Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FVL.TO ·

Freegold Intersects 70.5 metres grading 0.82 g/t Au at Golden Summit Project

Drill Results Marketing Announcement

174253.v1 1

For Immediate Release www.freegoldventures.com

Freegold Intersects 70.5 metres grading 0.82 g/t Au at Golden Summit Project

July 18 th, 2017 (Vancouver, BC) – Freegold Ventures Limite d (TSX: FVL, Frankfurt: FR4N) (“ Freegold) is

pleased to announce assays from last 6 holes of the oxide expansion drill program at Golden Summit.

Golden Summit is located 30 minutes drive via paved highway from Fairbanks, Alaska.

A total of 27 holes were drilled in an area to the north of the current resource area. Using results of the

previously completed RAB (Rotary Air Blast) drilling, ground resistivity and soil geochemistry, a series of

vertical holes, spaced roughly 50 metres apart in an east -west-north-south grid pattern were drilled. (See

attached map). Drilled to an average depth of 70 metres, the hole pattern was designed to determine if

the current oxide resource could be expanded to the north as well as to establish boundaries to the

current oxide resource.

Assays from last 6 holes are reported below: see attached map for locations

Hole

Total

Depth

(m)

From

(m) To (m) Interval

(m) Au g/t Depth of

Oxide (m)

Oxide Grade

Au g/t

GSDL 17-22 70.5 0 70.5 70.5 0.28 51 0.35

GSDL 17-23 70.5 3 70.5 67.5 0.41 43.5 0.17

GSDL 17-24 70.5 0 70.5 70.5 0.13 57 anomalous

GSDL 17-25 70.5 3 70.5 67.5 0.21 55.5 0.22

GSDL 17-26 70.5 0 70.5 70.5 0.82 60 0.36

GSDL 17-27 70.5 3 70.5 67.5 0.16 46.5 0.17

Width refers to drill hole intercepts, true widths cannot be determined due to uncertain geometry of

mineralization.

The results of the 2017 program have demonstrated the potential for expansion of the current oxide

resource at Golden Summit with majority of the holes returning average grades above the internal cut-off

used in the Preliminary Economic Assessment completed in January 2016. This completes the Phase 1

oxide expansion program at Golden Summit. A ground geophysical program (Induced Polarization) was

also completed to the west of the Dolphin Resourc e. Combined with soil geochemistry (Au, Bi and W)

this has outlined an additional expansion target well west of the previously identified expansion area. This

new resistivity anomaly covers a 1,500 metres by 300 meter area.

The Dolphin remains open to the west and the southwest and additional drilling will be necessary to

determine if the re source can be expanded in these areas. Other areas that may have the potential to

enhance the overall grade of the resource is the potential extension of the origi nal high grade Cleary Hill

vein system as indicated by the ground geophysical program.

Additional metallurgical work to refine the treatment method for the sulphide material remains ongoing.

174253.v1 2

Drill cores were logged, photographed and placed in sealed bag s for geochemical analysis. Core

samples were picked up at the logging facility by ALS Chemex and transported to their facility in

Fairbanks, Alaska. ALS Chemex was used to analyze core samples via fire assay analysis for gold plus multi

element ICP-AES and ICP-MS analysis using 4 acid digestion. Quality control entailed insertion of blanks

and standards into the sample stream, at the rate of approximately one QA/QC sample every tenth

assay. Reported standard and blank assay values were within an acceptable margin of error.

The Qualified Person for this release is Alvin Jackson, P.Geo – Vice President Exploration and

Development for the Company who has reviewed and approved the scientific and technical

information contained in this press release.

