Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FUU.V ·

Fission 3.0 Drilling Intersects Anomalous Radioactivity in Previously Untested Broach Lake Target at PLN

Exploration Programs

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Suite 750 – 1620 Dickson Ave.

Kelowna, BC V1Y 9Y2

[email protected]

www.fission3corp.com

TSX VENTURE SYMBOL : FUU

OTC SYMBOL : FISOF March 2, 2021

Fission 3.0 Drilling Intersects Anomalous Radioactivity in

Previously Untested Broach Lake Target at PLN

FISSION 3.0 CORP (“Fission 3” or “the Company”) is pleased to announce drilling on two

previously untested targets at its 100% owned PLN project in the SW Athabasca Basin region of

Saskatchewan, Canada. Drilling at Broach Lake has encountered encouraging anomalous

radioactivity associated with a brecciated fault zone in basement rock in hole PLN22-031. The

Broach Lake conductors are located in the south-east region of the property and are situated 9km

to the north, adjacent and parallel to EM conductors of the Patterson Lake Structural Corridor, host

to Fission Uranium’s Triple R deposit and NexGen’s Arrow Deposit.

The 6-hole winter 2022 drill program at PLN is designed to assess by drilling 2 previously

untested target areas: Five holes on the Broach Lake conductors and one hole on the N Conductors

in the northern part of the property. The winter drill program is ongoing, and two holes remain to

be drilled at Broach Lake.

Hole PLN22-031 is the third drill hole to be completed at Broach Lake this winter and intersected

anomalous radioactivity in basement rocks between 371.6 – 371.9m, with a maximum of 510cps

radioactivity, measured with a hand held RS-125 scintillometer, and a peak of 2,383 cps with the

down-hole gamma survey. The anomalous results are associated with a narrow brecciated fault

zone. Also very encouraging is a major 30m wide graphitic mylonitic fault zone encountered a

further 150m down-hole. The first two holes at Broach Lake (PLN22-028 and 030B) encountered

visible dravite. Dravite is a boron-rich clay mineral, often found in association with uranium

mineralization and is considered an important pathfinder mineral in uranium exploration. The

combination of anomalous radioactivity within a fault zone, and association of dravite clay and

large graphitic mylonites is very encouraging as these are hallmark features often associated with

high-grade mineralization in the Athabasca Basin.

Raymond Ashley P. Geo, VP Exploration for Fission 3.0 commented, “Encountering the

right structural setting, graphitic mylonitic shear zones, dravite clay and anomalous

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

radioactivity on our 1st pass of drilling at Broach Lake, very much elevates the potential

for uranium mineralization at this target area. These are important features in nearby

deposits such as Fission Uranium’s Triple R and NexGen Energy’s Arrow deposits. The

technical team is encouraged by the results of the Broach Lake so far”

Details of Drill Holes

Broach Lake Target

PLN22-028 and PLN22-030B: Visible dravite, a boron-rich clay mineral and often found in the

proximity of uranium mineralization, was observed in multiple narrow basement hosted fractures

in the first two holes at Broach Lake (PLN22-028 and 030B), approximately 20m below the

unconformity at a depth 280m. All three holes at Broach Lake (PLN22-028, 030B and 031)

intersected variable intervals of strong chlorite, clay, and silica alteration as well as bleaching and

intense hematite alteration.

PLN22-031: Anomalous radioactivity with a maximum of 510cps radioactivity measured with the

hand held RS-125 scintillometer on drill core at 373.6m to 373.9m corresponded to a 0.6m interval

with radioactivity in the down hole gamma survey with an average of 1499cps and a peak of

2383cps. It was the first hole testing the new conductor defined by ground EM geophysical

surveys conducted earlier this winter (NR Jan 10, 2022). A large 30m-wide graphitic mylonitic

fault zone with ductile shearing was intersected 150m deeper in the hole. Hole PLN22-031 was

terminated at 620m and the drill has since moved to test the same conductor closer to the

unconformity and further along strike (hole PLN22-032) where it intersects a coinciding NE

trending resistivity low feature.

