F3 Resumes Drill Program Targeting A1 and B1 Shears
F3 Resumes Drill Program Targeting A1 and
B1 Shears
Kelowna, British Columbia--(Newsfile Corp. - May 7, 2024) -
F3 Uranium Corp
(TSXV: FUU)
(OTCQB: FUUFF)
("
F3
" or "
the Company
") is pleased to announce that drill crews have mobilized to
site, and drilling has resumed on the PLN Property. Two diamond drills will focus on exploration drilling to
the south of the JR Zone for new mineralized zones along the ~5km long A1/B1 structural corridor.
The program will test new targets generated from the 30-hole winter drilling program along the A1 and
B1 systems.
Drilling will initially focus on the area where a significant reverse fault with vertical offset
exceeding 100 meters, likely related to the Harrison Fault or the Harrison Fault itself, is interpreted to
crosscut the main conductor system including the A1 and B1 shears (see NR dated April 16, 2024). High
priority drill targets include both the A1 and B1 shear intersects with the large displacement reverse fault,
the "nose" of the sandstone hosted and strongly graphitic basement wedge, as well as the area directly
between the A1 and B1 shears as defined by new ground EM which is also highlighted by a resistivity
anomaly. The A1 shear itself will continue to be targeted for additional mineralized zones similar to the
high-grade JR Zone, starting with the area around PLN24-140 which was drilled within an 800m long
segment along the A1 shear with no previous drilling and intersected the strongest downhole
radioactivity outside of the JR Zone itself.
Sam Hartmann P.Geo, VP Exploration, commented:
"We have spent the last few weeks developing new geological and geophysical models, incorporating
the wealth of data collected in drillholes and through geophysical inversions, and the F3 technical team is
eager to resume the drill program with five drill holes already pre-cased from the end of the winter
program. We see the potential for the PLN property, in particular the A1 and B1 conductor system, to
host additional uranium mineralization based on structure and alteration. At the south end of A1, as well
as at B1, new ground EM modeling has developed high priority targets in close association with the
crosscutting fault - a reverse fault with a significant and favorable magnitude of vertical displacement,
and we look forward to testing those structural confluences and the other new targets with the drill bit this
spring and summer."
The ground gravity survey over the southwest sections of the PLN and Broach properties is set to
resume later this week, surveying on land and infilling between areas that were surveyed from the lake
ice this winter. This survey aims to add to the understanding of the A1 and B1 areas, in addition to other
regional conductive corridors to the northeast and southwest of the A1/B1 corridor. Follow-up ground EM
and Resistivity will be carried out over gravity targets as appropriate, to further define distinct drill
targets.
About Patterson Lake North:
The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within
the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen
Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area
of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial
Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km
northwest of Fission Uranium's Triple R deposit. The PLN property is part of the PLN Project which also
includes the Minto and Broach properties.
Qualified Person
The technical information in this news release has been prepared in accordance with the Canadian
regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by
Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has
verified the data disclosed.
About F3 Uranium Corp.
F3 Uranium is a uranium project generator and exploration company, focusing on projects in the
Athabasca Basin, home to some of the world's largest high grade uranium discovery. F3 Uranium
currently has 18 projects in the Athabasca Basin. Several of F3's projects are near large uranium
discoveries including Triple R, Arrow and Hurricane.
Forward-Looking Statements
This news release contains certain forward-looking statements within the meaning of applicable
securities laws. All statements that are not historical facts, including without limitation, statements
regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions,
expectations or beliefs of future performance, including statements regarding the suitability of the
Properties for mining exploration, future payments, issuance of shares and work commitment funds,
entry into of a definitive option agreement respecting the Properties, are "forward-looking statements."
These forward-looking statements reflect the expectations or beliefs of management of the Company
based on information currently available to it. Forward-Looking statements are subject to a number of
risks and uncertainties, including those detailed from time to time in filings made by the Company with
securities regulatory authorities, which may cause actual outcomes to differ materially from those
discussed in the forward-looking statements. These factors should be considered carefully and readers
are cautioned not to place undue reliance on such forward-looking statements. The forward-looking
statements and information contained in this news release are made as of the date hereof and the
Company undertakes no obligation to update publicly or revise any forward-looking statements or
information, whether as a result of new information, future events or otherwise, unless so required by
applicable securities laws.
The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or
disapproved the contents of this press release, and do not accept responsibility for the adequacy or
accuracy of this release.
F3 Uranium Corp.
750-1620 Dickson Avenue
Kelowna, BC V1Y9Y2
Contact Information
Investor Relations
Telephone: 778 484 8030
Email:
ON BEHALF OF THE BOARD
"Dev Randhawa"
Dev Randhawa, CEO
To view the source version of this press release, please visit
https://www.newsfilecorp.com/release/208208