Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GAMA.V ·

Gamma Resources Announces Filing of NI 43-101 Technical Report for the Mesa Arc Project in New Mexico and Outlines Phased Exploration Program

Resource Estimates Technical Reports (NI 43-101)

Gamma Resources Announces Filing of NI 43-101 Technical Report for the

Mesa Arc Project in New Mexico and Outlines Phased Exploration Program

Vancouver, British Columbia, January 13 2026 – Gamma Resources Ltd. (TSX -V: GAMA;

OTCPK: MLLOF; FRA: MRDN) (“Gamma” or the “Company”) is pleased to announce that it will file

an independent NI 43 -101 Technical Report (the “ Technical Report”) for its Mesa Arc Project (the

“Project”), supporting the Company’s advancement of the asset and outlining a clear path forward for

exploration.

Technical Report Highlights

• Extensive Historical Exploration Provides Strong Validation – The Project benefits from

a substantial historical dataset, including more than 900 drill holes completed in the

surrounding area by prior operators such as United Nuclear, Anaconda, ARCO, and Magnum

Uranium, confirming the presence of uranium mineralization and providing a strong foundation

for modern exploration.

• Proven Geological Model with Recognized Analogues – Mineralization is hosted within the

Jackpile Member of the Morrison Formation, a proven stratigraphic unit that has supported

significant uranium production elsewhere across the western United States.

• Shallow, Predictable Target Horizon – Based on regional stratigraphy and historical drilling,

the targeted mineralized horizon is expected to occur at depths of approximately 300 to 350

feet, supporting the use of cost-effective reverse-circulation (RC) drilling methods.

• Clear, Phased Exploration Strategy to Advance the Project – The Technical Report

outlines a two-phase exploration program, beginning with drill validation of historical intercepts

followed by geophysics and targeted follow -up drilling, providing a disciplined and capital -

efficient pathway to advance the Project.

Recommended Phased Work Program

Based on the conclusions and recommendations of the Technical Report, Gamma has outlined a

phased exploration program, subject to permitting and regulatory approvals, designed to efficiently

advance the Mesa Arc Project:

• Phase 1 Validation of Historical Drilling – Phase 1 is intended to validate historical drilling

results through the twinning of select historical boreholes that intersected the mineralized

horizon. This phase is expected to include approximately 10 RC drill holes targeting the most

prospective historical intercepts. The estimated budget for Phase 1 is approximately

US$300,000.

• Phase 2 Geophysics and Follow-Up Drilling – Subject to the results of Phase 1, Phase 2 is

expected to include a passive seismic geophysical survey to better define the geometry and

location of potentially mineralized paleochannel systems within the Jackpile Member of the

Morrison Formation. Results from the survey would be used to design a follow-up RC drilling

program of approximately 20 holes to test priority targets. The estimated budget for Phase 2

is approximately US$1.2 million.

Permitting for the proposed exploration activities is ongoing, and the Company will provide updates as

approvals are received and exploration programs commence.

The Technical Report was prepared by Bengt Anders Hogrelius, M.Sc., RPGeo, SME -RM, of

Hogrelius Geological Consultants, in accordance with National Instrument 43 -101 – Standards of

Disclosure for Mineral Projects , and provides a comprehensive evaluation of the Project’s geology,

mineralization, historical exploration, and future exploration potential.

Gabriel Alonso-Mendoza, President and CEO of Gamma commented, “With strong and accelerating

tailwinds for the U.S. uranium industry, we are excited to advance the Mesa Arc Project following the

filing of our NI 43-101 Technical Report. The report confirms that Mesa Arc hosts prospective geology

consistent with uranium-vanadium mineralization found elsewhere in the Morrison Formation across

the Colorado Plateau, and supports a disciplined, phased, and low-cost exploration program designed

to validate historical work and create shareholder value.”

The Technical Report will be filed on SEDAR+ within 45 days of this news release under the

Company’s profile at www.sedarplus.ca.

Corporate Update

The Company has amended the payment terms of the lease agreement with C Bar B Properties

Corporation (“C Bar B”), first announced in the Company’s news release on April 16, 2025. The

Company has paid an aggregate amount of US$200,000 of the $250,000 initial consideration and has

agreed with C Bar B to defer the payment of $50,000 until April 14, 2026, at which time the Company

will pay US$300,000 and will also waive its 90 -day cure period if the payment is not made. There is

no change to the payments of US$250,000 due on each of April 14, 2027 and April 14, 2028.

Qualified Person

Mark Saxon (Fellow of AusIMM, Member of AIG), a qualified person for the purposes of National

Instrument 43-101 - Standards of Disclosure for Mineral Projects and a director of the Company, has

reviewed and approved the scientific and technical disclosure in the news release.

