Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

FUU.V ·

F3 Intersects Radioactivity Across Multiple Zones Uncovers Significant and Favorable Reverse Faulting at B1

Exploration Programs

F3 Intersects Radioactivity Across Multiple

Zones

Uncovers Significant and Favorable Reverse Faulting at B1

Kelowna, British Columbia--(Newsfile Corp. - April 16, 2024) -

F3 Uranium Corp

(TSV: FUU)

(OTCQB: FUUFF)

("

F3

" or "

the Company

") is pleased to announce the completion of the first 30 drill

holes (totaling 12,100 meters) of its 2024 winter drill program. JR Zone has continued to yield high grade

intercepts, such as PLN23-137 which intersected mineralization within a 18.5m interval including

1.25m

of composite off-scale mineralization

(>65,535 cps),

while the Company's focus has expanded to

the discovery of additional mineralized zones along the A1 and B1 structures, with

numerous

radioactive intercepts

along both shears, generating additional drill targets.

Ray Ashley, President, commented: "We are very pleased with the results from this winter's drill

program, and the number of new targets generated along both the A1 and B1 systems. The scale of

reverse faulting in conjunction with related massive graphitic fault structures at B1 was unexpected and

supports our theory that the majority of B1 drilling south of line 2850 may have been in the footwall of this

fault, where intense alteration and frequent radioactive intercepts suggest the presence of a nearby

source. At A1, considerable undrilled gaps remain open for exploration, such as the 800m gap where

hole PLN24-140 was drilled, returning over 11,000 cps on the gamma probe within the shear. With a

large-scale gravity survey underway, in addition to a joint inversion of ground EM and resistivity

geophysics, we continue to develop new targets for the drill program slated to resume in May after a

short pause for seasonal breakup."

A1 Shear Zone

A1, which is host to the high-grade JR Zone, contains several significant undrilled sections: PLN24-140

was collared on line 2325S, within a 800m long area along the A1 with no previous drilling, and

intersected up to 560 cps on the handheld spectrometer, and up to 11,000 cps on the QL40 GRA

gamma probe. Prior to PLN24-140, gamma probe readings greater than 10,000 cps had not been

encountered outside of the JR Zone, resulting in a priority target for the program resumption in May.

B1 Shear Zone

At B1, a total of nine drill holes targeted the intense alteration and structure intersected during the 2023

drill campaign, as these features often occur in close proximity to high grade uranium mineralization.

Five drill holes intersected anomalous radiation over a total strike length of 600m.

Drill hole PLN24-133

targeted an area near the northern end of the B1 shear zone where a significant change in Athabasca

Sandstone depth was expected and encountered a basement wedge in excess of 120m downhole

thickness within the sandstone exhibiting strong alteration and deformation (see Cross Section for line

2850S below). Figure 1 shows the lower structural Athabasca Unconformity at a depth of 291.2m, with

significantly structurally disturbed sandstone beneath. An extremely graphitic structure was intersected

within this wedge (see Figure 2), and in all follow up drilling on section and along strike. Drilling on line

2850S with PLN24-138 and PLN24-142 and step out drilling on line 2820S with PLN24-144 confirmed

that the strike of this very significant offsetting reverse structure appears to be discordant to the B1 main

shear, and likely related to the Harrison fault, a significant regional structure which played an important

role in the development of the Athabasca basin.

This magnitude of displacement along wide and strongly graphitic basement faults is highly favorable,

and structurally comparable to what is seen at some of the largest uranium deposits in the basin. This

now provides a number of drill targets for high grade uranium mineralization including the unconformity

contacts, as well as the basement "nose" at the terminus of the wedge within the sandstone, with a focus

on where the A1 and B1 structures intercept this offsetting reverse fault.

