Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FWZ.V ·

Fireweed Zinc Acquires Mactung Tungsten Project Expands Critical Minerals Portfolio

Mergers & Acquisitions Property Options & Staking

Page 1 of 7

NEWS RELEASE

June 7, 2022 TSXV: FWZ

OTCQB: FWEDF

FSE:20F

Fireweed Zinc Acquires Mactung Tungsten Project

Expands Critical Minerals Portfolio

Vancouver, British Columbia: FIREWEED ZINC LTD. (“Fireweed” or the “Company”) (TSXV: FWZ;

OTCQB: FWEDF) is pleased to announce the signing of a binding Letter of Intent (LOI) for the acquisition

of 100% interest in the Mactung Tungsten Project located in Yukon and Northwest Territories, Canada,

immediately adjacent to its Macmillan Pass Zinc-Lead-Silver Project.

Highlights

• Mactung is one of the largest and highest -grade tungsten deposits in the world and one of the few

potential sources of scale for this critical metal outside of China.

• Approximately 38,000 m of historic drilling 1 outlined a large, high -grade tungsten resource and

produced a positive historic feasibility study 2.

• Mactung is located within the traditional territories of the Kaska Dena and First Nation of Na-Cho

Nyäk Dun, and the Sahtú Settlement Area.

• Fireweed hold a right to a 100% interest in the Mactung project through a binding LOI with the

Government of the Northwest Territories (“GNWT”).

• The Mactung deposit is 13 kilometres north of F ireweed’s Tom deposit and is also accessible by

the North Canol Highway providing potential for future synergies.

Executive Statements

Fireweed CEO Brandon Macdonald commented, “While Macmillan Pass continues to be our flagship

project, the recent staking of Gayna River and the addition of Mactung turns Fireweed into one of the

leading critical mineral exploration companies. We now have not only one of the largest undeveloped

zinc resources in the world at our Macmillan Pass Project, but also one of the world’s largest and highest-

grade undeveloped tungsten projects at the advanced stage Mactung Project. With both zinc and tungsten

being designated as critical minerals by Canada, the US, and the EU, Fireweed is positioned to leverage

the transition to a sustainable green economy. We are excited to be advancing both projects under the

Fireweed umbrella to not just maximize value for Fireweed shareholders, but to also create increased

opportunities for local Indigenous groups and the people of both Yukon and Northwest Territories.”

Mactung Project Overview

Mactung is one of the largest and highest -grade tungsten deposits in the world. It is an advanced stage

project with extensive drilling , engineering, metallurgy, geotechnical, and environmental baseline data

collected by previous owners that supported a Feasibility study in 20092. Skarn mineralization is developed

in carbonate rocks near the contact with a granite intrusion. Historic 2007 indicated resources1 totaled 33.0

million tonnes grading 0.88 % WO 3 (tungsten trioxide) plus historic inferred resources of 11.8 million

tonnes grading 0.78% WO 3. The 37.6 km2 property is located adjacent to Fireweed’s Macmillan Pass

Property (Figure 1) and accessed by the same road providing potential for future project synergies.

Page 2 of 7

Mactung Deposit Location & History

The Mactung Property adjoins Fireweed’s Macmillan Pass Property and straddles the boundary between

the Yukon and Northwest Territories . The Mactung tungsten deposit is located 13 km north of the Tom

deposit (Figure 1). The Mactung Property can be reached by an access road that joins the North Canol

Highway 230 km from Ross River, or by the government-maintained Macmillan Pass airstrip near the Tom

deposit.

Mactung was discovered and staked in 1962 by an Amax geologist. Extensive drilling, metallurgical

testing, and multiple historical resource estimates were completed over the next twenty years. The

property changed ownership several times and was subsequently acquired by the North American

Tungsten Corporation (NATC) in 1997. In 2007 NATC published updated mineral resources (see below)

and in 2009 published a positive feasibility study (available at www.sedar.com under the NATC profile).

The Yukon Environmental and Socio-economic Assessment Board issued a positive screening report for

the Mactung Project in June 2014 and recommended it proceed to licensing without review, subject to

terms and conditions, which were subsequently adopted and supplemented by the Yukon Government in

its September 2014 Decision Document. However, in June 2015 NATC filed for and was granted creditor

protection mainly related to operation of their Cantung mine located further south. The GNWT purchased

the Mactung Project for $4.5 million in the fall of 2015, and subsequently obtained a Class 4 Mining

Land Use Approval in 2020. Fireweed Zinc has now signed a binding LOI for acquisition of the Mactung

Project with the GNWT (see details below).

