Asanko GOLD Reports Q3 2017 Results

Financials

PRESS RELEASE

ASANKO GOLD REPORTS Q3 2017 RESULTS

Vancouver, British Columbia, November 3, 2017 – Asanko Gold Inc. (“Asanko” or the “Company”) (TSX,

NYSE American: AKG) reports its third quarter (“Q3”) 2017 operating and financial results. The Company

released its production and revenue results for Q3 2017 on October 19, 2017. All amounts are in US dollars

unless otherwise stated. Management will host a conference call and webcast today at 9am Eastern Time,

further details below.

Q3 2017 Highlights:

• No lost time injuries during the quarter, maintaining industry leading safety statistic lost time injury

frequency rate (“LTIFR”) of 0.19 per million man hours worked

• Gold sales of 50,241 ounces at an average realized gold price of $ 1,265 per ounc e generating

revenue of $63.7 million

• Quarterly gold production of 49,293 ounces, an increase of 7% over the previous quarter

• AISC3 increased to $975/oz (Q2 2017: $930/oz) quarter on quarter, primarily due to higher capitalized

pre-stripping cost associated with the progression of Cut 2 in the Nkran pit

• Reduction in o perating cash costs2 to $485/oz (Q2 2017: $572/oz) and total cash costs 2 to $549/oz

(Q2 2017: $634/oz)

• Cash provided by operating activities of $40.7 million ($31.7 million before working capital changes),

an increase of 21% or $7 million compared to Q2 2017

• Earned net income of $4.7 million ($0.02/share), a $4.0 million increase relative to Q2 2017

• Cash and immediately convertible working capital of $64.3 million, as at September 30, 2017

• On track to meet rev ised 2017 guidance of 205,000 -225,000 ounces at AISC3 of US$920-960 per

ounce

Commenting on the Company’s quarterly performance, Peter Breese, President and CEO, said

“The improved operational performance for the quarter was the result of the new mining systems we

recently introduced to improve the ore loss and dilution metrics, as well as mining through multiple zones of

mineralization within the Nkran pit.

These encouraging operational results translated into an improved financial performance for the quarter ,

continuing our track record of generat ing positive cash flows . Compared to Q2 2017, c ash flow from the

operations before working capital increased by 19%, earned net income increased by $ 4.0 million or $0.02

per share and our cash and immediately convertible working capital balance increased by some 9% to $64.3

million.”

This news release should be read in conjunction with Asanko’s Management Discussion and Analysis and

the Condensed Consolidated Interim Financial Statements for the quarter ended September 30, 2017,

which are available at www.asanko.com and filed on SEDAR.

2

3

Key Operating and Financial Highlights

Asanko Gold Mine

Q3 2017 Q2 2017 Q1 2017

Waste Mined (‘000t) 7,339 6,457 5,620

Ore Mined (‘000t) 1,181 1,049 1,017

Strip Ratio (W:O) 6.2:1 6.2:1 5.5:1

Mining Cost ($/t mined) 3.35 3.22 3.89

Ore Treated (‘000t) 862 887 908

Gold Feed Grade (g/t) 1.9 1.7 2.1

Gold Recovery (%) 94 94 95

Processing Cost ($/t treated) 12.94 12.80 13.36

Gold Production (oz) 49,293 46,017 58,187

Gold Sales (oz) 50,241 48,461 57,812

Average Realised Gold Price ($/oz) 1,265 1,238 1,199

Operating Cash Costs2 ($/oz) 485 572 578

Total Cash Costs2 ($/oz) 549 634 638

All-in Sustaining Costs (“AISC”)3 ($/oz) 975 930 956

All-in Sustaining Margin ($/oz) 1 290 308 243

Gross Gold Revenue ($m) 63.5 60.0 69.3

Production Costs, including Royalties ($m) 28.0 31.3 37.7

Income from Mine Operations ($m) 17.9 14.5 15.1

Net Income attributable to common shareholders ($m) 4.7 1.0 7.8

Net Income per share $0.02 $0.00 $0.04

Cash provided by Operating Activities ($m) 40.7 33.7 14.4

Cash provided by Operating Activities b/f working capital ($m) 31.7 26.7 28.8

Cash provided by Operating Activities per share $0.20 $0.17 $0.07

Q3 2017 Operating Results

• Industry-leading safety record maintained, with a rolling 12 month LTIFR of 0.19 per million man hours

worked and no lost time injuries reported during the quarter.

• Gold production of 49,293 ounces, an increase of 7% over the previous quarter as mining interventions

delivered results.

