Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

GAL.V ·

Galantas Gold Provides Update on the Omagh Gold Project

Corporate Updates

Galantas Gold Provides Update on the Omagh Gold Project

TORONTO, Feb. 23, 2023 -- Galantas Gold Corporation (TSX-V & AIM: GAL; OTCQX: GALKF) (“Galantas” or the “Company”)

is providing an update on the Omagh Project in Northern Ireland.

The Company is targeting an updated NI 43-101-compliant mineral resource estimate by the end of Q2 2023 to incorporate an

additional 7,800 metres of drilling with many of the drill holes indicating higher gold grades and thicker widths in dilation zones.

Internal modelling indicates that the grades and widths of mineralization increase within the dilation zones at the Kearney and

Joshua veins. At Kearney, examples of drill holes that fall within dilation zones are drill hole FR-DD-22-UG-181 at a vertical

depth of 150 metres that intersected 7 metres (estimated 3.3 metres true thickness) of 31.7 grams per tonne (g/t) gold, and

drill hole FR-DD-22-UG-186 at a vertical depth of 143 metres that intersected 4.4 metres (estimated 3.0 metres true thickness)

of 31.8 g/t gold (see Galantas’ press releases dated March 21, 2022 and August 4, 2022).

Given the potentially high grade and thicker widths within dilation zones below the current underground development, the

Company is proceeding with a sustainable mine plan targeted by the end of Q2 2023 that will allow the Company to develop at

these lower levels in order to optimize production. The mine plan will determine the suitability of targeting initially 10,000 gold

ounces a year, with the potential for this to increase to 20,000 ounces a year, followed by staged expansions. The plan is

expected to include development options for mining at the lower levels of the Kearney Vein and to the north and south

extensions of the vein’s existing workings.

The Company has also completed its first hole targeting the Kerr Vein from underground, approximately 200 metres north of

the known surface exposure and approximately 200 metres south of a historic base-of-till gold anomaly. Quartz veinlets

associated with the sulphide minerals, pyrite and galena, have been recorded in the core within the target zone supporting

management’s view that Kerr may extend northwards between the high-grade Joshua and Kearney veins. Historical Pionjar

drilling (base-of-till sampling) by RioFinex in the 1980s identified 8 g/t gold between the Kearney and Joshua veins,

approximately 100 metres north of the development drift. The Company intends to drill additional underground holes at Kerr

from the crosscut development.

At the Joshua Vein, a detailed geotechnical assessment is planned to identify the optimal location for the raisebore hole which

will be used as a secondary egress. Management is also reviewing the location for a portal at Joshua to optimize access to

the north and south extensions for future production. 

The recruitment and retention of underground mining crews at the Omagh Project has continued to be a challenge due to the

consequences of only being able to recruit miners from the UK and Ireland, greatly impacting productivity. A core group of

experienced miners is now focused on plans for mine and waste development, prioritizing access to the high-grade dilation

zones below the current underground workings as the Company looks to transition to contract mining with Q.M.E. Mining

Services (NI) Ltd. as a potential manpower, mining and development solution. The Company will establish a new mine

optimization plan to develop to the high-grade dilation zones at depth to maximize productivity.   

Qualified Persons

Scientific and technical disclosures relating to exploration in this press release have been reviewed and approved by Dr. Sarah

Coulter, who is considered, by virtue of her education, experience and professional association, a Qualified Person under the

terms of NI 43-101. Dr. Coulter is not considered independent under NI 43-101 as she is the Chief Geologist of Galantas Gold

Corporation.

Production and development disclosures in this press release have been reviewed and approved by Brendan Morris, who is

considered, by virtue of his education, experience and professional association, a Qualified Person under the terms of NI 43-

101. Mr. Morris is not considered independent under NI 43-101 as he is the Chief Operating Officer of Galantas Gold

Corporation.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

The information contained within this announcement is deemed to constitute inside information as stipulated under the

retained EU law version of the Market Abuse Regulation (EU) No. 596/2014 (the "UK MAR") which is part of UK law by virtue

of the European Union (Withdrawal) Act 2018. The information is disclosed in accordance with the Company's obligations

under Article 17 of the UK MAR. Upon the publication of this announcement, this inside information is now considered to be in

the public domain.

About Galantas Gold Corporation

Galantas Gold Corporation is a Canadian public company that trades on the TSX Venture Exchange and the London Stock

Exchange AIM market, both under the symbol GAL. It also trades on the OTCQX Exchange under the symbol GALKF. The

Company's strategy is to create shareholder value by operating and expanding gold production and resources at the Omagh

Project in Northern Ireland.

Enquiries

Galantas Gold Corporation

Mario Stifano: Chief Executive Officer

Email: [email protected]

Website: www.galantas.com

Telephone: +44(0)28 8224 1100

Grant Thornton UK LLP (AIM Nomad)

Philip Secrett, Harrison Clarke, George Grainger, Samuel Littler

Telephone: +44(0)20 7383 5100

SP Angel Corporate Finance LLP (AIM Broker)

David Hignell, Charlie Bouverat (Corporate Finance)

Grant Barker (Sales & Broking)

Telephone: +44(0)20 3470 0470

Forward-Looking Statements

This press release contains forward-looking statements within the meaning of the United States Private Securities Litigation

Reform Act of 1995 and applicable Canadian securities laws, including the outcome of exploration and development plans,

operations and prospects of the Company. Forward-looking statements are based on estimates and assumptions made by

Galantas in light of its experience and perception of historical trends, current conditions and expected future developments, as

well as other factors that Galantas believes are appropriate in the circumstances. Many factors could cause Galantas’ actual

results, the performance or achievements to differ materially from those expressed or implied by the forward looking

statements or strategy, including: gold price volatility; discrepancies between actual and estimated production, actual and

estimated metallurgical recoveries and throughputs; mining operational risk, geological uncertainties; regulatory restrictions,

including environmental regulatory restrictions and liability; risks of sovereign involvement; speculative nature of gold

exploration; dilution; competition; loss of or availability of key employees; additional funding requirements; uncertainties

regarding planning and other permitting issues; and defective title to mineral claims or property. These factors and others that

could affect Galantas’ forward-looking statements are discussed in greater detail in the section entitled “Risk Factors” in

Galantas’ Management Discussion & Analysis of the financial statements of Galantas and elsewhere in documents filed from

time to time with the Canadian provincial securities regulators and other regulatory authorities. These factors should be

considered carefully, and persons reviewing this press release should not place undue reliance on forward-looking statements.

Galantas has no intention and undertakes no obligation to update or revise any forward-looking statements in this press

release, except as required by law.