.V GEMC


www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St. Vancou-

ver , BC

V6B 1R8

T +1.604.688.4219

Twitter @EnergyMetals

Powered by Cobalt … Driven by Demand

HIGH GRADE COBALT MINERALISATION CONTINUES TO BE

DRILLED AT THE WERNER LAKE COBALT PROJECT; ASSAYS

CONFIRM EXTENSION OF MINERALISATION AT DEPTH

Vancouver, BC / TheNewswire / August 15, 2018 / Global Energy

Metals Corporation TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1

(“Global Energy Metals”, the “Company” and/or "GEMC") is pleased

to announce that partner Marquee Resources has received assay

results for the next five of eight holes drilled at the summer work

program at the Werner Lake Cobalt project (“Werner Lake”), located

in Ontario, Canada. The Werner Lake exploration program is part of a

$2.5 million commitment to advance the project and is being sole

funded by Marquee under the final terms of the agreement announced

February 28, 2018.

Highlights:

•Confirms an extension of mineralisation at depth with further

high-grade cobalt mineralisation intersected in the second

batch of assays received from Phase 1 drilling at Werner Lake.

Results included:

•5.5 m @ 0.660% Co from 198.5 m in WL 18-07

•Including 0.7m @ 3.15% Co

•2.7 m @ 0.354% Co from 189.0 m in WL -18-06

•Including 0.7m @ 0.67% Co

•8 holes have now been completed for a total 1,588m at the

Werner Lake Project as part of Marquee’s Phase 1 drilling cam-

paign.  Results for hole WL 18-08 will be reported when avail-

able. With two further holes remaining in Phase 1.

•Based on the successful drilling results during Phase 1, the

Phase 2 drill program will commence immediately following the

completion of holes WL 18-09 and WL 18-10, and will target

further extensions to mineralisation at depth.

•Marquee is confident the assays received from the Phase 1

drilling campaign will increase the existing NI 43-101 Resource

of 79,400 Tonnes @ 0.43% Co.

•Historical total mine production at the Werner Lake Project

was reported at 143,386 lbs of cobalt grading approximately

2.2% cobalt and 0.75 % copper.

Marquee Managing Director, Charles Thomas commented:

“We are extremely encouraged to have intersected such high grade

cobalt mineralisation in Phase 1 of Marquee’s drilling program. WL

18-07 is one of the best holes that has ever been drilled at Werner

Lake and indicates the potential for this deposit to grow in both size

and grade at depth.”

Paul Sarjeant, VP Projects and Director of GEMC said:

“Results from this drill program have further demonstrated the po-

tential for mineralized zones. Marquee’s technical team is incorpo-

rating the new drilling data into the geological model and is develop-

ing a follow up drilling program which will target mineralisation at

depth having the potential to significantly increase the existing NI

43-101 Resource at Werner Lake.”

Table 1. Significant Diamond Drill Results at Werner Lake Cobalt

Project

WL 18-03 (Figure 1) was designed to test down dip potential of the

mineralised zone on Section 359,660 E from Canmine drill hole J-041

(4.76m @ 0.426% Co).  The hole encountered zones of sulphide miner-

alisation where expected based on historical data (Figure 1) repre-

senting an approximately 40 m extension of mineralisation. WL 18-04

encountered weak sulphide mineralisation in drill core and elevated

cobalt values were observed (Table 1) where expected, indicating the

mineralised horizon continues further at depth (Figure 1).

Drill Hole From

(m)

To

(m)

Intercept

(m)

Co

(%)

Cu

(%)

WL 18-03 95.5 96.5 1.0 0.1650.164

  101.0 102.6 1.6 0.1070.344

WL 18-04 118.1 119.2 1.1 0.0430.146

WL 18-05 148.7 150.4 1.7 0.1890.094

WL 18-06 189.0 191.7 2.7 0.3540.313

Incl. 189.0 189.7 0.7 0.672 0.819

WL 18-07 198.5 204.0 5.5 0.6600.124

Incl. 198.5 199.2 0.7 3.150 0.056

Figure 1. Simplified Cross Section 359,660 E

WL 18-05 and WL 18-06 (Figure 2) were designed to extend minerali-

sation to depth along Section 359,675 E.  WL 18-05 (Table 1) returned

0.189% Co over 1.7 m (from 148.7 m) and was successful in extending

mineralisation approximately 40 m beneath Canmine drill hole

J-112.    WL 18-06  (Figure 2) was drilled from the same collar as WL

18-05 to further extend mineralisation.  The hole returned strong

cobalt mineralisation of 0.345% Co over 2.70 m from 189.0 m, includ-

ing a high grade zone of 0.672% over 0.70 m (from 189.0).  This inter-

cept represents the deepest mineralisation on this section and indi-

cates strong cobalt mineralisation in an area that had poor results

during the Puget Ventures 2010 drill campaign.  Additional drilling wil

be undertaken to assess the potential extension to mineralisation.

Figure 2. Simplified Cross Section 359,675 E

WL 18-07 tested the depth extension on mineralisation Section

359,700 E (Figure 3).  Very strong cobalt mineralisation over a signifi-

cant width was encountered; 0.660% Co over 5.5 m (from 198.5 m). 

Of particular significance was a 0.7 m section (from 198.5) of 3.150%

Co, though two significant intervals below this interval ran over 0.3%

Co, suggesting a strong zone of mineralisation was intersected.  This

represents an approximate 50m down dip extension of mineralisation.

Figure 3. Simplified Cross Section 359,700 E

The Company has now completed 8 holes for 1,588m at the Werner

Lake Project as part of its phase one drilling campaign (Figure 4).  Re-

sults for hole WL 18-08 are pending and will be reported when avail-

able.

The Company has been informed by the relevant authorities that the

wildfire that was previously buring in the Werner Lake area is now

sufficiently under control to allow the Company to recommence

drilling activities at the Werner Lake Cobalt Project and the drilling

team is expected to be remobilised over the coming 24 hours. 

Figure 4. Werner Lake Drill Hole Location Map

Qualified Person

Mr. Paul Sarjeant, P . Geo., the Company’s VP Projects and Director, is

the qualified person for this release as defined by National Instrument

43-101 - Standards of Disclosure for Mineral Projects and has reviewed

and verified the technical information contained herein.

Global Energy Metals Corporation

(TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1)

Global Energy Metals is focused on offering security of supply of

cobalt, a critical material to the growing rechargeable battery

market, by building a diversified global portfolio of cobalt assets

including project stakes, projects and other supply sources. GEMC

anticipates growing its business by acquiring project stakes in battery

metals related projects with key strategic partners. Global Energy

Metals currently owns and is advancing the Werner Lake Cobalt Mine

in Ontario, Canada and has entered into an agreement to earn-in to

the Millennium Cobalt Project in Mt. Isa, Australia.

For Further Information:

Global Energy Metals Corporation

#1501-128 West Pender Street

Vancouver, BC, V6B 1R8

Email: [email protected]

t. + 1 (604) 688-4219 extensions 236/237

Cautionary Statement on Forward-Looking Information:

Certain information in this release may constitute forward-looking

statements under applicable securities laws and necessarily involve

risks associated with regulatory approvals and timelines. Although

Global Energy Metals believes the expectations expressed in such

forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance and actual

results or developments may differ materially from those in the

forward-looking statements. Except as required by law, the Company

undertakes no obligation to update these forward-looking statements

in the event that management’s beliefs, estimates or opinions, or

other factors, should change. For more information on Global Energy

and the risks and challenges of their businesses, investors should

review the filings that are available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as

that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

We seek safe harbour.