• Ore mining rates for the A sanko Gold Mine (“AGM”) averaged 393,000 tonnes per month (“tpm”) for

the quarter at an average mining grade of 1.8 g/t and a strip ratio of 6.2:1.

• At Nkran, d uring Q3, mining operations extracted ore from multiple zones of mineralization with an

average mining grade of 1.8 g/t . The deployment of bl ast monitoring technology to min imize ore

losses and dilution has continued to yield positive results.

4

• The grade control versus the resource model reconciliation continue d to improve with a positive

ounce variance of 8% in the quarter. In addition, with the introduction of the Blast Movement

Technology and improved ore delineation techniques within the pit , the reserve to mill feed

reconciliation was within 1% on an ounce basis for the quarter . Both of the these positive

reconciliations clearly validate the Mineral Resource and Reserve Estimates.

• At the Akwasiso satellite deposit mining operations delivered approximately 20,000tpm @ 1.3g/t of

oxide ore for the quarter. These levels are expected to continue in Q4 2017.

• The Company completed a confirmatory drilling program at Akwasiso to infill drill test the previously

inaccessible area which was covered with tailings from historic artisanal mining activities and the

results confirmed the Akwasiso reserve model.

• At Dyna mite Hill, the second satellite pit to be b rought into production, site establishment

commenced during the quarter in preparation of mining operations in Q4 2017. This included 3,096m

of grade control drilling which validated the resource model and confirmed the mine plan and oxide

ore volumes.

• The processing facility was impacted by three mill motor outages, which resulted in a total of 11 days

of lost milling time during the quarter, equating to in excess of 5,000 ounces of lost gold production. In

Q3 the plant processed 862,000 tonnes with a feed grade of 1.9 g/t.

• Gold recovery continued to exceed design levels at 94%.

• Commissioning of the Project 5 Million volumetric upgrades was completed during the quarter . The

upgrades were designed on a fresh to oxide ore ratio of 9 ,000:6,000tpd. The processing facility is

currently achieving milling rates in excess of 13,500 tonnes per day on a campaign basis . The increase

in higher fresh ore tonnes is being achieved by modifications to the communiton circuit, currently

consisting of three mobile crushers. A secondary crusher is expected to be permanently installed in Q2

2018.

Q3 2017 Financial Performance

• Net income attributable to common shareholders increased by $4.0 million compared to the previous

quarter, up to $4.7 million or $0.02 per share (Q2 2017: $0.00 per share).

• Mining and processing costs for Q3 2017 averaged $3.35/tonne mined (Q2 2017: $3.22/tonne) and

$12.94/tonne milled (Q2 2017: $12.80/tonne), respectively. Mining costs per tonne were moderately

higher than Q2 2017 as a result of the progression of Cut 2 into more competent material, offset

partially by lower per unit costs associated with the development of the Akwasiso pit in oxides. Of the

mining costs i ncurred during Q3 2017, a total of $19.0 million was deferred as stripping costs.

Processing unit costs were also moderately higher than Q2 2017 due to the impact of three mill motor

outages that resulted in higher maintenance costs, while fewer tonnes wer e milled which had the

impact of increasing fixed processing cost on a per unit basis.

• Operating cash costs 2 and total cash costs 2 decreased to $ 485/oz (Q 2: $572/oz) and $ 549/oz (Q2:

$634/oz) respectively. The reduction was predominantly the result of lower production costs,

augmented by the impact of higher sales volumes which had the effect of reducing fixed production

costs on a per unit basis

• AISC3 increased quarter on quarter to $975/oz (Q 2 2017: $930 /oz), predominantly due to higher

sustaining capitalized stripping cost, partly offset by the reduction in total cash cost per ounce.

• Gold sales of 50, 241 ounces at an average realized price of $ 1,264/oz (Q 2 2017: $1,238/oz). With

revenues, net of royalties, of $60.5 million (Q2 2017: $57.0 million).

• Total cost of sales (including depreciation and depletion) was $42.6 million.

• Cash provided by operating activities was $40.7 million or $0.20 per share. Cash provided by operating

5

activities before working capital adjustments was $31.7 million.

Q3 2017 Liquidity and Capital Resources

• Cash and immediately convertible working capital amounted to $64.3 million as at September 30, 2017,

comprising cash and cash equivalents of $60.8 million, unrefined gold dore on hand with a cost of $ 2.2

million (and a market value of $3.5 million) and $1.3 million in receivables from gold sales.

2017 Outlook

From Q4 2017 onwards, the AGM ’s mine plan will incorporate all sources of ore available from its multiple

pits to blend to the mill to enable the optimization of the various pit extraction rates, the stockpile balances

and operating costs. As a consequence , the mill feed grades are expected to reflect the average reserve

grades from the respective pits as they are mined , including the blended grade average from the various

stockpiles.

