Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FVI.TO ·

Fortuna drills 20.2 g/t gold over 18.2 meters at the Séguéla gold Project, Côte d’Ivoire

Drill Results

Fortuna drills 20.2 g/t gold over 18.2 meters at the Séguéla gold

Project, Côte d’Ivoire

Vancouver, January 26, 2022-- Fortuna Silver Mines Inc. (NYSE: FSM) (TSX: FVI) is pleased to provide an

update of its Sunbird exploration program at the Séguéla gold Project located in C ôte d’Ivoire . In

September of 2021, the Company made a construction decision to proceed to build a 3,750 tonnes per

day open pit mine at the Séguéla gold Project, with first gold pour expected in mid-2023 (refer to Fortuna

news release dated September 29, 2021).

Paul Weedon, Senior Vice President of Exploration, commented, "Exploration results at Séguéla continue

to support the high-grade trend we have seen from the recent drilling at the Sunbird Prospect, and with

all results now to hand, the Company is looking forward to seeing a maiden inferred resource estimate

for Sunbird.” Mr. Weedon continued, “Mineralization at Sunbird remains open along strike and at depth,

where coarse visible gold seen in diamond drill core is supported by high gold assay grades, with the high-

grade core extending more than 250 meters in strike length.” Mr. Weedon concluded, “Significant upside

remains at depth and additional drilling has commenced to test this potential.”

Séguéla gold Project, Côte d’Ivoire

Sunbird Prospect assay highlights include:

• SGRD1374: 20.2 g/t gold over an estimated true width of 18.2 meters from 142 meters

• SGRD1373: 13.4 g/t gold over an estimated true width of 18.9 meters from 169 meters

• SGRD1375: 7.7 g/t gold over an estimated true width of 14 meters from 225 meters

• SGRD1377: 10.9 g/t gold over an estimated true width of 8.4 meters from 187 meters

Exploration drilling at the Séguéla gold Project continues to advance the Sunbird Prospect with a recently

completed 7-hole, 1,887-meter program testing the continuity of mineralization at depth and along strike

to the south. Drilling was primarily focused on providing better resolution of the extent of the central

high-grade core identified in earlier drilling (refer to Fortuna news releases dated December 9, 2021 and

September 7, 2021) ahead of the anticipated preparation of a maiden mineral inferred resource estimate,

with assays highlighting the continuity of the mineralization. The high-grade mineralization remains open

at depth and down-plunge, with exploration step-out drilling underway to test a further 100 to 150 meters

down dip.

With the receipt of these results, work has commenced on the preparation of a maiden mineral inferred

resource for the Sunbird Prospect which is expected to be completed in the first quarter of 2022. Full

results received for this recent 7-hole program are listed in Appendix 1.

An 8-hole program to test the depth potential has commenced with 2 holes completed to date. Geological

logging of the drill core from SGRD1403 recorded at least 4 visible gold specks of up to 2 -millimeter

diameter, with the characteristics of the mineralization consistent with previous drilling at Sunbird (refer

to Figure 1).

NYSE: FSM | TSX: FVI

www.fortunasilver.com NEWS RELEASE

- 2 -

Figure 1: Sunbird Prospect long-section looking west showing recent drilling results

Quality Assurance & Quality Control (QA-QC)

All drilling data completed by the Company utilized the following procedures and methodologies. All

drilling was carried out under the supervision of the Company’s personnel.

All RC drilling at Séguéla used a 5.25 -inch face sampling pneumatic hammer with s amples collected into

60-liter plastic bags. Samples were kept dry by maintaining enough air pressure to exclude groundwater

inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to

diamond core tails. Once col lected, RC samples were riffle split through a three -tier splitter to yield a

12.5% representative sample for submission to the analytical laboratory. The residual 87.5% sample were

stored at the drill site until assay results were received and validated. Coarse reject samples for all

mineralized samples corresponding to significant intervals are retained and stored on -site at the

company-controlled core yard.

All DD drill holes at Séguéla were drilled with HQ sized diamond drill bits. The core was logged, marked up

for sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into

equal halves using a diamond saw. One half of the core was left in the original core box and stored in a

secure location at the company core yard at the project site. The other half was sampled, catalogued and

placed into sealed bags and securely stored at the site until shipment.