Sustainability Context

Fireweed respectfully acknowledges that the Mactung Project is located within the traditional territories of

the Kaska Dena and First Nation of Na-Cho Nyäk Dun, and the Sahtú Settlement Area. For the benefit of

present and future generations, Fireweed will conduct mineral development activities in a sustainable

manner by working collaboratively with Indigenous groups and local communities, establishing a respectful

and safe working environment , achieving a high standard of environmental stewardship , and undertaking

studies and implementing measures to address local interests and issues.

Mactung Geology & Mineralization

Mactung is a tungsten skarn deposit located on the eastern margi n of the Selwyn basin in the Canadian

Cordillera’s Tombstone-Tungsten Belt (TTB). The mid-Cretaceous TTB spans Alaska, Yukon, and NWT,

and hosts many other significant mineral deposits. The Mactung deposit is associated with Tungsten suite

intrusions that intruded late Precambrian to Palaeozoic, variably metamorphosed clastic and interbedded

carbonate rocks of the Selwyn basin . The tungsten mineralization at Mactung is comprised mostly of

scheelite (CaWO4) and is dominated by calcic mineral assemblages associated with abundant pyrrhotite

that developed within permeable limestone units of the Cambrian-Ordovician host rocks . Although the

previous feasibility study considered only underground development, the vast majority of tungsten

mineralization at Mactung can be found within 200 m from surface.

Mactung Historic Drilling and Historic Estimates

Geological mapping and surface sample programs were conducted in the early and mid-1960’s, with drilling

beginning in 1968. To date, approximately 38,000 m of drilling in 312 holes have been completed on the

property, in addition to multiple historic resource estimates . An adit was opened in 1973 to enable

underground exploration and bulk sampling; at least 1,200 metres of lateral underground development has

occurred, including bulk samples of 270 tonnes in 1973, 3.5 tonnes in 1979, 650 tonnes in 1983, and 79

tonnes in 2005, enabling extensive metallurgical test work2.

Page 3 of 7

Year Zone Territory

Historic Estimate

Type

Tonnage

(million tonnes)

Grade

(% WO3)

Cut-Off Grade

(% WO3)

2009 2B YT only

Probable Mineral

Reserve2 10.79 1.187% 0.616%

2007

2B, 3D

3E, 3F

Yukon

NWT

Indicated Mineral

Resource1 33.03 0.88% 0.5%

2007

2B, 3D

3E, 3F

Yukon

NWT

Inferred Mineral

Resource1 11.86 0.78% 0.5%

Table 1*. Most recent historic mineral resource and mineral reserve estimates from reports on

www.sedar.com under NATC profile . (See Cautionary and Background Statements regarding Historic

Minerals Resources below.)

Mactung Future Plans

Following final due diligence work and signing of the definitive asset purchase agreement with GNWT,

Fireweed will undertake validation programs on previous work in order to support the development of a

new mineral resource estimate for the project. Fireweed plans to follow this work with a new PEA on the

project in 2023 and will also be evaluating synergies with the Macmillan Pass Project for the future.

About Tungsten

Tungsten is the hardest metal with the highest melting point which makes it an important and often essential

metal for use in the automotive, technology, energy, military and manufacturing industries. World tungsten

production is dominated by China and t here is currently little Western tungsten production which has led

tungsten to be listed as a c ritical mineral by many governments, including Canada . The Canadian

government has developed several initiatives to support and advance the exploration and mining of critical

metals in Canada, including zinc and tungsten.

Terms of the Mactung Acquisition Agreement

Fireweed and the GNWT have signed a binding Letter of Intent (LOI) under which the GNWT will sell the

Mactung Project to Fireweed for a total purchase price of C$15,000,000 staged as follows:

1. Fireweed pays the GNWT the sum of $1,500,000 upon execution of this binding LOI;

2. Fireweed will pay to GNWT an additional $3,500,000 within 18 months upon finalization of the

definitive agreement;

3. Fireweed will pay to GNWT an additional $5,000,000 upon Fireweed announcing its intention to

construct a mine on either the Mactung Project or any portion of the mineral property interests

controlled by Fireweed in the Yukon, commonly known as the Macmillan Pass project; and

4. Fireweed will pay to GNWT an additional $5,000,000 upon Fireweed announcing its intention to

construct a mine on the Mactung Project.

