Global Battery Metals Receives Drill Permits for Lithium King Property
1
Global Battery Metals Receives Drill Permits for Lithium King Property
June 2 2, 2022, Vancouver, BC, Canada – Global Battery Metals Ltd. (the “ Company” or “ GBML”)
(TSXV: GBML; OTCQB: REZZF; FSE: REZ) is pleased to announce that it has received all required
permits to drill on its 100% owned Lithium King property (“Lithium King Property” or the “Property”)
in Utah. The objective of drilling is to confirm the potential at depth of lithium bearing brines in the Salduro
Salt flat basin.
The Company is in the process of selecting a drilling contractor.
Lithium King Property Description
The Lithium King Property is located on the west side of the Great Salt Lake Basin in western Utah, adjacent
to the community of Wendover, Utah. The land position consists of approximately 1,760 acres of placer
claims. The Property has the potential to host a lithium and magnesium brine deposit in an existing mineral
producing location in a mining-friendly state.
Please see the Company’s news release dated March 4, 2021, for a detailed project review.
About Global Battery Metals Ltd.
GBML is a mineral exploration company with a focus on metals that make up and support the rapid
evolution to battery power. GBML’s common shares are listed on the TSX Venture Exchange and Frankfurt
Stock Exchange and quoted on the OTCQB. GBML currently has five projects: (1) an option to acquire up
to a 90% in the North -West Leinster lithium property in Ireland ; (2) a 100% interest in the Lithium King
Property in Utah ; (3) an option to acquire up to a 100% interest in the Lapoile lithium project in
Newfoundland; (4) an option to lease the Sawyer Camp prospective nickel-copper project in Michigan; and
(5) a 55% stake in Peru-based Lara copper property, which has over 10,000 metres of drilling. As previously
disclosed, Minsur S.A., a Peruvian mining company, entered into an option agreement (the “Lara Property
Option Agreement”) with GBML and Lara Exploration Ltd. to acquire the Lara copper property for staged
payments of USD$5.75 million. The Lara Property Option Agreement also provides for a 0.75% net smelter
royalty in favour of GBML.
Global Battery Metals Ltd.
Michael Murphy BA, MBA, MSc., ICD
President & CEO
T: 604-649-2350
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release.
2
Cautionary Statement Regarding "Forward-Looking" Information
This news release contains certain "forward -looking information" and "forward -looking statements"
(collectively "forward -looking statements") within the meaning of applicable securities legislation. All
statements, other than statements of historical fact, included herein, without limitation, statements relating
the future operations and activities of the Company, are forward -looking statements. Forward -looking
statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes",
"intends", "estimates", "potential", "possible", and similar expressions, or statements that events,
conditions, or results "will", "may", "could", or" should" occur or be achieved. Forward-looking statements
in this news release relate to, among other things, the Company’s exploration plans, including a proposed
drill program to be conducted on the Company’s Lithium King Property in Utah, United States. There can
be no assurance that such statements will prove to be accurate, and actual results and future events could
differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs,
opinions and projections on the date the statements are made and are based upon a number of assumptions
and estimates that , while considered reasonable by the Company , are inherently subject to significant
business, economic, competitive, political and social uncertainties and contingencies. Many factors, both
known and unknown, could cause actual results, performance or achi evements to be materially different
from the results, performance or achievements that are or may be expressed or implied by such forward -
looking statements and the parties have made assumptions and estimates based on or related to many of
these factors. Such factors include, without limitation, the ability to complete proposed exploration work
given the global COVID -19 pandemic, the results of exploration, continued availability of capital, and
changes in general economic, market and business conditions. Readers should not place undue reliance on
the forward-looking statements and information contained in this news release concerning these items. The
Company does not assume any obligation to update the forward -looking statements of beliefs, opinions,
projections, or other factors, should they change, except as required by applicable securities laws.