Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FVI.TO ·

Fortuna reports 2016 production of 10.2 million silver equivalent ounces and issues guidance for 2017

Resource Estimates

Fortuna reports 2016 production of 10.2 million silver equivalent ounces and

issues guidance for 2017

Vancouver, January 11, 2017-- Fortuna Silver Mines, Inc. (NYSE: FSM ) (TSX: FVI) is pleased to

announce 2016 production figures from its two underground operating silver mines, the San Jose Mine in

Mexico and the Caylloma Mine in Peru. The company produced 7.4 million ounces of silver and 46.6

thousand ounces of gold or 10.2 million Ag Eq* ounces.

Jorge A. Ganoza, President and CEO, commented: “ We leave behind a year of important achievements

with the successful expansion of our San Jose Mine to 3,000 tpd and the acquisition of the Lindero gold

Project in Salta, Argentina. Lindero adds 1.5 million ounces of gold reserves to our existi ng inventory

and positions Fortuna for its next leg of growth.” Mr. Ganoza continued, “In 2017, our expansion plans

are going to be underpinned by our solid low -cost production base providing financial flexibility to

execute engineering and development pla ns for Lindero and continue exploring for new compelling

precious metal opportunities in the Americas and abroad.”

2016 Consolidated Production Highlights

 Silver and gold production were 5 % and 9 % respectively above 2016 guidance

 Silver production of 7,380,217 ounces; 11 % increase over 2015

 Gold production of 46,551 ounces; 17 % increase over 2015

 Zinc production of 43,204,154 pounds; 21 % increase over 2015

 Lead production of 32,673,479 pounds; 37 % increase over 2015

(*) Silver equivalent is calculated using a silver to gold ratio of 60 to 1

2016 Consolidated Operating Results

Q4 2016 2016

Caylloma,

Peru

San Jose,

Mexico Consolidated Caylloma,

Peru

San Jose,

Mexico Consolidated

Processed Ore

Tonnes milled 135,121 273,036 514,828 905,467

Average tpd milled 1,501 3,103 1,438 2,596

Silver

Grade (g/t) 82 225 90 228

Recovery (%) 82.43 92.48 84.39 92.36

Production (oz) 291,988 1,828,110 2,120,098 1,255,981 6,124,235 7,380,217

2

Q4 2016 2016

Caylloma,

Peru

San Jose,

Mexico Consolidated Caylloma,

Peru

San Jose,

Mexico Consolidated

Gold

Grade (g/t) 0.21 1.69 0.20 1.72

Recovery (%) 17.03 92.24 16.41 92.07

Production (oz) 152 13,660 13,812 533 46,018 46,551

Lead

Grade (%) 2.60 3.06

Recovery (%) 94.17 94.10

Production (lbs) 7,290,060 7,290,060 32,673,479 32,673,479

Zinc

Grade (%) 4.06 4.25

Recovery (%) 91.05 89.50

Production (lbs) 11,006,018 11,006,018 43,204,154 43,204,154

Note: Metallurgical recovery for silver at the Caylloma Mine is calculated based on silver content in lead concentrate

San Jose Mine, Mexico

Silver and gold production for 2016 were 6,124,235 ounces and 46,018 ounces , or 4 percent and 10

percent above annual guidance, respectively. Annual average head grades for silver and gold were 228

g/t and 1.72 g/t, respectively.

Caylloma Mine, Peru

Silver production for 2016 w as 1,255,981 ounces or 7 percent above annual guidance. Annual average

head grades for silver, lead and zinc were 90 g/t, 3.06 % and 4.25 %, respectively.

2017 Consolidated Production and Cash Cost Guidance

Silver

(Moz)

Gold

(koz)

Lead

(Mlbs)

Zinc

(Mlbs)

Cash Cost

($/t)

AISC

($/oz Ag)

San Jose Mine, Mexico 7.1 51.9 NA NA 56.7 8.4

Caylloma Mine, Peru 1.0 0.5 30.0 41.0 75.5 10.8

Total 8.1 52.4 30.0 41.0

■ 2017 silver equivalent production guidance of 11.2 million ounces

■ 2017 consolidated AISC of $9.8/oz Ag, refer to the appendix for details

Notes:

1. Silver equivalent production does not include lead or zinc and is calculated using a silver to gold ratio of 60 to 1

2. All-in sustaining cash cost (AISC) per ounce of silver is net of by-products gold, lead and zinc

3. Total figures may not add due to rounding

3

2017 Outlook

San Jose Mine, Mexico

San Jose plans to process 1,050,000 tonnes of ore averaging 230 g/t Ag and 1.67 g/t Au. Capital

investment is estimated at $23.2 million.

