Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GAL.V ·

Galantas GOLD to Commence Drilling at the 10 Km Gairloch GOLD-Rich VMS Project

Exploration Programs

GALANTAS GOLD TO COMMENCE DRILLING AT THE 10 KM GAIRLOCH

GOLD-RICH VMS PROJECT

April 18, 2023 , TORONTO, CANADA – Galantas Gold Corporation (TSX -V & AIM: GAL;

OTCQX: GALKF) (“Galantas” or the “Company”) is pleased to announce that drilling at the newly

acquired Gairloch Project will commence in the coming weeks . Drill mobilization has

commenced for an initial 800-metre program targeting the Kerry Road deposit, including testing

the depth potential of near surface mineralization.

Historical Exploration Highlights*:

• 11.29 grams per tonne (g/t) gold (Au), 0.58% copper (Cu), 2.44 g/t silver (Ag), and 0.19%

zinc (Zn) over 16 metres.

• 3.16 g/t Au, 0.90% Cu, 3.39 g/t Ag and 0.51% Zn over 18 metres.

• 1.46 g/t Au, 1.86% Cu, 1.65 g/t Ag, and 1.08% Zn over 20 metres.

• 9.59 g/t Au, 1.17% Cu, 2.58 g/t Ag, and 0.55% Zn over 5.5 metres.

• 1.5 g/t Au, 5.92% Cu, 16.5 g/t Ag, and 0.54% Zn over 6 metres.

*True widths not known. Historical drill hole data obtained from logs written by Consolidated Gold Fields Limited in 1979 and

1980, scanned copies supplied by the British Geological Survey.

The drill program aims to target the mineralized outcrops at Kerry Road, testing the deposit down

dip southeastwards as well as the lateral extension to t he northeast and southwest. A deeper

hole (~350 metres) is planned to test beneath the Kerry Road deposit as historical drilling ceased

after intercepting the main sulphide horizon. This stratigraphic hole will provide Galantas with

better understanding of the local geology, as well as test for other sulph ide horizons expected

to be found in the area based on the knowledge of other similar deposits around the world.

Mario Stifano, CEO of Galantas, commented: “ We are eager to kick-off drilling at this

underexplored region of Scotland. The Gairloch Project offers a fantast ic opportunity for

Galantas to diversify and build its portfolio having acquired some of the best exploration ground

in the country in a gold-bearing volcanogenic massive sulphide (VMS) setting with known

mineralization over 10 km and a number of high-priority targets that have yet to be tested.”

Gairloch Project Overview

The Kerry Road deposit is a stratabound, Besshi-style, VMS gold-copper-zinc deposit exposed

at surface. It is one of the oldest known Besshi deposits . The host rocks at Gairloch appear to

be geologically similar to those in the Trans -Hudson Orogen in Manitoba and Saskatchewan

which contain the prolific Flin-Flon and Snow Lake VMS mining camps.

The Kerry Road deposit was discovered by Consolidated Goldfields in the 1970s where 87 holes

were drilled over 9,189 metres. No commercial exploration has taken place since then until 2018

when drilling by Gree nOre Gold PLC (GreenOre) confirmed the presence of mineralization at

Kerry Road by intercepting 1 .0 g/t gold , 0.9% copper and 0.6% zinc over 17 metres (see

Galantas’ news release dated January 26, 2023) . Rock chip sampling conducted by GreenOre

in 2018 also identified elevated levels of cobalt in bedrock.

The Kerry Road deposit lies within the Gairloch Schist Belt , a Paleoproterozic volcanic arc

terrane extending over 25 km. The unit of interest is a quartz carbonate schist with the main

minerals being chalcopyrite, sphalerite, pyrite and pyrrhotite. Limited exploration has been

conducted over the area in recent years . The British Geological Survey (BGS) identified an

outcrop of 4 g/t Au in their MRP146 report of the area, associated with a significant geophysical

anomaly approximately 10 km south of the Kerry Road deposit, yet the area remains untested.