The final definitive agreement is targeted before the end of 2022, after which ownership of the project assets

will be transferred to Fireweed. Mactung carries an existing NSR Royalty of 4% which is held by a third

party, 2% of which can be purchased at any time for $2.5M. This binding LOI does not include

responsibility for any assets or liabilities related to the defunct Cantung mine located further south; this LOI

is solely related to the Mactung Project (Fig. 1).

Qualified Person Statement

Technical information in this news release has been approved by Brandon Macdonald, P.Geo., and a

‘Qualified Person’ as defined under Canadian National Instrument 43-101.

Page 4 of 7

About Fireweed Zinc Ltd. (TSXV: FWZ; OTCQB: FWEDF; FSE:20F ): Fireweed Zinc is a public

mineral exploration company on the leading edge of critical minerals project development. The Company

has three projects located in northern Canada:

• Macmillan Pass Zinc -Lead-Silver Project: Fireweed owns 100% of the district-scale 940 km2

Macmillan Pass p roject in Yukon, Canada, which is host to the Tom and Jason zinc -lead-silver

deposits with current Mineral Resources and a PEA economic study (see Fireweed news releases

dated 10th January 2018, and 23rd May 2018, respectively, and reports filed on www.sedar.com for

details) as well as the Boundary Zone, Boundary Zone West, Tom North Zone and End Zone which

have significant zinc-lead-silver mineralization drilled but not yet classified as mineral resources.

The project also includes large blocks of adjacent claims with known showings and significant

upside exploration potential. Plans for 2022 include a large drill program toward expanded mineral

resources and an updated PEA to include large new zones of mineralization defined since 2018

including Boundary Zones.

• Mactung Tungsten Project: The Company has a binding Letter of Intent to acquire 100% interest

in the 37.6 km2 Mactung Tungsten Project located adjacent to the Macmillan Pass Project. Mactung

contains historic resources that make it one of the largest and highest-grade undeveloped tungsten

resources in the world. Located in Canada, it is one of the rare large tungsten resources outside of

China.

• Gayna River Zinc-Gallium-Germanium Project: Fireweed has 100% of the 128.75 km2 Gayna

River project located 180 kilometres north of the Macmillan Pass P roject. It is host to extensive

critical minerals mineralization including zinc, gallium and germanium as well as lead and silver,

outlined by 28,000 metres of historic drilling and significant upside potential.

In Canada, Fireweed (TSXV: FWZ) trades on the TSX Venture Exchange. In the USA, Fireweed (OTCQB:

FWEDF) trades on the OTCQB Venture Market for early stage and developing U.S. and international

companies. Companies are current in their reporting and undergo an annual verification and management

certification process. Investors can find Real -Time quotes and market information for the Company on

www.otcmarkets.com. In Europe, Fireweed (FSE: 20F) trades on the Frankfurt Stock Exchange.

Additional information about Fireweed Zinc and its projects, including maps and drill sections can be found

on the Company’s website at www.FireweedZinc.com and at www.sedar.com .

ON BEHALF OF FIREWEED ZINC LTD.

“Brandon Macdonald”

CEO & Director

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary Statements

Forward Looking Statements

This news release may contain “forward-looking” statements and information relating to the Company and

the Macmillan Pass , Mactung and Gayna River Projects that are based on the beliefs of Company

Page 5 of 7

management, as well as assumptions made by and information currently available to Company

management. Such statements reflect the current risks, uncer tainties and assumptions related to certain

factors including but not limited to, without limitations, exploration and development risks, expenditure

and financing requirements, general economic conditions, changes in financial markets, the ability to

properly and efficiently staff the Company’s operations, the sufficiency of working capital and funding for

continued operations, title matters, First Nations relations, operating hazards, political and economic

factors, competitive factors, metal prices, relationships with vendors and strategic partners, governmental

regulations and oversight, permitting, seasonality and weather, technological change, industry practices,

and one-time events. Additional risks are set out in the Company’s prospectus dated May 9, 2017 and filed

under the Company’s profile on SEDAR at www.sedar.com. Should any one or more risks or uncertainties

materialize or change, or should any underlying assumptions prove incorrect, actual results and forward -

looking statements may vary materially from those described herein. The Company does not undertake to

update forward‐looking statements or forward‐looking information, except as required by law.