The Company is on track to meet its revised 2017 guidance of 205,000 to 225,000 ounces at AISC of US$920

to US$960 per ounce.

Notes:

1 Non-GAAP Performance Measures

The Company has included certain non -GAAP performance measures in this press release, including working capital,

adjusted net income (loss), adjusted net income (loss) per share, operating cash costs, total cash costs, all -in

sustaining costs per ounce of gold produced and all-in sustaining margin. These non-GAAP performance measures do

not have any standardized meaning. Accordingly, these performance measures are intended to provide additional

information and should not be considered in isolation or as a substitute for measures of performance prepared in

accordance with GAAP.

2 Operating Cash Costs per ounce and Total Cash Costs per ounce

Operating cash costs are reflective of the cost of production, adjusted for share -based payments and by -product

revenue for each ounce of gold sold. Total cash costs include production royalties of 5%.

3 All-in Sustaining Costs Per Gold Ounce

The Company has adopted the reporting of “all -in sustaining costs per gold ounce” (“AISC”) as per the World Gold

Council’s guidance. AIS C include total cash costs, corporate overhead expenses, sustaining capital expenditure,

capitalized stripping costs and reclamation cost accretion for each ounce of gold sold.

Q3 2017 Operating and Financial Results Conference Call & Webcast Details

Management will host a conference call and webcast at 9am EST on Friday, November 3, 2017 to discuss

the Q3 2017 operating and financial results, which will be published on the same day:

US/Canada Toll Free: 800 954 0585

UK Toll Free: 0800 496 1094

International: + 1 312 281 1210

Webcast:

Please click on the link: https://cc.callinfo.com/r/1p4r4b25z6ku0&eom

Replay

A recorded playback will be available approximately two hours after the call until December 3, 2017:

US/Canada Toll Free: 800 558 5253

International: +1 416 626 4100

6

Passcode: 21860092

Enquiries:

For further information please visit: www.asanko.com, email: [email protected] or contact:

Alex Buck - Manager, Investor and Media Relations

Toll-Free (N.America): 1-855-246-7341

Telephone: +44-7932-740-452

Email: [email protected]

Rob Slater – Executive, Corporate Development and Strategy

Telephone: +27-11-467-2758

Email: [email protected]

About Asanko Gold Inc.

Asanko’s vision is to become a mid -tier gold mining company that maximizes value for all its stakeholders.

The Company’s flagship project is the multi-million ounce Asanko Gold Mine located in Ghana, West Africa.

Asanko is managed by highly skilled and successful technical, operational and financial professionals. The

Company is strongly committed to the highest standards for environmental management, social

responsibility, and health and safety for its employees and neighbouring communities.

Forward-Looking and other Cautionary Information

This release includes certain statements that may be deemed "forward- looking statements". All statements in this

release, other than statements of historical facts, that address estimated resource quantities, grades and contai ned

metals, possible future mining, exploration and development activities, are forward- looking statements. Although the

Company believes the forward-looking statements are based on reasonable assumptions, such statements should not

be in any way construed as guarantees of future performance and actual results or developments may differ materially

from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in

forward-looking statements include market prices for metals, the conclusions of detailed feasibility and technical

analyses, the timely renewal of key permits, lower than expected grades and quantities of resources, mining rates and

recovery rates and the lack of availability of necessary capital, which may not be available to the Company on terms

acceptable to it or at all. The Company is subject to the specific risks inherent in the mining business as well as general

economic and business conditions. For more information on the Company, I nvestors should review the Company's

Annual Form 40-F filing with the United States Securities Commission and its home jurisdiction filings that are available

at www.sedar.com.

Neither Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility

for the adequacy or accuracy of this release.

Cautionary Note to US Investors Regarding Mineral Reporting Standards:

Asanko has prepared its disclosure in accordance with the requi rements of securities laws in effect in Canada, which

differ from the requirements of US securities laws. Terms relating to mineral resources in this press release are defined

in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects under the guidelines set

out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral

Reserves. The Securities and Exchange Commission (the “SEC”) permits mining companies, in their filings with the SEC,

to disclose only those mineral deposits that a company can economically and legally extract or produce. Asanko uses

certain terms, such as, “measured mineral resources”, “indicated mineral resources”, “inferred mineral resources” and

“probable mineral reserves”, that the SEC does not recognize (these terms may be used in this press release and are

included in the public filings of Asanko which have been filed with securities commissions or similar authorities in

Canada).