All Séguéla RC and DD core samples were shipped to ALS Laboratories preparation laboratory in

Yamoussoukro for preparation and then, via commercial courier, to ALS’s facility in Ouagadougou, Burkina

Faso for finishing. Routine gold analysis using a 50-gram charge and fire assay with an atomic absorption

finish was completed for all Séguéla samples. Quality control procedures included the systematic insertion

of blanks, duplicates and sample standards into the sample stream. In addition, the ALS laboratory

inserted its own quality control samples.

- 3 -

Qualified Person

Paul Weedon, Senior Vice President of Exploration for Fortuna Silver Mines Inc., is a Qualified Person as

defined by National Instrument 43 -101 being a member of the Australian Institute of Geoscien tists

(Membership #6001). Mr. Weedon has reviewed and approved the scientific and technical info rmation

contained in this news release. Mr. Weedon has verified the data disclosed, and the sampling, analytical

and test data underlying the information or opinions contained herein by reviewing geochemical and

geological databases and reviewing diamond d rill core. There were no limitations to the verification

process.

About Fortuna Silver Mines Inc.

Fortuna Silver Mines Inc. is a Canadian precious metals mining company with four operating mines in

Argentina, Burkina Faso, Mexico and Peru, and a fifth m ine under construction in Côte d'Ivoire.

Sustainability is integral to all our operations and relationships. We produce gold and silver and generate

shared value over the long -term for our stakeholders through efficient production, environmental

protection, and social responsibility. For more information, please visit our website.

ON BEHALF OF THE BOARD

Jorge A. Ganoza

President, CEO and Director

Fortuna Silver Mines Inc.

Investor Relations: Carlos Baca | [email protected]

Forward looking Statements

This news release contains forward looking statements which constitute “forward looking information” within the

meaning of applicable Canadian securities legislation and “forward looking statements” within the meaning of the

“safe harbor” provisions of the Private Securities Litigation Reform Act of 1995 (collectively, “Forward looking

Statements”). All statements included herein, other than stat ements of historical fact, are Forward looking

Statements and are subject to a variety of known and unknown risks and uncertainties which could cause actual

events or results to differ materially from those reflected in the Forward looking Statements. The Forward looking

Statements in this news release may include, without limitation, statements about the Company’s plans for the

Séguéla gold Project and the Sunbird Prospect; the anticipated exploration and development programs at the Sunbird

Prospect and th e Séguéla gold Project, the anticipated results of the exploration program at the Sunbird Prospect,

and the proposed preparation of and timing for a maiden inferred mineral resource for the Sunbird Prospect, and the

intention to expand mineralization at the Séguéla gold Project; the Company’s business strategy, plans and outlook;

the merit of the Company’s mineral properties; mineral resource and reserve estimates; timelines; the future financial

or operating performance of the Company; expenditures; approv als and other matters. Often, but not always, these

Forward looking Statements can be identified by the use of words such as “estimated”, “potential”, “open”, “future”,

“assumed”, “projected”, “used”, “detailed”, “has been”, “gain”, “planned”, “reflecting” , “will”, “containing”,

“remaining”, “to be”, or statements that events, “could” or “should” occur or be achieved and similar expressions,

including negative variations.

- 4 -

Forward looking Statements involve known and unknown risks, uncertainties and other factors which may cause the

actual results, performance or achievements of the Company to be materially different from any results, performance

or achievements expressed or implied by the Forward looking Statements. Such uncertainties and factors include,

among others, changes in general economic conditions and financial markets; the duration and effects of the COVID-

19 pandemic on our operations and workforce and the effects on the global economy and society; changes in prices

for silver, gold and other metals; the success of the Company’s exploration program at the Sunbird Prospect and the

Séguéla gold Project; it is uncertain if the exploration at the Sunbird Prospect will result in a mineral resource being

delineated; there can be no assurance that a m ineral resource exists at the Sunbird Prospect; technological and

operational hazards in Fortuna’s mining and mine development activities; risks inherent in mineral exploration;

fluctuations in prices for energy, labor, materials, supplies and services; fl uctuations in currencies; uncertainties

inherent in the estimation of mineral reserves, mineral resources, and metal recoveries; our ability to obtain all

necessary permits, licences and regulatory approvals in a timely manner; governmental and other approvals; political

unrest or instability in countries where Fortuna is active; labor relations issues; as well as those factors discussed

under “Risk Factors” in the Company's Annual Information Form. Although the Company has attempted to identify

important f actors that could cause actual actions, events or results to differ materially from those described in

Forward looking Statements, there may be other factors that cause actions, events or results to differ from those

anticipated, estimated or intended.

