Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GAU.TO ·

Asanko GOLD MINE Expansion Update

Corporate Updates

1

PRESS RELEASE

ASANKO GOLD MINE EXPANSION UPDATE

Highlights:

• Mining operations at Esaase and overland conveyor fully permitted, following receipt of both the

environmental permit and the mine operating permit

• Asanko Gold Mine technical report currently being updated with revised 2016 year-end Mineral

Reserves and Mineral Resources; global Mineral Reserve inventory not expected to materially

change.

• Independent mining industry consultant, CSA Global, engaged to review the Asanko Gold Mine

Mineral Resource inventory

• Expansion Definitive Feasibility Study remains on track for publication in Q1 2017

• Front End Engineering and Design for the overland conveyor as well as the plant upgrade to 5Mtpa

underway and on track for completion in Q2 2017

Vancouver, British Columbia, February 6, 2017 – Asanko Gold Inc. (“Asanko” or the “Company”) (TSX, NYSE

MKT: AKG) is pleased to provide an update on the progress of the expansion of the Asanko Gold Mine

(“AGM”), located in Ghana, West Africa.

The expansion of the AGM consists of two discrete phases; an expansion of mining operations to integrate

Esaase including the construction of an overland conveyor and an upgrade of the existing processing facilities

from 3.6 million tonnes per annum (“Mtpa”) to 5Mtpa (“Project 5M”).

The second phase is the construction of an additional carbon-in-leach (“CIL”) plant to double throughput

from 5Mtpa to 10Mtpa (“Project 10M”). Once completed, the AGM is targeting production in excess of

450,000 ounces of gold per annum from 2020 onwards.

The permitting process for the first phase of the expansion has now been completed. The Ghanaian

Environmental Protection Agency (“EPA”) has issued its environmental permit for mining operations at

Esaase and the overland conveyor to the AGM processing facility. This critical step was achieved following

the EPA’s approval of the Environmental Impact Statement. The Minerals Commission has also issued the

mine operating permit for the Esaase pits.

The Company expects to publish the results of the Expansion Definitive Feasibility Study (“DFS”) in Q1 2017.

This will now incorporate revised global Mineral Resource and Mineral Reserve estimates, which are being

updated for depletion (including nine months of tonnage and grade reconciliations) and changes in modifying

factors, based on latest economic inputs, infill drilling at Dynamite Hill as well as the addition of three new

pits discovered during the 2016 exploration program.

In addition, a globally recognized independent mining industry consultancy, CSA Global, has been engaged

as an independent party to review the global Mineral Resource inventory using information from the

outcomes of a Resource Reconciliation Study, which has been informed by over 4Mt of ore mining and nine

months of steady-state operations. Despite individual variances on a pit-by-pit basis, no material change to

the global AGM Mineral Reserves is expected. In line with best practice, the AGM resources are being

2

updated from previously unconstrained Mineral Resources to now include the effects of constraining

parameters. The constraining parameters being used are an economic cut-off grade of 0.5g/t gold within a

US$2,000 per ounce gold pit shell. Relevant material disclosure via an updated NI 43-101 Technical Report

for the AGM is expected to be published in Q1 2017.

Commenting on today’s announcement, Peter Breese, President and CEO, said “Receipt of the environmental

and mining permits marks the final permitting step for the development of one of our major deposits, Esaase.

We are extremely appreciative of the constructive support we have received from the Ghanaian authorities

through the permitting process for Esaase and pay tribute to all our in-country stakeholders for their

contribution to this process.

The Asanko Gold Mine expansion projects will boost production to over 450,000 ounces a year by 2020,

making it one of the largest gold mines in Ghana. The Expansion DFS is nearing completion and will include

an updated Mineral Resource and Mineral Reserve estimate.

As we now have sufficient quantitative data from nine months of grade control drilling and 4Mt of ore mined,

we have engaged CSA Global as an additional independent party to review our mineral inventory, particularly

given the complex nature of the structural controls associated with the Nkran mineralization. Whilst we

expect some variances on a pit by pit basis, overall we are not anticipating a material change to the Asanko

Gold Mine’s global Mineral Reserves, upon which the current expansion projects are based.”

Pursuant to Board approval in Q4 2016 of the Project 5M expansion (see press release dated November 3,

2016), Front End Engineering and Design (“FEED”) has commenced and is on track for completion in Q2 2017.

The plant upgrades are expected to be completed by Q4 2017. Construction of the conveyor is expected to

begin in Q2 2017 and be completed in Q4 2018. Pre-stripping and mine infrastructure development at Esaase

is expected to start in H2 2018.

Qualified Person Statements

Phil Bentley, Asanko Executive: Geology and Resources (Pr.Sci.Nat.) is the Qualified Person under NI 43-101

guidelines who assumes technical responsibility for Mineral Resource contents of this news release, and

Frederik Fourie, Asanko Senior Mine Engineer (Pr.Eng.) is the Qualified Person under NI 43-101 who

assumes responsibility for the Mineral Reserve contents of this news release.

Enquiries:

For further information, please visit: www.asanko.com, email: [email protected] or contact:

Alex Buck - Manager, Investor and Media Relations

Toll-Free (N. America): 1-855-246-7341

Telephone: +44-7932-740-452

Email: [email protected]

Wayne Drier - Executive, Corporate Development

Telephone: +1-778-729-0614

Email: [email protected]

About Asanko Gold Inc.

Asanko’s vision is to become a mid-tier gold mining company that maximizes value for all its stakeholders.

The Company’s flagship project is the multi-million ounce Asanko Gold Mine located in Ghana, West Africa.

Asanko is managed by highly skilled and successful technical, operational and financial professio nals. The

Company is strongly committed to the highest standards for environmental management, social

responsibility, and health and safety for its employees and neighbouring communities.

3

Forward-Looking and other Cautionary Information

This release includes certain statements that may be deemed "forward-looking statements". All statements in this

release, other than statements of historical facts, that address estimated resource quantities, grades and contained

metals, possible future mining, exploration and development activities, are forward-looking statements.

Although the Company believes the forward-looking statements are based on reasonable assumptions, such statements

should not be in any way construed as guarantees of future performance and actual results or developments may differ

materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from

those in forward-looking statements include market prices for metals, the conclusions of detailed feasibility and technical

analyses, the timely renewal of key permits, lower than expected grades and quantities of resources, mining rates and

recovery rates and the lack of availability of necessary capital, which may not be available to the Company on terms

acceptable to it or at all. The Company is subject to the specific risks inherent in the mining business as well as general

economic and business conditions. For more information on the Company, Investors should review the Company's annual

Form 20-F filing with the United States Securities Commission and its home jurisdiction filings that are available at

www.sedar.com.

Neither Toronto Stock Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility

for the adequacy or accuracy of this release.

Cautionary Note to US Investors Regarding Mineral Reporting Standards:

Asanko has prepared its disclosure in accordance with the requirements of securities laws in effect in Canada, which

differ from the requirements of US securities laws. Terms relating to Mineral Resources in this press release are defined

in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects under the guidelines set

out in the Canadian Institute of Mining, Metallurgy, and Petroleum Standards on Mineral Resources and Mineral

Reserves. The Securities and Exchange Commission (the “SEC”) permits mining companies, in their filings with the SEC,

to disclose only those mineral deposits that a company can economically and legally extract or produce. Asanko uses

certain terms, such as, “Measured Mineral Resources”, “Indicated Mineral Resources”, “Inferred Mineral Resources” and

“Probable Mineral Reserves”, that the SEC does not recognize (these terms may be used in this press release and are

included in the public filings of Asanko which have been filed with securities commissions or similar authorities in

Canada).