Drilling Highlights

PLN24-137

(line 040S): JR Zone

18.5m

interval with mineralization from 201.0m - 219.5m, including

1.25m composite off-scale radioactivity (> 65,535 cps)

between 214.5m and 216.0m

A1 Radioactive Drilling Intercepts:

PLN24-117

(line 000): JR Zone

8.0m

mineralized interval from 261.0m - 269.0m

PLN24-119

(line 045S): JR Zone

3.5m

mineralized interval from 256.0m - 259.5m,

and

4.0m

mineralized interval from 265.0m - 269.0m

PLN24-128

(line 030S): JR Zone

1.5m

mineralized interval from 216.0m - 217.5m,

and

0.5m

mineralized interval from 271.5m - 272.0m

PLN24-129

(line 015S): JR Zone

0.5m

mineralized interval from 208.0m - 208.5m,

and

5.5m

mineralized interval from 215.0m - 220.5m

PLN24-131

(line 795S): A1 Exploration

0.5m

mineralized interval from 252.5m - 253.0m

PLN24-139

(line 795S): A1 Exploration

0.5m

mineralized interval from 143.0m - 143.5m,

and

0.5m

mineralized interval from 191.0m - 191.5m

PLN24-140

(line 2325S): A1 Exploration

0.5m

mineralized interval from 175.5m - 176.0m,

and

0.5m

mineralized interval from 216.5m - 217.0m

B1 Radioactive Drilling Intercepts:

PLN24-122 (line 3450S):

B1 Exploration

0.5m

mineralized interval from 596.5m - 597.0m

PLN24-135 (line 3240S):

B1 Exploration

0.5m

mineralized interval from 380.5m - 381.0m,

and

2.5m

mineralized interval from 387.0m - 389.5m,

and

0.5m

mineralized interval from 642.0m - 642.5m

PLN24-138 (line 2850S):

B1 Exploration

0.5m

mineralized interval from 473.0m - 473.5m,

and

2.0m

mineralized interval from 533.5m - 535.5m

PLN24-141 (line 3240S):

B1 Exploration

0.5m

mineralized interval from 464.0m - 464.5m, and

0.5m

mineralized interval from 546.0m - 546.5m

PLN24-142 (line 2850S):

B1 Exploration

0.5m

mineralized interval from 319.0m - 391.5m

Natural gamma radiation in the drill core that is reported in this news release was measured in counts

per second (cps) using a handheld Radiation Solutions RS-125 scintillometer. The Company considers

greater than 300 cps on the handheld spectrometer as anomalous, >10,000 cps as high grade and

greater than 65,535 cps as off-scale. The reader is cautioned that scintillometer readings are not directly

or uniformly related to uranium grades of the rock sample measured and should be used only as a

preliminary indication of the presence of radioactive materials. Samples from the drill core are split in

half on site and are standardized at 0.5m lengths. One half of the split sample will be submitted to SRC

Geoanalytical Laboratories (an SCC ISO/IEC 17025: 2005 Accredited Facility) in Saskatoon, SK. for

lithogeochemical analysis using their "Uranium Package."

All depth measurements reported are down-hole and true thicknesses are yet to be determined.

Table 1. Drill Hole Summary and Handheld Spectrometer Results

Collar Information

* Hand-held Spectrometer Results On

Mineralized Drillcore (>300 cps / >0.5m

minimum)

Athabasca

Unconformity

Depth (m)

Total

Drillhole

Depth (m)

Hole ID

Section

Line

Easting

Northing

Elevation

Az

Dip

From

(m)

To

(m)

Interval

(m)

Max CPS

PLN24-117

000

587655.7

6410710.8

544.7

54.1

-54.4

261.00

261.50

0.50

310

221.7

329.0

261.50

262.50

1.00

<300

262.50

263.00

0.50

410

263.00

263.50

0.50

450

263.50

264.00

0.50

570

264.00

264.50

0.50

1000

264.50

265.00

0.50

1900

265.00

265.50

0.50

320

265.50

266.00

0.50

310

266.00

266.50

0.50

<300

266.50

267.00

0.50

3100

267.00

267.50

0.50

810

267.50

268.00

0.50

470

268.00

268.50

0.50

<300

268.50

269.00

0.50

320

PLN24-118

3240S

589686.9

6408181.3

534.7

54.0

-70.7

B1 MSZ Exploration; no radioactivity >300 cps

351.9

632.0

PLN24-119

045S

587688.1

6410678.8

545.3

54.2

-62.1

256.00

256.50

0.50

370

n.a.