Forward looking Statements contained herein are based on the assumptions, beliefs, expectations and opinions of

management, including but not limited to expectations regarding the results from the exploration programs

conducted at the Sunbird Prospect; expec ted trends in mineral prices and currency exchange rates; the accuracy of

the Company’s information derived from its exploration programs at the Sunbird Prospect current mineral resource

and reserve estimates; that the Company’s activities will be in accordance with the Company’s public statements and

stated goals; that there will be no material adverse change affecting the Company or its properties; that all required

approvals will be obtained; that there will be no significant disruptions affecting operat ions and such other

assumptions as set out herein. Forward looking Statements are made as of the date hereof and the Company

disclaims any obligation to update any Forward looking Statements, whether as a result of new information, future

events or results or otherwise, except as required by law. There can be no assurance that Forward looking Statements

will prove to be accurate, as actual results and future events could differ materially from those anticipated in such

statements. Accordingly, investors should not place undue reliance on Forward looking Statements.

Cautionary Note to United States Investors Concerning Estimates of Reserves and Resources

Reserve and resource estimates included in this news release have been prepared in accordance with National

Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43 -101") and the Canadian Institute of Mining,

Metallurgy, and Petroleum Definition Standards on Mineral Resources and Mineral Reserves. NI 43 -101 is a rule

developed by the Canad ian Securities Administrators that establishes standards for public disclosure by a Canadian

company of scientific and technical information concerning mineral projects. Unless otherwise indicated, all mineral

reserve and mineral resource estimates contained in the technical disclosure have been prepared in accordance with

NI 43-101 and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards on Mineral Resources

and Reserves.

Canadian standards, including NI 43 -101, differ significa ntly from the requirements of the Securities and Exchange

Commission, and mineral reserve and resource information included in this news release may not be comparable to

similar information disclosed by U.S. companies.

- 5 -

APPENDIX 1. Séguéla gold Project, Côte d’Ivoire: Sunbird Prospect drill results

HoleID Easting

(WGS84_29N)

Northing

(WGS84_29N)

Elevation

(m)

EOH1

Depth

(m)

UTM

Azimuth Dip

Depth

From

(m)

Depth

To

(m)

Downhole

Width

(m)

Estimated

True Width

(m)

Au

(ppm)

Hole

Type2

SGRD1371 742895 893136 526 237.5 270 -60 183 185 2 1.4 3.7 RCD

SGRD1372 742914 893190 528 273.5 270 -60 80 86 6 4.2 2.1 RCD

222 227 5 3.5 RCD

239 243 4 2.8 5.6 RCD

including 242 243 1 0.7 12.2 RCD

SGRD1373 742899 893236 521 204.5 270 -60 169 196 27 18.9 13.4 RCD

including 169 170 1 0.7 17.4 RCD

and 171 174 3 2.1 22.2 RCD

and 176 180 4 2.8 29.6 RCD

and 192 193 1 0.7 37.3 RCD

and 194 195 1 0.7 68.9 RCD

SGRD1374 742908 893289 515 231.5 270 -60 142 168 26 18.2 20.2 RCD

including 142 144 2 1.4 25.7 RCD

and 145 148 3 2.1 84.9 RCD

including 147 148 1 0.7 198.5 RCD

and 163 166 3 2.1 55.5 RCD

173 178 5 3.5 4.0 RCD

182 188 6 4.2 11.2 RCD

including 187 188 1 0.7 49.1 RCD

SGRD1375 742928 893289 515 252.4 270 -60 194 196 2 1.4 13.3 RCD

including 194 195 1 0.7 25.4 RCD

225 245 20 14 7.7 RCD

including 225 227 2 1.4 12.6 RCD

and 236 237 1 0.7 21.5 RCD

and 240 241 1 0.7 11.7 RCD

and 243 245 2 1.4 37.1 RCD

SGRD1377 742754 893344 479 303.5 90 -60 187 199 12 8.4 10.9 RCD

including 187 188 1 1 17.8 RCD

and 189 192 3 2.1 21.8 RCD

and 197 199 2 1.4 15.1 RCD

SGRD1378 742584 892665 563 384.5 90 -60 301 312 11 7.7 1.4 RCD

360 372 12 8.4 4.8 RCD

including 368 369 1 0.7 23.9 RCD

and 371 372 1 0.7 11.9 RCD

Notes:

1. EOH: End of hole

2. RCD: Reverse Circulation pre-collar, diamond core tail