Freegold Intersects 52.5 metres grading 0.56 g/t Au in Oxide Expansion Drilling at Golden Summit Project
174253.v1 1
For Immediate Release www.freegoldventures.com
Freegold Intersects 52.5 metres grading 0.56 g/t Au in Oxide Expansion Drilling
at Golden Summit Project
June 22nd, 2017 (Vancouver, BC) – Freegold Ventures Limited (TSX: FVL, Frankfurt: FR4N) (“Freegold) is
pleased to announce assays from an additional 4 holes from the oxide expansion drill program at Golden
Summit. Golden Summit is located 30 minutes drive via paved highway from Fairbanks, Alaska.
As part of the Phase 1 Oxide Expansion drilling a total of 27 holes were drilled in an area to the north of
the current resource area. Using results of the previously completed RAB (Rotary Air Blast) drilling,
ground resistivity and soil geochemistry, a series of vertical holes, spaced roughly 50 metres apart in an
east -‐west-‐north-‐south grid pattern were drilled. (See attached map). Drilled to an average depth of 70
metres, the hole pattern was designed to determine if the current oxide resource could be expanded to
the north as well as to establish boundaries to the current oxide resource.
Assays from the additional 4 holes are below.
Hole
Total
Depth
(m)
From
(m)
To
(m)
Interval
(m) Au g/t Oxide
Thickness (m)
Oxide Grade
Au g/t
GSDL 17-‐12 70.5 1.5 70.5 69 0.23 54 0.26
GSDL 17-‐13 70.5 1.5 70.5 69 0.46 52.5 0.56
GSDL 17-‐14 70.5 1.5 70.5 69 0.74 51 0.19
GSDL 17-‐15 70.5 3 70.5 67.5 0.38 58.5 0.35
Width refers to drill hole intercepts, true widths cannot be determined due to uncertain geometry of mineralization.
Results continue to demonstrate the potential for expansion of the current oxide resource at Golden
Summit. Additional assay results will be reported as they become available.
Additional metallurgical work to refine the treatment method for the sulphide material remains
ongoing.
Drill cores were logged, photographed and placed in sealed bags for geochemical analysis. Core samples
were picked up at the logging facility by ALS Chemex and transported to their facility in Fairbanks,
Alaska. ALS Chemex was used to analyze core samples via fire assay analysis for gold plus multi element
ICP-‐AES and ICP-‐MS analysis using 4 acid-‐digestion. Quality control entailed insertion of blanks and
standards into the sample stream, at the rate of approximately one QA/QC sample every tenth assay.
Reported standard and blank assay values were within an acceptable margin of error.
174253.v1 2
The Qualified Person for this release is Alvin Jackson, P.Geo – Vice President Exploration and
Development for the Company who has reviewed and approved the scientific and technical information
contained in this press release.
For further information:
Kristina Walcott-‐President and CEO
Telephone: 1.604.662.7307
Some statements in this news release contain forward-‐looking information, including without limitation
statements as to planned expenditures and exploration programs. These statements address future
events and conditions and, as such, involve known and unknown risks, uncertainties and other factors
which may cause the actual results, performance or achievements to be materially different from any
future results, performance or achievements expressed or implied by the statements. Such factors
include without limitation the completion of planned expenditures, the ability to complete exploration
programs on schedule and the success of exploration programs. The term "Mineral Resource" used
above is defined per NI 43-‐101. Though Indicated Resources have been estimated for the Project, this
PEA includes Inferred Mineral Resources that are too speculative for use in defining Reserves.
Standalone economics have not been undertaken for the measured and indicated resources and as such
no reserves have been estimated for the Project. Please note that the PEA is preliminary in nature, that it
includes inferred mineral resources that are considered too speculative geologically to have economic
considerations applied to them. There is no certainty that the PEA will be realized. Mineral resources that
are not mineral reserves do not have demonstrated economic viability. Without limitation, statements
regarding potential mineralization and resources, exploration results, and future plans and objectives of
the Company are forward looking statements that involve various risks. Actual results could differ
materially from those projected as a result of the following factors, among others: changes in the price
of mineral market conditions, risks inherent in mineral exploration, risks associated with development,
construction and mining operations, the uncertainty of future profitability and uncertainty of access to
additional capital. See Freegold's Annual Information Form for the year ended December 31st, 2016 filed
under Freegold's profile at www.sedar.com for a detailed discussion of the risk factors associated with
Freegold's operations.
25 0 25 50 75
(meters)
NAD27 / UTM zone 6N
FREEGOLD VENTURES LIMITED
GOLDEN SUMMIT PROJECT
2017
Hole Locations
June 2017 Peter E. Walcott & Associates Limited
Holes Reported this Release
Previously Reported 2017 Holes
Holes yet to be Reported
Pre 2017 Drilling
7215200 7215300 7215400 7215500 7215600 7215700 7215800 7215900
7215200 7215300 7215400 7215500 7215600 7215700 7215800 7215900
478800 478900 479000 479100 479200 479300 479400 479500
478800 478900 479000 479100 479200 479300 479400 479500
CHD9701
CHD9702
CHM9603
CHM9604
CHM9605
GSCL1208
GSCL1209
GSCL1210
GSCL1211
GSCL1212
GSCL1213
GSCL1214
GSCL1215
GSCL1216
GSCL1217
GSCL1218
GSCL1219
GSCL1220
GSDC0824
GSDC0825 GSDC0826
GSDC1132
GSDC1134
GSDC1136
GSDC1137
GSDC1138
GSDC1139
GSDC1140
GSDC1141
GSDC1142GSDC1143
GSDC1145
GSDC1146
GSDC1152
GSDC1153 GSDC1154
GSDC1155
GSDL1201
GSDL1202
GSDL1203
GSDL1204
GSDL1205
GSDL1206
GSDL1207
GSDL1208
GSDL1209
GSDL1210GSDL1211
GSDL1212
GSDL1213
GSDL1214
GSDL1215
GSDL1216
GSDL1217
GSDL1220
GSDL1224
GSDL1225GSDL1226
GSDL1301
GSDL1302
GSDL1307
GSDL1308
GSDL1309
GSDL1310
GSDL1311
GSDL1312
GSDL1313
TLD0401
TLD0402
TLD0403
TLD0405 TLD9801
TLR9501
TLR9502
TLR9503
TLR9504
TLR9505
TLR9506
TLR9507
TLR9508
TLR9509 TLR9510
TLR9511
TLR9512
TLR9513
TLR9514
TLR9515
TLR9602
TLR9603
TLR9604
TLR9605
TLR9610
TLR9615
TLR9616
TLR9617