326.0

256.50

257.00

0.50

1300

257.00

257.50

0.50

670

257.50

258.00

0.50

720

258.00

258.50

0.50

<300

258.50

259.00

0.50

480

259.00

259.50

0.50

380

265.00

265.50

0.50

750

265.50

266.00

0.50

950

266.00

268.00

2.00

<300

268.00

268.50

0.50

320

268.50

269.00

0.50

480

PLN24-120

150S

587778.3

6410614.7

545.6

53.9

-59.8

A1 MSZ exploration; no radioactivity >300 cps

n.a.

302.0

PLN24-121

090N

587651.1

6410818.9

545.4

52.4

-60.2

A1 MSZ exploration; no radioactivity >300 cps

203.2

317.0

PLN24-122

3450S

589879.7

6408062.4

538.4

55.2

-66.0

596.50

597.00

0.50

470

341.8

683.0

PLN24-123

015N

587736.6

6410788.7

545.6

54.9

-65.5

A1 MSZ exploration; no radioactivity >300 cps

n.a.

305.0

PLN24-124

240S

587846.9

6410598.5

546.0

78.6

-66.7

A1 MSZ exploration; no radioactivity >300 cps

158.2

326.0

PLN24-125

090N

587634.3

6410806.6

545.2

51.9

-60.2

A1 MSZ exploration; no radioactivity >300 cps

203.9

359.0

PLN24-126

3555S

589878.4

6407928.7

532.2

55.2

-61.3

B1 MSZ Exploration; no radioactivity >300 cps

353.2

558.5

PLN24-127

045S

587794.4

6410756.0

545.7

54.8

-60.5

A1 MSZ exploration; no radioactivity >300 cps

199.0

302.0

PLN24-128

030S

587749.6

6410742.4

545.7

53.5

-60.4

216.00

216.50

0.50

490

202.0

290.0

216.50

217.00

0.50

2000

217.00

217.50

0.50

3000

271.50

272.00

0.50

300

PLN24-129

015S

587747.0

6410758.9

545.7

54.2

-61.5

208.00

208.50

0.50

300

200.5

322.0

215.00

215.50

0.50

1400

215.50

216.00

0.50

5200

216.00

216.50

0.50

7600

216.50

216.65

0.15

4200

216.65

217.00

0.35

16500

217.00

217.50

0.50

5600

217.50

217.65

0.15

3600

217.65

218.00

0.35

15100

218.00

218.50

0.50

2900

218.50

219.00

0.50

<300

219.00

219.50

0.50

480

219.50

220.00

0.50

490

220.00

220.50

0.50

470

PLN24-130

1005S

589527.1

6410832.3

539.1

55.1

-65.0

PNG-6A MSZ Exploration; no radioactivity >300

cps

n.a.

392.0

PLN24-131

795S

588288.1

6410188.1

532.5

55.0

-65.1

252.50

253.00

0.50

410

123.8

374.0

PLN24-132

090S

587708.0

6410637.5

545.6

55.0

-58.1

A1 MSZ exploration; no radioactivity >300 cps

n.a.

335.0

PLN24-133

2850S

589506.9

6408515.5

529.3

55.0

-71.7

B1 MSZ Exploration; no radioactivity >300 cps

164.1,

290.0,313.3

503.0

PLN24-134

435S

587868.1

6410326.1

530.7

53.6

-64.6

A1 MSZ exploration; no radioactivity >300 cps

n.a.