Cautionary and Background Statements regarding Historic Estimates

A 2007 Technical Report1 on the Mactung Tungsten Deposit prepared by Wardrop for the NATC reported

an Indicated Mineral Resource of 33,029 kt grading 0.88% WO 3 and an Inferred Mineral Resource of

11,857 kt grading 0.78% WO 3. The following assumptions were made during the calculation of this

historical Mineral Resource: 1.) CIM definitions (December 2005) were followed for the classification of

the mineral resources, 2.) Kriging interpolation estimates were reported at a block cut -off of 0.5% WO 3,

which are based on assays capped at unique levels for each zone, 4.) Blocks were modeled as 10 m x 10 m,

with a minimum vertical thickness of 4.5 m. Grades were diluted accordingly, if required, as modeled

mineralized envelopes range in thickness from 1 m to over 50 m. Average thickness of the mineralized

lenses is approximately 18 m, 5.) Tonnage was estimated by multiplying the block’s respective volume by

the specific gravity (“SG”). The SG was based on densities established by an underground bulk sample

taken from the 2B zone as well as data used in previous studies. Wardrop did not review any data or

calculations related to the SG determination.

A 2009 Amended Technical Report2 on the Mactung Property produced by Wardrop for NATC reported a

probable mineral reserve estimate of 10,790 kt grading 1.1869% WO 3. The following assumptions were

made during the calculation of this historical mineral reserve estimate: 1.) Mineral reserves reported follow

the NI 43-101 definition of “the economically mineable part of a measured or Indicated Mineral Resource

demonstrated by at least a Preliminary Feasibility Study”, 2.) A mining cut-off grade of 0.616% WO3 was

calculated based on underground operating cost estimates obtained from Wardrop’s October 2007 Internal

Economic Update, 3.) Calculation of the underground mineral reserves was limited in extent to mining the

measured and indicated mineral resources located within the Yukon, 4.) A combination of Long-hole (LH)

Stoping and Mechanized Cut -and-Fill (MCF) mining techniques will be used. LH stoping is the primary

mining method and only regions where the mineralization is less than 12 m thick or dips steeply, will be

mined with MCF, 5.) For the LH stoping method, reserves were calculated using a total recovery facto r of

73.2% and 12% dilution, grading 0.1% WO 3. For the MCF method, reserves were calculated at a total

recovery factor of 83.5% and 9% dilution, grading 0.1% WO 3, 6.) A 3-D block model was designed with

10 m x 10 m x 10 m blocks, using the following parameters: northing, easting and elevation coordinates,

zone identification, resource category, WO3 percentage, and zone percentage (percentage of the block that

lies within the zone), 7.) Probable mineral reserves were calculated by Wardrop using Gemcom Surpac TM

Version 6.02 software.

The reader is cautioned that a qualified person has not done sufficient work to classify the historical

estimates in this news release as current mineral resources or mineral reserves. The Company has not

verified these historical resources and is not treating the historical estimates as current mineral resources

or mineral reserves. While these estimates were prepared in accordance with National Instrument 43-101

and the “Canadian Institute of Mining, Metallurgy and Petroleum Standards on Mineral Resources and

Page 6 of 7

Mineral Reserves Definition Guidelines” in effect at the time, there is no assurance that they are in

accordance with current standards and these resource estimates should not be regarded as consistent with

current standards or unduly relied upon as such. Fireweed includes these historical estimates in this news

release for information purposes as they represent relevant material historical data which have previously

been publicly disclosed and are accessible online. To the Company’s knowledge, the 2007 technical

report is the most recent mineral resource estimate available for the Mactung deposits and the 2009

preliminary economic study is the most recent economic study. Further and updated work is needed to

validate the drill hole database, associated assay results, economics and other pertinent information.

Fireweed plans to prepare updated NI 43-101 compliant mineral resource estimate and preliminary

economic studies and reports for the Mactung deposits in the coming year.

Figure 1. Location Map: Macmillan Pass and Mactung properties.

References

1Scott Wilson Roscoe Postle Associates Inc., 2007. Technical Report on the Mactung Tungsten Deposit,

Macmillan Pass, Yukon. Prepared for North American Tungsten Corporation Limited by P.A. Lacroix

and R.B. Cook.

2Wardrop Engineering Inc., 2009. Amended Technical Report on the Mactung Property – Yukon, Canada.

Prepared for North American Tungsten Corporation Limited.

Page 7 of 7

3Northwest Territories Geological Survey, 2018. NWT Open File 2018-02. Geology of the Mactung

tungsten skarn and area-Review and 2016 field observations. Report by B.J. Fischer, E. Martel, and H.

Falck.

4Elongo, V., Lecumberri-Sanchez, P., Legros, H., Falck, H., Adlakha, E., & Roy-Garand, A., 2020.

Paragenetic constraints on the Cantung, Mactung and Lened tungsten skarn deposits, Canada:

Implications for grade distribution. Ore Geology Reviews, 125, 103677.