N Conductor Target

PLN22-029: Drill hole PLN22-029 was an exploration hole drilled testing the deep N Conductor

complex 22km north of Broach Lake in the northern part of the property. The N Conductor is

defined by multiple parallel basement EM conductors, and the overlying low resistivity zone in the

lower part of the Athabasca sandstone. The resistivity low is a geophysical feature interpreted to

possibly represent hydrothermal alteration. The unconformity was intersected at a depth of

675.9m and the drill hole intersected multiple structures in the basement gneisses within a 91m

core interval that were strongly graphitic in very broken sections of core that display cataclastic

and mylonitic textures indicative of both ductile shearing and brittle faulting. Anomalous

radioactivity of 300cps measured with a hand held RS-125 scintillometer, was encountered in the

drill hole at a depth of 783.8m.

Natural gamma radiation in drill core that is reported in this news release was measured in counts

per second (cps) using a hand held RS-125 scintillometer by Radiation Solutions. Natural gamma

radiation in the drill hole surveys that are reported in this news release was measured in counts per

second (cps) using a QL40-GRA borehole gamma probe by Mount Sopris Instruments. The reader

is cautioned that scintillometer readings are not directly or uniformly related to uranium grades of

the rock sample measured and should be used only as a preliminary indication of the presence of

radioactive materials. All intersections are down-hole. All depths reported of core interval

measurements of radioactivity are not always representative of true thickness.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

‘Please check out more information and Maps on the Fission 3.0 website’:

https://www.fission3corp.com/

About Patterson Lake North:

The Patterson Lake North property (PLN) lies adjacent and immediately north of the Patterson

Lake South property (PLS), owned by Fission Uranium Corp. where uranium mineralization has

been traced by core drilling at PLS over ~3.18 km of east-west strike length in five separated

mineralized “zones” which collectively make up the Triple R deposit, and where a Feasibility

Study has commenced. Previous drilling at PLN by Fission 3 in 2014 identified a mineralized

structure associated with the ~3 km long A1 conductor with strongly anomalous geochemistry,

including uranium values, in addition to common pathfinder elements including boron, copper,

nickel and zinc. Drill hole PLN 14-019 intercepted a 7.5 m interval (191.5 m – 199.0 m) of

anomalous radioactivity with peak measurements up to 1450 cps (as measured by handheld

spectrometer) over 0.5 m within a strongly clay altered and brecciated graphitic gneiss which

assayed 0.5 m of 0.47% U3O8 within 6.0 m of 0.12% U3O8.

About Fission 3.0 Corp.

Fission 3.0 Corp. is a uranium project generator and exploration company, focusing on projects in

the Athabasca Basin, home to some of the world’s largest high-grade uranium discoveries. Fission

3.0 currently has 16 projects in the Athabasca Basin. Several of Fission 3.0’s projects are near

large uranium discoveries, including Arrow, Triple R and Hurricane deposits.

Qualified Person

The technical information in this news release has been prepared in accordance with the

Canadian regulatory requirements set out in National Instrument 43-101 and reviewed on behalf

of the company by Raymond Ashley, P.Geo., Vice President, Exploration of Fission 3.0 Corp.,

a qualified person.

ON BEHALF OF THE BOARD Investor Relations

Ph: 778-484-8030

"Dev Randhawa" TF: 844-484-8030

[email protected]

Dev Randhawa, CEO www.fission3corp.com

Cautionary Statement: Certain information contained in this press release constitutes

"forward-looking information", within the meaning of Canadian legislation. Generally,

these forward-looking statements can be identified by the use of forward-looking

terminology such as "plans", "expects" or "does not expect", "is expected", "budget",

"scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or

"believes", or variations of such words and phrases or state that certain actions, events

or results "may", "could", "would", "might" or "will be taken", "occur", "be achieved" or

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

"has the potential to". Forward looking statements contained in this press release may

include statements regarding the future operating or financial performance of Fission 3.0

Corp. which involve known and unknown risks and uncertainties which may not prove to

be accurate. Actual results and outcomes may differ materially from what is expressed or

forecasted in these forward-looking statements. Such statements are qualified in their

entirety by the inherent risks and uncertainties surrounding future expectations. Among

those factors which could cause actual results to differ materially are the following:

market conditions and other risk factors listed from time to time in our reports filed with

Canadian securities regulators on SEDAR at www.sedar.com. The forward-looking

statements included in this press release are made as of the date of this press release

and Fission 3 Corp. disclaim any intention or obligation to update or revise any forward-

looking statements, whether as a result of new information, future events or otherwise,

except as expressly required by applicable securities legislation.