Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GEMC.V ·

Powered BY Cobalt … Driven BY Demand Global Energy Metals to Investigate Cobalt- Copper-GOLD Recovery Potential FOR Recently Acquired Millennium Project IN Queensland, Australia

Mergers & Acquisitions Metallurgy & Processing

TSX.V GEMC


www.globalenergymetals.com

Suite 1501,

Sun Tower

128 West Pender St. Vancou-

ver , BC

V6B 1R8

T +1.604.688.4219

Twitter @EnergyMetals

Powered by Cobalt … Driven by Demand

GLOBAL ENERGY METALS TO INVESTIGATE COBALT-

COPPER-GOLD RECOVERY POTENTIAL FOR RECENTLY

ACQUIRED MILLENNIUM PROJECT IN QUEENSLAND,

AUSTRALIA

Vancouver, BC / TheNewswire / July 17, 2019 / Global Energy

Metals Corporation TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1

(“Global Energy Metals”, the “Company” and/or "GEMC") is pleased

to announce that it has entered into a Memorandum of Understanding

(“MOU”) with Australian cobalt peer, Cobalt Blue Holdings Limited

(“Cobalt Blue”) to investigate cobalt-copper-gold recovery potential

for the Millennium Project in Queensland Australia.

Global Energy Metals recently announced the outright acquisition o f

the Millennium Project adding to its battery metals portfolio one of

the most exciting scalable primary-cobalt projects in the industry.

With the strong understanding of the potential for the high-grade

Millennium project as well as the Mt. Dorothy Project and Cobalt

Ridge properties, collectively referred to as the Mt. Isa Projects, the

acquistion has positioned GEMC as an exploration leader in the Mt. Isa

- Cloncurry mining district for cobalt and battery mineral deposits.

Historical studies have shown that cobalt and copper concentrates

can be floated from samples of drill core from the Millennium Project.

It is the intent of Global Energy Metals and Cobalt Blue to prepare

new cobalt-pyrite samples and test the applicability of Cobalt Blue’s

pyrite processing technology to the concentrates.

Mitchell Smith, CEO and Director commented:

“It is invaluable to conduct metallurgical testwork on this resource at

this stage in its development and further de-risk the project while

looking at various processing options for the company as it continues

to grow the existing resource and delineate new targets at

Millennium. Given the encouraging results of previous metallurgical

test with high recovery rates for copper, cobalt and gold we are

confident that the results from this program can demonstrate a

potentially viable option for the project.”

The Proposed Cobalt Blue - Global Energy Metals Program:

(i)A review of historical testwork to produce concentrates from the

Millennium Project

(ii) A review of cobalt-pyrite quantity, grade, mineralogy and other

physical characteristics, as available for the Millennium Project.

(iii) Collaboration between GEMC and Cobalt Blue to produce cobalt-

pyrite concentrate samples, or bulk Co-Cu-Au sulphide mineral

concentrates.

(iiii) Laboratory scale “proof-of-concept” testwork, treating cobalt-

pyrite feedstock using the Cobalt Blue process.

(v) Preparation of a short-form report summarising the findings by

Cobalt Blue, for delivery to GEMC.

Figure 1. Location of the Millennium Project

Cobalt Blue Processing Technology

Cobalt Blue has been developing minerals processing technology for

extraction and recovery of cobalt and elemental sulphur from cobalt-

pyrite feedstocks. The technology was evaluated in the 2018 PFS for

the Thackaringa deposits near Broken Hill, and was successfully shown

to be technically and economically viable for that project. This work

culminated in the release of the maiden Ore Reserve Statement that

accompanied the PFS.

Previously, Cobalt Blue has successfully evaluated application of the

technology to cobalt-pyrite feedstocks from Havilah’s Mutooroo

deposit. Separately, evaluation of tailings from Cudeco’s Rocklands

project was commenced in late 2018. The Millennium Project is

located approximately 20 km from the Cudeco Rocklands mine site, as

shown in Figure 1.

The minerals processing technology is focused on the treatment of

pyrite, to recover payable metals, elemental sulphur, and generate

environmentally stable iron oxide leach residues. The process

specifically avoids the simultaneous production of sulphuric acid,

which normally occurs when roasting pyrite, or leaching pyrite via

pressure oxidation.

Cobalt Blue continues to assess opportunities to apply its innovative

minerals processing technology and has now identified a second

prospective project (the Millennium Project) in the Mt Isa-Cloncurry

district for evaluation.

Qualified Person

Mr. Paul Sarjeant, P . Geo., is the qualified person for this release as

defined by National Instrument 43-101 - Standards of Disclosure for

Mineral Projects and has reviewed and verified the technical

information contained herein.

Global Energy Metals Corporation

(TSXV:GEMC | OTCQB:GBLEF | FSE:5GE1)

Global Energy Metals is focused on offering security of supply of

cobalt, a critical material to the growing rechargeable battery

market, by building a diversified global portfolio of cobalt assets

including project stakes, projects and other supply sources. GEMC

anticipates growing its business by acquiring project stakes in battery

metals related projects with key strategic partners. Global Energy

Metals now holds 100% of the Millennium Cobalt Project and two

neighbouring discovery stage exploration-stage cobalt assets in Mt.

Isa, Australia. It also currently owns 70% of the Werner Lake Cobalt

Mine in Ontario, Canada, has an option to acquire an 85% interest in

two cobalt exploration projects in Nevada, 150km East of the Tesla

Gigafactory.

For Further Information:

Global Energy Metals Corporation

#1501-128 West Pender Street

Vancouver, BC, V6B 1R8

Email: [email protected]

t. + 1 (604) 688-4219 extensions 236/237

Twitter: @EnergyMetals

Cautionary Statement on Forward-Looking Information:

Certain information in this release may constitute forward-looking

statements under applicable securities laws and necessarily involve

risks associated with regulatory approvals and timelines. Although

Global Energy Metals believes the expectations expressed in such

forward-looking statements are based on reasonable assumptions,

such statements are not guarantees of future performance and actual

results or developments may differ materially from those in the

forward-looking statements. Except as required by law, the Company

undertakes no obligation to update these forward-looking statements

in the event that management’s beliefs, estimates or opinions, or

other factors, should change. For more information on Global Energy

and the risks and challenges of their businesses, investors should

review the filings that are available at www.sedar.com.

Neither TSX Venture Exchange nor its Regulation Services Provider (as

that term is defined in the policies of the TSX Venture Exchange)

accepts responsibility for the adequacy or accuracy of this release.

We seek safe harbour.