440.0

PLN24-135

3240S

589630.4

6408142.8

535.4

52.1

-70.3

380.50

381.00

0.50

370

351.2

647.0

387.00

387.50

0.50

850

387.50

388.00

0.50

720

388.00

388.50

0.50

520

388.50

389.00

0.50

1100

389.00

389.50

0.50

730

642.00

642.50

0.50

560

PLN24-136

630S

588165.6

6410302.3

536.3

54.4

-58.7

A1 MSZ exploration; no radioactivity >300 cps

n.a.

323.0

PLN24-137

040S

587780.2

6410753.3

545.6

55.4

-75.0

201.00

201.50

0.50

330

184.4

305.0

201.50

202.00

0.50

580

202.00

202.50

0.50

380

202.50

203.00

0.50

1000

203.00

203.50

0.50

1000

203.50

204.00

0.50

2200

204.00

204.50

0.50

820

204.50

205.00

0.50

680

205.00

205.50

0.50

940

205.50

206.00

0.50

1500

206.00

206.50

0.50

3300

206.50

207.00

0.50

860

207.00

207.50

0.50

1400

207.50

208.00

0.50

1400

208.00

208.50

0.50

1100

208.50

209.00

0.50

990

209.00

209.50

0.50

760

209.50

210.00

0.50

520

210.00

210.50

0.50

570

210.50

211.00

0.50

390

211.00

211.50

0.50

330

211.50

212.00

0.50

310

212.00

212.50

0.50

360

212.50

213.00

0.50

<300

213.00

213.50

0.50

580

213.50

214.00

0.50

540

214.00

214.50

0.50

8000

214.50

215.00

0.50

65535

215.00

215.25

0.25

63200

215.25

215.50

0.25

65535

215.50

216.00

0.50

65535

216.00

216.20

0.20

14700

216.20

216.50

0.30

4800

216.50

217.00

0.50

520

217.00

217.50

0.50

1700

217.50

219.00

1.50

<300

219.00

219.50

0.50

310

PLN24-138

2850S

589493.8

6408505.0

530.1

51.8

-75.6

473.00

473.50

0.50

380

165.3, 273.9,

313.0

563.0

533.50

534.00

0.50

300

534.00

534.50

0.50

620

534.50

535.00

0.50

320

535.00

535.50

0.50

430

PLN24-139

795S

588289.3

6410186.5

532.6

54.0

-58.9

143.00

143.50

0.50

320

134.6

296.0

191.00

191.50

0.50

330

PLN24-140

2325S

589060.2

6408857.6

543.9

55.7

-60.2

175.50

176.00

0.50

330

n.a.

275.0

216.50

217.00

0.50

560

PLN24-141

3240S

589622.4

6408136.8

535.5

-72.9

57.7

464.00

464.50

0.50

350

350.9

665.0

546.00

546.50

0.50

410

PLN24-142

2850S

589560.6

6408554.7

530.5

-76.3

53.5

391.00

391.50

0.50

1200

162.6

517.5

PLN24-143

2325S

589059.0

6408856.8

543.9

-67.4

54.7

A1 MSZ exploration; no radioactivity >300 cps

n.a.

326.0

PLN24-144

2820S

589485.3

6408554.4

529.6

54.1

-74.8

B1 MSZ exploration; no radioactivity >300 cps

149.5, 304.0,

304.6

479.0

PLN24-145

2325S

589095.3

6408883.2

543.9

52.9

-65.6

A1 MSZ exploration; no radioactivity >300 cps

n.a.

299.0

Figure 1: PLN24-133 (line 2850S): Lower Structural Athabasca Unconformity

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8110/205638_7c9e3c52247bda87_002full.jpg

Figure 2: PLN24-144 (line 2820S): Basement wedge hosted graphitic fault

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/8110/205638_7c9e3c52247bda87_003full.jpg

The Company contracted Patterson Geophysics Inc. ("

Patterson

") to complete 65 line-km of fixed loop

SQUID electromagnetic survey coverage (FL-SQUID-EM) over the B1 target area, to measure the

induced electromagnetic ("

EM

") fields associated with sandstone alteration effects as well as the

response to dipping basement conductors. A trace of this conductor model projected to surface is

shown on Map 1, and notably deviated in strike from the original B1 conductor model. The data collected

by Patterson was used to target and successfully drill the large graphitic structure associated with the

basement wedge intersected in PLN24-133.