This area is one of multiple targets identified by Galantas for follow-up exploration.

Galantas has acquire d a 100% interest and the exclusive rights to explore and develop the

Gairloch Project, a 217 km² mineral licence area covering the Gairloch Schist Belt.

Qualified Person

The historical technical information in this release has been reviewed and approved by Gavin

Berkenheger (CGeol, EurGeol) who is considered, by virtue of his education, experience and

professional association, a Qualified Person under the terms of NI 43 -101. Mr. Berkenheger is

not considered independent under NI 43-101 as he is a consultant of Galantas Gold Corporation.

Quality Assurance / Quality Control and Data Verification

Mr. Berkenheger has verified the data disclosed, including sampling, analytical, and test data

underlying the information or opinions contained in the written disclosure as required by section

3.1 of NI 43-101.

Historical grades reported from the GreenOre database that was conducted by the company

from 2018 to 2021 was overseen by the author who was a Qualified Person at the time using

appropriate Quality Assurance and Quality Control (QA/QC) protocols with respect to the

insertion of blanks, standards and duplicates in to the sample stream prior to dispatch to ALS

Laboratory, which is consistent with industry best practices.

During GreenOre’s drilling , the diamond drill core (HQ Size) was logged, photographed and

marked for sampling. There was insignificant core loss. A diamond tipped core saw split the core

with one half bagged and tagged for assay and the other returned to the labeled core box and

stored. Sealed and tagged bags were shipped to ALS Laboratories in Loughrea, County Galway

where they were crushed to 70% less than 2mm, riffle split off 1kg then pulverize split to better

than 85% passing 75 microns (PREP-31B). Gold fire assay and AAS finish was conducted with

a 30g sample (au -AA25). Multi element analysis was completed by high -grade four acid ICP -

AES (ICP61a). The QP has reviewed the QA/QC in relation to these drill results and is satisfied

that the results as reported are reliable.

Historical grades reported from the Consolidated Gold Fields data is thought to be of good quality

as the company, which was listed on the London Stock Exchange and was once a constituent

of the FTSE 100 Index, demonstrated best practices at the time and was overseen by a qualified

person. After appropriate logging of drill core (BQ size), mineralized sections were split using a

manual splitter initially and later using a diamond core saw. There was insignificant core loss.

Details of the sample preparation and analysis could not be verified. The laboratory used was

the Wheal Jane Laboratory in Cornwall which was consi stent with industry best practice at the

time. Full details of the QA/QC could not be verified either, but grade data was reviewed , in

which select samples of drill core were re -assayed at three different laboratories. There were

good correlations with the re-check samples in relation to zinc and copper but some significant

discrepancies were noted in some of the gold re -check samples. It is not known whether this

was due to laboratory error or due to a “nugget effect” whereby larger grains of gold may be

missed or they may enhance the representative sample used to determine the overall grade.

GreenOre’s drill hole which was a re-drill of Consolidated Gold Fields’ hole GBH03 demonstrated

similar, in fact enhanced grades of the historical hole, corroborating the reliability of the historical

data. Only 20% of the historic al drill core remains and this was observed by the author at the

British Geological Survey’s core storage in Keyworth, Nottingham. Re -assay of historical core

has not yet been conducted but may be difficult due to the size of representative core remaining.

The QP having reviewed the results in relation to the historic al data is satisfied that the results

as reported are reliable.

Historical Reports

Data relating to Consolidated Gold Fields is held by the British Geological Survey listed under

MEIGA Project number 173:

• Gairloch Exploration report, December 21, 1977, E. Jones, Consolidated Gold Fields

Limited

• Project Gairloch Technical Report and Work Programme, August 18, 1978,

Consolidated Gold Fields Limited

• AE173 Gairloch Phase 4, 1978, Consolidated Gold Fields Limited

• Technical Report Phase 2: July 1, 1978 to June 1979, Consolidated Gold Fields Limited

• Technical Report Phase 3: July 1, 1979 to October 1979, Consolidated Gold Fields

Limited

• The Petrology, Ore Mineralogy, Geochemistry and Paragenesis of Rocks at Gairloch

Site, C.M. Rice, Department of Geology and Mineralogy, University of Aberdeen

• Consolidated Gold Fields Limited, Diamond Drill Core Records, Project Gairloch, DDH

No. GBH01 to GBH87

• Gairloch Project Phase 4, Consolidated Gold Fields Limited

• Technical Report: July 1,1980 to June 30, 1981, Phase 4a, Consolidated Gold Fields

Limited

• Technical Report: July 1,1981 to May 31, 1982, Phase 4b, Consolidated Gold Fields

Limited

Data relating to GreenOre Gold can be found in news releases dated October 16, 2018 and

March 4, 2020 that are posted on its website at https://greenoregold.com/.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in

the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy

of this release.

The information contained within this announcement is deemed to constitute inside information

as stipulated under the retained EU law version of the Market Abuse Regulation (EU) No.

596/2014 (the "UK MAR") which is part of UK law by virtue of the European Union (Withdrawal)

Act 2018. The information is disclosed in accordance with the Company's obligations under

Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is

now considered to be in the public domain.

About Galantas Gold Corporation

Galantas Gold Corporation is a Canadian public company that trades on the TSX Venture

Exchange and the London Stock Exchange AIM market, both under the symbol GAL. It also

trades on the OTCQX Exchange under the symbol GALKF. The Company's strategy is to create

shareholder value by operating and expanding gold production and resources at the Omagh

Project in Northern Ireland , and exploring the Gairloch Project hosting the Kerry Road gold -

bearing VMS deposit in Scotland.

Enquiries

Galantas Gold Corporation

Mario Stifano: Chief Executive Officer

Email: [email protected]

Website: www.galantas.com

Telephone: +44(0)28 8224 1100

Grant Thornton UK LLP (AIM Nomad)

Philip Secrett, Harrison Clarke, George Grainger, Samuel Littler

Telephone: +44(0)20 7383 5100

SP Angel Corporate Finance LLP (AIM Broker)

David Hignell, Charlie Bouverat (Corporate Finance)

Grant Barker (Sales & Broking)

Telephone: +44(0)20 3470 0470

Forward-Looking Statements

This press release contains forward-looking statements within the meaning of the United States Private Securities

Litigation Reform Act of 1995 and applicable Canadian securities laws, including results of exploration programs at

the Gairloch Project. Forward-looking statements are based on estimates and assumptions made by Galantas in

light of its experience and perception of historical trends, current conditions and expected future developments, as

well as other factors that Ga lantas believes are appropriate in the circumstances. Many factors could cause

Galantas’ actual results, the performance or achievements to differ materially from those expressed or implied by

the forward looking statements or strategy, including: gold pri ce volatility; discrepancies between actual and

estimated production, actual and estimated metallurgical recoveries and throughputs; mining operational risk,

geological uncertainties; regulatory restrictions, including environmental regulatory restrictions and liability; risks of

sovereign involvement; speculative nature of gold exploration; dilution; competition; loss of or availability of key

employees; additional funding requirements; uncertainties regarding planning and other permitting issues; and

defective title to mineral claims or property. These factors and others that could affect Galantas’ forward -looking

statements are discussed in greater detail in the section entitled “Risk Factors” in Galantas’ Management

Discussion & Analysis of the financial statements of Galantas and elsewhere in documents filed from time to time

with the Canadian provincial securities regulators and other regulatory authorities. These factors should be

considered carefully, and persons reviewing this press release should not place undue reliance on forward-looking

statements. Galantas has no intention and undertakes no obligation to update or revise any forward -looking

statements in this press release, except as required by law.