Major capital investments include:

 Mine development: $6.5 million

 Equipment and infrastructure: $2.2 million

 Tailings filtration plant expansion: $6.5 million

 Brownfields exploration: $7.0 million

Caylloma Mine, Peru

Caylloma plans to process 535,000 tonnes of ore averaging 71 g/t Ag, 2.73% Pb and 3.86% Zn . Capital

investment is estimated at $14.1 million.

Major capital investments include:

 Mine development: $6.9 million

 Equipment and infrastructure: $3.3 million

 Brownfields exploration: $3.9 million

Lindero gold Project, Argentina

The company continues advancing with the optimization of the 2016 Feasibility Study; including tradeoff

metallurgical tests and detailed engineering revisions. Initial results for the various components of the

optimization are expected to be released in March 2017.

Brownfields Exploration Highlights

San Jose Mine, Mexico

Brownfields exploration program budget for 2017 at the San J ose Mine is $7.0 million, which includes

31,000 meters of diamond drilling and 600 meters of underground development for drilling to define

future resources. Exploration drilling is in progress at the Trinidad Central zone and on the sub- parallel

Ocotlan vein in the San Jose Mine.

Caylloma Mine, Peru

Brownfields exploration program budget for 2017 at the Caylloma Mine is $ 3.9 million, which includes

22,000 meters of diamond drilling. Drilling will focus on testing extensions of the principal Animas vein

both northeast and southwest from current underground operations. Exploration drilling is in progress on

extensions of ore-shoots immediately beneath current operations.

4

Lindero gold Project, Argentina

The Arizaro gold-copper porphyry target lies within the Lindero Proje ct concession block and contains a

Mineral Resource as detailed in the 2016 Feasibility Study. We plan to investigate the economic potential

of including the Arizaro target into the existing Lindero resource through s urface mapping, re-logging of

approximately 8,000 meters of core and initial metallurgical tests with a budget of $450,000.

Greenfields Exploration Highlights

Serbia

Through two C$1.5 million equity investments in Medgold Resources Corp. (see Medgold’s news release

dated January 9, 2017 ), Fortuna is funding a Strategi c Alliance with Medgold and has the option to

nominate two Selected Properties over the course of 2017 to form joint ventures with Medgold.

Exploration will center on high and low -sulfidation epithermal gold -silver mineralization in the western

portion of the Tethyan orogenic system. Each joint venture, if formed, will allow Fortuna the right to

earn a 51 percent interest by spending $3.0 million over three years, with a first-year commitment of $1.0

million, and gain an additional 19 percent interest by spending a further $5.0 million and completing a

Preliminary Economic Assessment.

Qualified Person

Edwin A. Gutierrez, Technical Services Corporate Manager, is the Qualified Person for Fortuna Silver

Mines Inc. as defined by National Instr ument 43- 101. Mr. Gutierrez is a Registered Member of the

Society for Mining, Metallurgy and Exploration, Inc. (SME Registered Member Number 4119110RM)

and is responsible for ensuring that the information contained in this news release is an accurate summary

of the original reports and data provided to or developed by Fortuna Silver Mines.

About Fortuna Silver Mines Inc.

Fortuna is a growth oriented, precious and base metals producer focused on mining opportunities in Latin

America. Our primary assets are the Caylloma silver Mine in southern Peru, the San Jose silver -gold

Mine in Mexico and the Lindero gold Project in Arge ntina. The company is selectively pursuing

acquisition opportunities throughout the Americas and in select other areas. For more information, please

visit our website at www.fortunasilver.com.

ON BEHALF OF THE BOARD

Jorge A. Ganoza

President, CEO and Director

Fortuna Silver Mines Inc.

Trading symbols: NYSE: FSM | TSX: FVI

Investor Relations:

Carlos Baca- T (Peru): +51.1.616.6060, ext. 0

5

Forward looking Statements

This news release contains forward looking statements which constitute "forward looking information" within the

meaning of applicable Canadian securities legislation and "forward looking statements" within the meaning of the

"safe harbor" provisions of the Private Securities Litigation Reform Act of 1995 (collectively, "Forward looki ng

Statements"). All statements included herein, other than statements of historical fact, are Forward looking

Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual

events or results to differ materia lly from those reflected in the Forward looking Statements. The Forward looking

Statements in this news release include, without limitation, statements about the Company's plans for its mines and

mineral properties; the Company's business strategy, plans and outlook; the merit of the Company's mines and

mineral properties; the future financial or operating performance of the Company; and proposed expenditures.

Often, but not always, these Forward looking Statements can be identified by the use of words such as "estimated",

"potential", "open", "future", "assumed", "projected", "used", "detailed", "has been", "gain", "planned",

"reflecting", "will", "containing", "remaining", "to be", or statements that events, "could" or "should" occur or be

achieved and similar expressions, including negative variations.

Forward looking Statements involve known and unknown risks, uncertainties and other factors which may cause the

actual results, performance or achievements of the Company to be materially different from any results,

performance or achievements expressed or implied by the Forward looking Statements. Such uncertainties and

factors include, among others, changes in the Company ’s plans for its mines and mineral properties; changes in

general economic conditions and financial markets; changes in prices for silver and other metals; technological and

operational hazards in Fortuna's mining and mine development activities; risks inherent in mineral exploration;

uncertainties inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; governmental

and other approvals; political unrest or instability in countries where Fortuna is active; labor relations issues; as

well as those factors discussed under "Risk Factors" in the Company's Annual Information Form. Although the

Company has attempted to identify impor tant factors that could cause actual actions, events or results to differ

materially from those described in Forward looking Statements, there may be other factors that cause actions,

events or results to differ from those anticipated, estimated or intended.

Forward looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of

management, including but not limited to expectations regarding the Company ’s plans for its mines and mineral

properties; mine production costs; expected trends in mineral prices and currency exchange rates; the accuracy of

the Company's current mineral resource and reserve estimates; that the Company's activities will be in accordance

with the Company's public statements and stated goals; that there will be no material adverse change affecting the

Company or its properties; that all required approvals will be obtained; that there will be no significant disruptions

affecting operations and such other assumptions as set out herein. Forward looki ng Statements are made as of the

date hereof and the Company disclaims any obligation to update any Forward looking Statements, whether as a

result of new information, future events or results or otherwise, except as required by law. There can be no

assurance that Forward looking Statements will prove to be accurate, as actual results and future events could

differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance

on Forward looking Statements.

This news release also refers to non -GAAP financial measures, such as cash cost per tonne of processed ore; cash

cost per payable ounce of silver; total production cost per tonne; all -in sustaining cash cost; all -in cash cost;

adjusted net (loss) income; o perating cash flow per share before changes in working capital, income taxes, and

interest income; and adjusted EBITDA. These measures do not have a standardized meaning or method of

calculation, even though the descriptions of such measures may be similar . These performance measures have no

meaning under International Financial Reporting Standards (IFRS) and therefore, amounts presented may not be

comparable to similar data presented by other mining companies.

6

Appendix

2017 AISC Guidance Breakdown

San Jose Mine AISC:

Item ($/oz Ag)

Cash cost net of by-product credits 2.4

Commercial and government royalties/

mining tax 1.2

Workers’ participation 0.8

Subsidiary G&A 0.7

Sustaining capex 2.3

Brownfields exploration 1.0

AISC 8.4

Caylloma Mine AISC:

Item ($/oz Ag)

Cash cost net of by-product credits - 8.9

Commercial and government royalties/

mining tax 0.9

Workers’ participation 0.2

Subsidiary G&A 3.4

Sustaining capex 11.0

Brownfields exploration 4.2

AISC 10.8

Consolidated AISC:

Item ($/oz Ag)

Cash cost net of by-product credits 1.1

Commercial and government royalties/

mining tax 1.1

Workers’ participation 0.7

Subsidiary G&A 1.0

Corporate G&A 1.1

Sustaining capex 3.4

Brownfields exploration 1.4

AISC 9.8

Note: Total figures may not add up due to rounding