Freegold Achieves Over 93% Recovery Using Albion Process™ oxidation-CIL Additional Metallurgical Work Remains Ongoing FREEGOLD FVL:TSX

Metallurgy & Processing

Freegold Achieves Over 93% Recovery Using Albion Process™ oxidation-CIL

Additional Metallurgical Work Remains Ongoing

FREEGOLD

FVL:TSX OTCQX: FGOVF

• Total g old recovery of over 93% from a composite comprised of core from 8 drill holes representing the

Dolphin/Cleary resource area.

• The flowsheet consists of gravity – flotation - concentrate cleaning - Albion Process™ oxidation - CIL (carbon-in-

leach).

• A sulfide concentrate representing approximately 3% of the process plant feed has been treated using standard

Albion™ Process testing procedures appropriate for the current stage of the Golden Summit Project

development, resulting in a downstream CIL stage extraction of over 97%.

• The exceptional CIL stage extraction of gold has been achieved with less than 75% sulfur oxidation.

• Further optimization of this flowsheet and testing of other oxidation processes are ongoing.

Vancouver, BC – February 20th, 2025 —Freegold Ventures Limited (TSX: FVL, OCTQX: FGOVF) (“Freegold” or the

"Company") is pleased to announce additional results based on the ongoing metallurgical test work on drill hole

composites from the 2020 – 2022 drill programs. The objectives of the recently completed testwork were:

• Advancement of understanding of gold deportment and recovery methods from previously released metallurgical

test work results

• Optimization of gold recovery and flowsheet make -up considering the minimization of both future capital and

operating cost intensity with the benefit of significant additional and overall gold recovery

Eight drill core composites, representing different locations and grades within the Dolphin and Cleary areas, were

created using continuous drill intervals chosen to reflect potential mill feed. (Refer to the map below for hole

locations.) The selections o f drill holes and intervals included the three primary gold-hosting lithologies. The results

indicate that a gold recovery rate of 9 3% can be achieved using standard and commercially employed mineral

processing operations. The composites were prepared from laboratory assay rejects of fresh rock intervals located

well below the existing oxide cap at Golden Summit. Eight drill hole composites were utilized, comprising 1,192 meters

of drill intercepts that represent 587 continuous mineralized intervals with a total material weight of over 5,100

kilograms.

Summary of Gold Recovery

Composite DDH Make Up GS2201 GS2203 GS2206 GS2207

GS2208 GS2209 GS2168 GS2167

Test Calc Grade gold recovery %

Au g/t Gravity Flotation

Post Oxidation Stage

CIL Total

1.15 40% 55% 97% >93%

Freegold Achieves Over 93% Recovery Using Albion Process™ oxidation-CIL

Additional Metallurgical Work Remains Ongoing

2

FREEGOLD

FVL:TSX OTCQX: FGOVF

Since 2020, drilling activities at the Golden Summit project have significantly bolstered its potential, reinforcing the

project's viability through positive metallurgical outcomes and a marked increase in overall resources. The current pit -

constrained resource includes both oxide and primary resources, with the oxide component located within the upper 70

meters. Previous column tests on the oxide material indicate that heap leach gold recoveries can reach 85% within two

weeks. Ongoing optimization efforts are focused on delineating the most effective flow sheet for the sulphide component

before initiating a pre-feasibility study.

The strategic plan for 2025 outlines extensive drilling initiatives aimed at upgrading resources from the inferred category

to the indicated category, which is crucial for completing the planned pre-feasibility study. The September 2024 Primary

Resource, using a 0.5 g/t cut -off, is 346,304,000 tonnes at 1.08 g/t Au (12,050,000 contained ounces) in the indicated

mineral resource category and 308,311,000 tonnes at 1.04 g/t Au (10,306,000 contained ounces) in the inferred mineral

resource category.

In 2024, 41 holes , totaling 25,708m, were drilled. Assay results from twelve drill holes related to the 2024 program are

pending. Results from the 2024 program w ill be incorporated into an updated mineral resource estimate expected to be

released later in 2025.

Ongoing Metallurgical Work: The primary areas of focus in the next phase of metallurgical test work are in progress and

include:

• Comminution studies using half PQ core

• Flotation concentrate oxidation pre-treatment utilizing BIOX® and POX prior to CIL

Freegold Achieves Over 93% Recovery Using Albion Process™ oxidation-CIL

Additional Metallurgical Work Remains Ongoing

3

FREEGOLD

FVL:TSX OTCQX: FGOVF

Link to Map Showing Location of Metallurgical Composite Holes and 2024

Drilling

https://freegoldventures.com/site/assets/files/6287/metdrillingplanmap_february2025.pdf

The Qualified Person for this release is Alvin Jackson, P.Geo., Vice President of Exploration and Development for

Freegold, who has approved the scientific and technical disclosure in this news release.

About Freegold Ventures Limited

Freegold is a TSX-listed company focused on exploration in Alaska. It holds the Golden Summit Gold Project near

Fairbanks and the Shorty Creek Copper-Gold Project near Livengood through leases.

For further information:

Kristina Walcott

President and CEO

Telephone: 1.604.662.7307

[email protected]

Some statements in this news release contain forward-looking information, including, without limitation, statements as to planned expenditures and exploration

programs, potential mineralization and resources, exploration results, the completion of an updated NI 43 -101 technical report, and any other future plans.

These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties, and other factors which may cause the

actual results, performance, or achievements to be materially different from any future results, performance, or achievements expressed or implied by the

statements. Such factors include, without limitation, the completion of planned expenditures, the ability to complete explora tion programs on schedule, and

the success of exploration programs. See Freegold’s Annual Information Form for the year ended December 31st, 202 3, filed under Freegold’s profile at

www.sedar.com, for a detailed discussion of the risk factors associated with Freegold’s operations. On January 30, 2020, the World Health Organization declared

the COVID-19 outbreak a global health emergency. Reactions t o the spread of COVID -19 continue to lead to, among other things, significant restrictions on

travel, business closures, quarantines, and a general reduction in economic activity. While these effects have been reduced in recent months, the continuation

and re-introduction of significant restrictions, business disruptions, and related financial impact, and the duration of any such disruptions cannot be reasonably

estimated. The risks to Freegold of such public health crises also include employee health and safety risks and a slowdown or temporary suspension of operations

in geographic locations impacted by an outbreak. Such public health crises, as well as global geopolitical crises, can result in volatility and disruptions in the

supply and demand for various products a nd services, global supply chains, and financial markets, as well as declining trade and market sentiment and

reduced mobility of people, all of which could affect interest rates, credit ratings, credit risk, and inflation. As a result of the COVID-19 outbreak, Freegold has

implemented a COVID management program and established a full-service Camp at Golden Summit to attempt to mitigate risks to its employees, contractors,

and community. While the extent to which COVID- 19 may impact Freegold is uncertain, it is possible that COVID -19 may have a material adverse effect o n

Freegold’s business, results of operations, and financial condition.