Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GCU.TO ·

Excelsior Mining Receives Approval for New Leach Pad at Johnson Camp Mine

Permits & Approvals

NEWS RELEASE

Excelsior Mining Receives Approval for New Leach Pad at Johnson Camp Mine

January 23rd, 2023

Excelsior Mining Corp. (TSX: MIN) (FSE: 3XS) (OTCQB: EXMGF) ("Excelsior" or the “Company”)

is pleased to announce that it has received approval from Arizona Department of Environmental Quality

(ADEQ) for a new leach pad at its Johnson Camp Mine (JCM) facility. The Aquifer Protection Permit

(APP) for Johnson Camp has been amended to include the construction and operation of a heap leach

pad to produce copper from the legacy open pits at Johnson Camp in Cochise County, Arizona.

“Excelsior appreciates the groundwater protection team at ADEQ for their dedication to the protection of

Arizona’s groundwater and their guidance through the process. The amended APP is a key piece for

Excelsior to continue developing its JCM project after the successful drilling program of 2022. The

permit approval is also welcomed in the context of the recently announced collaboration with an

industry leader in the emerging sulfide heap leach technology. We are excited for the potential that

Johnson Camp brings to Excelsior to complement our growing mining camp in Southern Arizona, one

of the best jurisdictions in the world for mining the critical materials required for our ever-changing

world,” states Robert Winton, SVP Operations.

ABOUT EXCELSIOR MINING

Excelsior “The Copper Solution Company ” is a mineral exploration and production company that owns

and operates the Gunnison Copper Project in Cochise County, Arizona. The project is a low cost,

environmentally friendly in-situ recovery copper extraction project that is permitted to 125 million pounds

per year of copper cathode production. Excelsior also owns the past producing Johnson Camp Mine and

a portfolio of exploration projects, including the Peabody Sill and the Strong and Harris deposits.

For more information on Excelsior, please visit our website at www.excelsiormining.com.

For further information regarding this press release, please contact:

Excelsior Mining Corp.

Concord Place, Suite 300, 2999 North 44th Street, Phoenix, AZ, 85018.

Shawn Westcott

T: 604.365.6681

E: [email protected]

www.excelsiormining.com

Cautionary Note Regarding Forward-Looking Information

This news release contains "forward-looking information" concerning anticipated developments and events that may

occur in the future. Forward looking information contained in this news release includes, but is not limited to,

2

statements with respect to: (i) the intention to deploy sulfide leaching technology at the Johnson Camp mine and

other Excelsior copper projects, and future production therefrom; and (ii) details of future operational plans.

In certain cases, forward-looking information can be identified by the use of words such as "plans", "expects" or

"does not expect", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate",

or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could",

"would", "might", "occur" or "be achieved" suggesting future outcomes, or other expectations, beliefs, plans,

objectives, assumptions, intentions or statements about future events or performance. Forward-looking information

contained in this news release is based on certain factors and assumptions regarding, among other things, the

availability of financing to implement the Company’s operational plans, the estimation of mineral resources and

mineral reserves, the realization of resource and reserve estimates, expectations and anticipated impact of the

COVID-19 outbreak, copper and other metal prices, the timing and amount of future development expenditures, the

estimation of initial and sustaining capital requirements, the estimation of labour and operating costs (including the

price of acid), the availability of labour, material and acid supply, receipt of and compliance with necessary

regulatory approvals and permits, the estimation of insurance coverage, and assumptions with respect to currency

fluctuations, environmental risks, title disputes or claims, and other similar matters. While the Company considers

these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause

the actual results, performance or achievements of the Company to be materially different from any future results,

performance or achievements expressed or implied by the forward-looking information. Such factors include risks

inherent in the construction and operation of mineral deposits, including risks relating to changes in project

parameters as plans continue to be redefined including the possibility that mining operations may not be sustained

at the Gunnison Copper Project, risks relating to variations in mineral resources and reserves, grade or recovery

rates, risks relating to the ability to access infrastructure, risks relating to changes in copper and other commodity

prices and the worldwide demand for and supply of copper and related products, risks related to increased

competition in the market for copper and related products, risks related to current global financial conditions, risks

related to current global financial conditions and the impact of COVID-19 on the Company’s business, uncertainties

inherent in the estimation of mineral resources, access and supply risks, risks related to the ability to access acid

supply on commercially reasonable terms, reliance on key personnel, operational risks inherent in the conduct of

mining activities, including the risk of accidents, labour disputes, increases in capital and operating costs and the

risk of delays or increased costs that might be encountered during the construction or mining process, regulatory

risks including the risk that permits may not be obtained in a timely fashion or at all, financing, capitalization and

liquidity risks, risks related to disputes concerning property titles and interests, environmental risks and the

additional risks identified in the “Risk Factors” section of the Company’s reports and filings with applicable Canadian

securities regulators.

Although the Company has attempted to identify important factors that could cause actual actions, events or results

to differ materially from those described in forward-looking information, there may be other factors that cause

actions, events or results not to be as anticipated, estimated or intended. Accordingly, readers should not place

undue reliance on forward-looking information. The forward-looking information is made as of the date of this news

release. Except as required by applicable securities laws, the Company does not undertake any obligation to

publicly update or revise any forward-looking information.