Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FVL.TO ·

Freegold Intersects 188 Metres Grading 3.69 G/T GOLD at Golden Summit Including 2 Metres of 169.5 G/T GOLD.

Drill Results Marketing Announcement

1

FOR IMMEDIATE RELEASE

FREEGOLD INTERSECTS 188 METRES GRADING

3.69 G/T GOLD AT GOLDEN SUMMIT INCLUDING

2 METRES OF 169.5 G/T GOLD.

VANCOUVER: May 6th, 2020 - Freegold Ventures Limited (Freegold) (FVL: TSX) is pleased to announce

assay results from its temporarily suspended drill program on its Golden Summit Project near Fairbanks,

Alaska.

Drill results returned multiple intercepts of high er-grade mineralization within the projected extension of

the Cleary Vein system (CVS ). Hole GSDL20 01 was drilled to a depth of 54 8 metres and intersected 188

metres grading 3.69 grams per tonne (g/t). Significantly, the last 20 metres graded 9. 87 g/t Au, indicating

the system is open to depth. GSD L2002, drilled 150 metres to the east of GSDL 2001 , was drilled to a depth

of 165 metres and had just intersected the projected CVS returning 2.4 g/t over 9 m before drilling activities

were suspended due to COVID 19. Drilling on this hole will be resumed when the program restarts .

Kristina Walcott, President of Freegold states, “Management is tremendously excited with these results. The drill

program is testing our interpretation that the high-grade CVS extends to the west and these results are confirming

our interpretation.”

These intercepts correspond with Freegold’s revised interpretation that the strike of the Cleary Hill vein

system may extend west of the old Cleary Hill Mine working towards the Dolphin i ntrusive in an area of

limited previous drilling. As the district’s highest grade historical underground mine Cleary Hill produced

281,000 ounces at an average grade of 1.3 oz /t before production ceased in 1942. The historic Cleary Hill

mine workings are projected to lie approximately 500 -600 metres to the northeast of the current drilling.

Significant results are reported below:

Hole Number Dip Azimuth Depth

(m)

From

(m)

To

(m)

Int.

(m)

Au

g/t

GSDL2001 -80° 360° 548 290.6 548 257.4 2.94

including 365.2 367.2 2.0 169.5

including 360 548 188.0 3.69

including 528 548 20.0 9.87

GSDL2002 -70° 360° 165 156 165 9 2.4

Width refers to drill hole intercepts, true widths cannot be determined due to uncertain geometry of mineralization.

2

Drilling activities were suspended out of concern for the well-being of our employees, contractors, their families,

and our communities. The Company is continuing to follow r ecommended guidelines to assist in minimizing the

spread of C OVID-19 including its adopted working from home policy for its corporate office and temporary

cessation of its field activities. The Company is continuing to evaluate opportunities in order to safely resume its

field activities.

Golden Summit was the subject of an intensive drill campaign between January 2011 and August 2013. A

total of 36,159 metres were drilled and three NI 43 -101 compliant resource updates were completed. In

January 2016, a preliminary economic assessment (PEA) was produced by TetraTech (Press release – January

26th, 2016).

Drill cores were cut in half using a diamond saw, with one -half placed in sealed bags for preparation and

subsequent geochemical analysi s by ALS Chemex . All assays were performed by ALS Global Ltd., with sample

preparation carried out at the ALS facility in Fairbanks, Alaska with subsequent analyses performed primarily using

its Vancouver and Reno laboratories. A sample quality control/quality assurance program was implemented.

The Qualified Person for this release is Alvin Jackson, PGeo – Vice President Exploration and Development for

Freegold.

About Freegold Ventures Limited

Freegold is a TSX listed company focused on exploration in Alaska and holds through leases the Golden

Summit Gold Project, near Fairbanks as well the Shorty Creek Copper –Gold Project near Livengood.

For further information:

Kristina Walcott

President and CEO

Telephone: 1.604.662.7307

[email protected]

Some statements in this news release contain forward-looking information, including without limitation statements as to planned expenditures

and exploration programs. These statements address future events and conditions and, as such, involve known and unknown risks,

uncertainties and other factors which may cause the actual results, performance or achievements to be materially different fr om any future

results, performance or achieve ments expressed or implied by the statements. Such factors include without limitation the completion of

planned expenditures, the ability to complete exploration programs on schedule and the success of exploration programs. The term “Mineral

Resource” used above is defined per NI 43 -101. Though Indicated Resources have been estimated for the Project, this PEA includes Inferred

Mineral Resources that are too speculative for use in defining Reserves. Standalone economics have not been undertaken for the measu red

and indicated resources and as such no reserves have been estimated for the Project. Please note that the PEA is preliminary in nature, that it

includes inferred mineral resources that are considered too speculative geologically to have economic considerations applied to them that

would allow them to be categorized as mineral reserves. There is no certainty that the PEA will be realized. Mineral resource s that are not

mineral reserves do not have demonstrated economic viability. Without limitation, statements regarding potential mineralization and

resources, exploration results, and future plans and objectives of the Company are forward looking statements that involve various risks. Actual

results could differ materially from those projected as a result of the following factors, among others: changes in the price of mineral market

conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of

future profitability and uncertainty of access to additional capital. See Freegold’s Annual Information Form for the year ended December 31st,

2019 filed under Freegold’s profile at www.sedar.com for a detailed discussion of the risk factors associated with Freegold’s operations.