About the Mesa Arc Uranium Project – New Mexico

The Mesa Arc Project comprises 41 lode mining claims in northern New Mexico, recently expanded

by 185 new federal claims to cover approximately 4,520 acres. The district hosts documented historical

uranium production and mineralization (McLemore & Chenowet h, 2017), with previous drilling by

Magnum Uranium Corp. (2006) outlining a non -NI 43-101 historical estimate of 2.5 –3.0 million lbs

U₃O₈*.

About Uranium

In March 2025, President Trump issued Executive Order 14156 formally designating uranium as a

U.S. critical mineral.1 This legal shift empowers federal agencies under the Defense Production Act to

fast-track permitting, direct federal procurement, and prioritize uranium mining, conversion,

enrichment, and fuel fabrication infrastructure across the country. A follow -on executive package on

May 23 accelerated regulatory reform across the nuclear fuel cycle , including licensing of advanced

reactors (Gen III/IV), small modular reactors (SMRs), microreactors, and establishing a goal of 400

GW of nuclear capacity by 2050 —creating a supportive policy ecosystem for domestic uranium

producers and enabling secure HAL EU supply chains for next -generation reactors. 2 These efforts

have been reinforced by a suite of recent federal initiatives, including a $2.7 billion DOE awards

package to boost domestic uranium enrichment capacity, specifically targeting enhancement of

HALEU and low -enriched uranium infrastructure to reduce reliance on foreign sources and support

advanced reactor development.3

Meanwhile, the uranium market continues to face a structural supply –demand deficit, with primary

production projected to lag reactor requirements over the coming decade. Years of under investment

and tightened geopolitical trade have compressed inventories and elevated prices. Spot uranium

prices recovered from lows near US $63/lb in early 2025 to US $82.00/lb as of early 20264, while long-

term contracts and forward ceilings continue rising as utilities secure supply. 5 At the same time,

nuclear energy is increasingly viewed as a reliable, carbon-free backbone for both energy security and

climate goals, with Western governments doubling down on nuclear deployment and investing in

domestic fuel chains, SMRs, and advanced reactor technologies.6 These tailwinds explain why the

Company feels strategically positioned in uranium, eager to help to supply a market poised for

structural growth and supported by strong public policy frameworks.

1 White House: Immediate Measures to Increase American Mineral Production (Executive Order ED 14156,

March 2025) https://www.whitehouse.gov/presidential-actions/2025/03/immediate-measures-to-increase

american-mineral-production/

2 K&L Gates: President Trump Issues Sweeping Executive Orders Targeting Nuclear Regulation (May 23,

2025) https://www.klgates.com/President-Trump-Issues-Sweeping-Executive-Orders-Targeting-Nuclear

Regulation-6-5-2025

3 US awards $2.7 billion worth of orders to boost uranium enrichment | Reuters

4 UxC U3O8 Daily Spot Price based on 10/7/2025

5 Sprott: Uranium’s Mid-Year Momentum (June 2025 pricing and equity

data) https://sprott.com/insights/uranium-s-mid-year-momentum/

6 Reuters: Trump’s nuclear energy orders would boost uranium prices, investments (May 27,

2025) https://www.reuters.com/business/energy/trumps-nuclear-energy-orders-would-boost-uranium-

prices investments-experts-say-2025-05-27/

About Gamma Resources Ltd.

Gamma Resources Ltd. is a U.S.-focused uranium exploration and development company advancing

high-quality assets in the Mountain West region. The Company’s portfolio includes the Green River

Project in Utah, comprising 1,100 acres near prominent regional producers, and the Mesa Arc Project

in New Mexico, a strategic land position now totaling 4,520 acres that includes historic uranium

resources in the Chama Basin. Management believes the Company is uniquely positioned to benefit

from the unprecedented policy and market tailwinds reshaping the U.S. nuclear landscape, and help

meet this demand with responsibly sourced, U.S.-based uranium supply.

Gamma trades on the Toronto Venture Exchange (TSX -V: GAMA), OTC (OTCPK: MLLOF) and

Frankfurt (FRA: MRDN).

For Further Information

Mr. Gabriel Alonso-Mendoza, President and CEO

Email: [email protected]

Tel: (833) 854-6826

www.gammaresourcesltd.com

Forward-looking Statements

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release. Statements made in this news release, other tha n purely historical information, including

statements relating to the Company’s future plans and objectives or expected results, may include

forward-looking statements. forward-looking statements are based on numerous assumptions and are

subject to all of the risks and uncertainties inherent in resource exploration and development. As a

result, actual results may vary materially from those described in the forward-looking statements.