For further information:

Kristina Walcott-President and CEO

Telephone: 1.604.662.7307

[email protected]

Some statements in this news release contain forward -looking information, including without limitation

statements as to planned expenditures and explora tion programs. These statements address future

events and conditions and, as such, involve known and unknown risks, uncertainties and other factors

which may cause the actual results, performance or achievements to be materially different from any

future results, performance or achievements expressed or implied by the statements. Such factors include

without limitation the completion of planned expenditures, the ability to complete exploration programs

on schedule and the success of exploration programs. The term "Mineral Resource" used above is

defined per NI 43 -101. Though Indicated Resources have been estimated for the Project, this PEA

includes Inferred Mineral Resources that are too speculative for use in defining Reserves. Standalone

economics have n ot been undertaken for the measured and indicated resources and as such no

reserves have been estimated for the Project. Please note that the PEA is preliminary in nature, that it

includes inferred mineral resources that are considered too speculative geol ogically to have economic

considerations applied to them. There is no certainty that the PEA will be realized. Mineral resources that

are not mineral reserves do not have demonstrated economic viability. Without limitation, statements

regarding potential m ineralization and resources, exploration results, and future plans and objectives of

the Company are forward looking statements that involve various risks. Actual results could differ

materially from those projected as a result of the following factors, am ong others: changes in the price of

mineral market conditions, risks inherent in mineral exploration, risks associated with development,

construction and mining operations, the uncertainty of future profitability and uncertainty of access to

additional capital. See Freegold's Annual Information Form for th e year ended December 31st, 2016 filed

under Freegold's profile at www.sedar.com for a detailed discussion of the risk factors associated with

Freegold's operations.

25

0

25

50

75

(meters)

NAD27 / UTM zone 6N

FREEGOLD VENTURES LIMITED

GOLDEN SUMMIT PROJECT

2017 Proposed and

Final Hole Locations

July 2017 Peter E. Walcott & Associates Limited

Holes Reported this Release

Previously Reported 2017 Holes

Holes yet to be Drilled or Reported

Pre 2017 Drilling

7

2

1

5

2

0

0

7

2

1

5

3

0

0

7

2

1

5

4

0

0

7

2

1

5

5

0

0

7

2

1

5

6

0

0

7

2

1

5

7

0

0

7

2

1

5

8

0

0

7

2

1

5

9

0

0

7

2

1

5

2

0

0

7

2

1

5

3

0

0

7

2

1

5

4

0

0

7

2

1

5

5

0

0

7

2

1

5

6

0

0

7

2

1

5

7

0

0

7

2

1

5

8

0

0

7

2

1

5

9

0

0

478800

478900

479000

479100

479200

479300

479400

479500

478800

478900

479000

479100

479200

479300

479400

479500

CHD9701

CHD9702

CHM9603

CHM9604

CHM9605

GSCL1208

GSCL1209

GSCL1210

GSCL1211

GSCL1212

GSCL1213

GSCL1214

GSCL1215

GSCL1216

GSCL1217

GSCL1218

GSCL1219

GSCL1220

GSDC0824

GSDC0825

GSDC0826

GSDC1132

GSDC1134

GSDC1136

GSDC1137

GSDC1138

GSDC1139

GSDC1140

GSDC1141

GSDC1142

GSDC1143

GSDC1145

GSDC1146

GSDC1152

GSDC1153

GSDC1154

GSDC1155

GSDL1201

GSDL1202

GSDL1203

GSDL1204

GSDL1205

GSDL1206

GSDL1207

GSDL1208

GSDL1209

GSDL1210

GSDL1211

GSDL1212

GSDL1213

GSDL1214

GSDL1215

GSDL1216

GSDL1217

GSDL1220

GSDL1224

GSDL1225

GSDL1226

GSDL1301

GSDL1302

GSDL1307

GSDL1308

GSDL1309

GSDL1310

GSDL1311

GSDL1312

GSDL1313

TLD0401

TLD0402

TLD0403

TLD0405

TLD9801

TLR9501

TLR9502

TLR9503

TLR9504

TLR9505

TLR9506

TLR9507

TLR9508

TLR9509

TLR9510

TLR9511

TLR9512

TLR9513

TLR9514

TLR9515

TLR9602

TLR9603

TLR9604

TLR9605

TLR9610

TLR9615

TLR9616

TLR9617