Dias Geophysical Ltd. completed the 3D DC resistivity and induced polarization (DCIP) over the

northern A1 area hosting the JR Zone, and the B1 area, using their DIAS32 system. F3 has engaged a

contractor to process and perform 3D inversion modeling of resistivity and EM geophysical data jointly

and in conjunction with all the drilling data to better resolve thin basement hosted conductors.

Initial Exploration Services Inc. has been contracted to conduct a ground gravity survey over the

southwest section of the PLN and Broach properties. The survey is currently focusing on surveying the

lakes and waterbodies using ice cover, with the remainder of the survey area to be infilled in late spring,

and F3 aims to disclose those results once all the data has been collected and interpreted.

About Patterson Lake North:

The Company's 4,078-hectare 100% owned Patterson Lake North property (PLN) is located just within

the south-western edge of the Athabasca Basin in proximity to Fission Uranium's Triple R and NexGen

Energy's Arrow high-grade world class uranium deposits which is poised to become the next major area

of development for new uranium operations in northern Saskatchewan. PLN is accessed by Provincial

Highway 955, which transects the property, and the new JR Zone uranium discovery is located 23km

northwest of Fission Uranium's Triple R deposit. The PLN property is part of the PLN Project which also

includes the Minto and Broach properties.

Qualified Person

The technical information in this news release has been prepared in accordance with the Canadian

regulatory requirements set out in National Instrument 43-101 and approved on behalf of the company by

Raymond Ashley, P.Geo., President & COO of F3 Uranium Corp, a Qualified Person. Mr. Ashley has

verified the data disclosed.

About F3 Uranium Corp.

F3 Uranium is a uranium project generator and exploration company, focusing on projects in the

Athabasca Basin, home to some of the world's largest high grade uranium discovery. F3 Uranium

currently has 18 projects in the Athabasca Basin. Several of F3's projects are near large uranium

discoveries including Triple R, Arrow and Hurricane.

Forward Looking Statements

This news release contains certain forward-looking statements within the meaning of applicable

securities laws. All statements that are not historical facts, including without limitation, statements

regarding future estimates, plans, programs, forecasts, projections, objectives, assumptions,

expectations or beliefs of future performance, including statements regarding the suitability of the

Properties for mining exploration, future payments, issuance of shares and work commitment funds,

entry into of a definitive option agreement respecting the Properties, are "forward-looking statements."

These forward-looking statements reflect the expectations or beliefs of management of the Company

based on information currently available to it. Forward-looking statements are subject to a number of

risks and uncertainties, including those detailed from time to time in filings made by the Company with

securities regulatory authorities, which may cause actual outcomes to differ materially from those

discussed in the forward-looking statements. These factors should be considered carefully and readers

are cautioned not to place undue reliance on such forward-looking statements. The forward-looking

statements and information contained in this news release are made as of the date hereof and the

Company undertakes no obligation to update publicly or revise any forward-looking statements or

information, whether as a result of new information, future events or otherwise, unless so required by

applicable securities laws.

The TSX Venture Exchange and the Canadian Securities Exchange have not reviewed, approved or

disapproved the contents of this press release, and do not accept responsibility for the adequacy or

accuracy of this release.

F3 Uranium Corp.

750-1620 Dickson Avenue

Kelowna, BC V1Y9Y2

Contact Information

Investor Relations

Telephone: 778 484 8030

Email:

[email protected]

ON BEHALF OF THE BOARD

"Dev Randhawa"

Dev Randhawa, CEO

See 2 plan maps and B1 cross section showing basement wedge below.

See drill cross sections at

PLN Project|F3 Uranium Corp.

Map 1: PLN Winter 2024 Drill Program - Update: Scintillometer Results

To view an enhanced version of this graphic, please visit: